Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm

Slides:



Advertisements
Similar presentations
Cable inventory, relative measurements and 1 st mechanical computations STUDY OF THE QUADRUPOLE COLLAR STRUCTURE P. Fessia, F. Regis Magnets, Cryostats.
Advertisements

S. Caspi, LBNL HQS Progress Report High Field Nb 3 Sn Quadrupole Magnet Shlomo Caspi LBNL Collaboration Meeting – CM11 FNAL October 27-28, 2008.
Superconducting Large Bore Sextupole for ILC
LARP QXF 150mm Structure Mike Anerella / John Cozzolino / Jesse Schmalzle November 15, nd Joint HiLumi LHC-LARP Annual Meeting.
MQXF Design and Conductor Requirements P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
2 nd Joint HiLumi LHC – LARP Annual Meeting INFN Frascati – November 14 th to 16 th 2012 Helene Felice Paolo Ferracin LQ Mechanical Behavior Overview and.
LQ Goals and Design Study Summary – G. Ambrosio 1 LARP Collab Mtg – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC LQ Goals & Design Summary Giorgio Ambrosio.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
SC magnet developments at CEA/Saclay Maria Durante Hélène Felice CEA Saclay DSM/DAPNIA/SACM/LEAS.
Triplet status and plans P. Ferracin, G. Ambrosio, M. Anerella, A. Ballarino, B. Bordini, F. Borgnolutti, R. Bossert, D. Cheng, D.R. Dietderich, B. Favrat,
ASC 2014Nb 3 Sn Block Coil Dipoles for a 100 TeV Hadron Collider – G. Sabbi 1 Performance characteristics of Nb 3 Sn block-coil dipoles for a 100 TeV hadron.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
Review of Quench Limits FermilabAccelerator Physics Center Nikolai Mokhov Fermilab 1 st HiLumi LHC / LARP Collaboration Meeting CERN November 16-18, 2011.
MQXF Design and Conductor Requirements P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
MQXF support structure An extension of LARP experience Helene Felice MQXF Design Review December 10 th to 12 th, 2014 CERN.
Susana Izquierdo Bermudez. Contents 1. Introduction 2. Coil cross section 3. Magnet parameters at operation conditions 1. Peak field 2. Physical and magnetic.
CERN Accelerator School Superconductivity for Accelerators Case study 1 Paolo Ferracin ( ) European Organization for Nuclear Research.
CERN Accelerator School Superconductivity for Accelerators Case study introduction Paolo Ferracin CERN, Geneva Claire Antoine
Subscale quadrupole (SQ) series Paolo Ferracin LARP DoE Review FNAL June 12-14, 2006.
Hybrid Structure with Cooling John Cozzolino LARP Collaboration Meeting Port Jefferson, NY November 4-6, 2009.
Magnet design, final parameters Paolo Ferracin and Attilio Milanese EuCARD ESAC review for the FRESCA2 dipole CERN March, 2012.
LARP Collaboration Meeting, April 26-28, 2006Gian Luca Sabbi HQ Design Study (WBS ) LARP Collaboration Meeting April 26-28, 2006 N. Andreev, E.
CERN Accelerator School Superconductivity for Accelerators Case study 3 Paolo Ferracin ( ) European Organization for Nuclear Research.
1 BNL -FNAL - LBNL - SLAC P. Wanderer IR’07 - Frascati 7 November 2007 U.S. LARP Magnet Programme.
Case study 1 : Quadrupole for Hi-Lumi LHC upgrade CAS Erice 2013 Group 1B A. Shornikov, T. Spina, Y. Arimoto, P. V. Gade, K. Brodzinski.
DESIGN STUDIES IR Magnet Design P. Wanderer LARP Collaboration Meeting April 27, 2006.
IR Magnets for Muon Collider Alexander Zlobin and Vadim Kashikhin Muon Collider Physics Workshop, Fermilab November 12, 2009.
HL-LHC Meeting, November 2013D2 Status and Plans – G. Sabbi 1 D2 Conceptual Design Status and Next Steps G. Sabbi, X. Wang High Luminosity LHC Annual Meeting.
S. Caspi, LBNL HQ Magnet Program Shlomo Caspi LBNL LARP DOE Review FNAL June 1-2, 2011 BNL Jesse Schmalze Mike Anarella Peter Wanderer Arup Gosh FNAL Rodger.
BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio Fermilab Many people contributed to this work, most of all the Long Quadrupole Task Leaders:
MQXFS1 Test Results G. Chlachidze, J. DiMarco, S. Izquierdo-Bermudez, E. Ravaioli, S. Stoynev, T. Strauss et al. Joint LARP CM26/Hi-Lumi Meeting SLAC May.
Answers to the review committee G. Ambrosio, B.Bordini, P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
Susana Izquierdo Bermudez for the QXF team Acknowledgements: G. Ambrosio, P. Ferracin, P. Hagen, M. Juchno, G. L. Sabbi, E. Todesco, X. Wang.
QXF magnet integration Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013.
CERN, 11th November 2011 Hi-lumi meeting
16 T dipole in common coil configuration: mechanical design
Massimo Sorbi on behalf of INFN team:
WORK IN PROGRESS F C C Main Quadrupoles FCC week 2017
MQXF Design and Conductor Requirements
TQS Overview and recent progress
TQ Program and Review Charge
Model magnet test results at FNAL
HQ Mirror Assembly R. Bossert
TQS Structure Design and Modeling
MQXF Goals & Plans G. Ambrosio MQXF Conductor Review
16 T Cosq DIPOLE Mechanical Analysis
At ICFA Mini-Workshop on High Field Magnets for pp Colliders,
Mechanical Modelling of the PSI CD1 Dipole
FRESCA2 Update on the dipole design and new calculations
EuroCirCol: 16T dipole based on common coils
Bore quench field vs. critical current density
Glyn Kirby Magnet AssemblyTechniques.
MKQXF FEA Model Haris Kokkinos
MQXF updates P. Ferracin October 9th, 2014.
Large aperture Q4 M. Segreti, J.M. Rifflet
Vincent Roger, Siarhei Yurevich, Cecilia G. Maiano, Mario Sapinski
11T Dipole for the LHC Collimation upgrade
MQXF coil cross-section status
CERN Accelerator School Superconductivity for Accelerators Case study 2 Paolo Ferracin European Organization for Nuclear Research.
P.Fabbricatore & S.Farinon
HL LHC WP3 (magnets) TASK 2 ADVANCEMENT
Large aperture Q4 M. Segreti, J.M. Rifflet
PROPOSAL OF APERTURE FOR THE INNER TRIPLET
Muon Collider SR and IR Magnets
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
Q4 development M. Segreti, J.M. Rifflet, E. Todesco
Review of Quench Limits
Helene Felice 02/15/2013 HiLumi Meeting HQ Program
Cross-section of the 150 mm aperture case
Presentation transcript:

Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm Paolo Ferracin and Ezio Todesco 1st HiLumi LHC / LARP Collaboration Meeting CERN 16-18 November, 2011

Introduction Upgrade of the LHC IR quadrupoles From Nb-Ti 70 mm bore (MQXA from Japan, MQXB from US) to larger apertures Currently under development, 120 mm aperture quadrupoles Nb-Ti: MQXC (CERN-CEA Collaboration) Nb3Sn: HQ - MQXE (US LARP Collaboration) Larger aperture under consideration for Nb-Ti (MQXD) and Nb3Sn (MQXF) Preliminary design study of MQXF, a 140 mm aperture Nb3Sn quadrupole MQXC HQ Paolo Ferracin 06/02/2011

Goals Investigate magnet parameters of an HQ-type quad. with the HQ cable and 140 mm aperture How much do we lose in gradient? How much do we increase the stress? Analyse the potential benefits of using a wider cable than HQ Paolo Ferracin 06/02/2011

Outline From HQ to MQXF Magnet parameters Stress analysis Conclusions Paolo Ferracin 06/02/2011

HQ Shell-based support structure Pre-loaded with bladders OD 570 mm, 1 m long Design focused on pre-load and alignment Five assemblies and tests at 4.4 K carried out Max. grad. achieved: 170 T/m 11.7 T estimated peak field 86% of Iss at 4.4 K Paolo Ferracin 06/02/2011

From HQ to MQXF Magnetic design concept Two cases considered: 15 and 17 mm wide cable 2 layers with similar angles and 4 blocks All harmonics below 1 unit at 2/3 of Rin and 80% Iss Similar iron geometry with OD = 520 mm HQ MQXF_15mm MQXF_17mm Paolo Ferracin 06/02/2011

From HQ to MQXF Mechanical design concept Same support structure concept as HQ Same shell OD and thickness Larger coil OD (aperture + thickness) Collar-pad-yoke thickness reduced by 10 to 15 mm HQ MQXF_15mm MQXF_17mm Paolo Ferracin 06/02/2011

Outline From HQ to MQXF Magnet parameters Stress analysis Conclusions Paolo Ferracin 06/02/2011

Strand properties 0.8 mm strand, 108/127 53% Cu -> Cu/Su: 1.13 Extr. strand meas. (HQ coil 3-4) Jc (4.2 K, 12 T) of 3070 A/mm2 with self field correction This is considered a upper bound for a production We assumed a Jc of 2800 A/mm2 with self field correction This gives 2% reduction in gradient (3 T/m) w.r.t. 3070 A/mm2 Paolo Ferracin 06/02/2011

Cable and coil parameters MQXF_15mm MQXF_17mm From HQ to MQXF_15mm 11% more conductor From MQXF_15mm to 17mm 16% more conductor Units HQ MQXF_15 mm MQXF_17 mm Strand # 35 40 Thickness in/out mm 1.338/1.536 Width 15.150 17.314 Insulation thickness 0.100 Turns per oct. 46 51 52 Area supercond. per oct. mm2 380 422 491 Paolo Ferracin 06/02/2011

Magnet parameters at 1.9 K From HQ to MQXF_15mm 15mm or 17mm ? Loss of 14% in gradient 25% increase of stored energy 15mm or 17mm ? Increase of gradient +3% with 16% more conductor and 15% more stored energy MQXF_15mm MQXF_17mm Units HQ MQXF_15 mm MQXF_17 mm Temperature K 1.9 Loadline margin % 20 Gradient T/m 169 145 149 Peak field T 11.7 11.9 12.1 Stored energy MJ/m 0.85 1.06 1.22 Paolo Ferracin 06/02/2011

Fringe field at 500 mm from the center W.r.t. Nb-Ti version, smaller yoke OD (520 mm) Thicker shell (25 mm), and still missing the LHe vessel (5-10 mm thick) From HQ to MQXF_15mm Fringe field from 0.68 to 9.77 mT From MQXF_15mm to 17mm Fringe field increases to 18.55 mT Is it tolerable ? Is shielding necessary ? Further studies needed HQ MQXF_15mm MQXF_17mm 80% Iss Paolo Ferracin 06/02/2011

Outline From HQ to MQXF Magnet parameters Stress analysis Conclusions Paolo Ferracin 06/02/2011

Stress analysis The HQ case at 169 T/m (80% of Iss) 2D comp. stress Increase pre-load during cool-down Pole turn always under pressure Paolo Ferracin 06/02/2011

Stress analysis The HQ01e case: pole gauges measurements Pole azimuthal stress vs. I2 during training quench up to 170 T/m Linear variation up to maximum current No signs of unloading and pole-coil detachment Paolo Ferracin 06/02/2011

Stress analysis The HQ case at 169 T/m (80% of Iss) Coil peak stress located in inner layer Pole turn during bladder-key operation Pole turn after cool-down Mid-plane turn during excitation Paolo Ferracin 06/02/2011

Stress analysis Comparison at 80% of Iss From HQ to MQXF_15mm IL Lorentz stress: +13% Peak stress: +15 MPa From MQXF_15mm to 17mm Reduction of 10 MPa in peak stress Units HQ MQXF_15 mm MQXF_17 mm IL OL Lorentz stress MPa -100 -120 -113 -128 -108 Paolo Ferracin 06/02/2011

Axial forces and support From HQ to MQXF_15mm Increase of axial force: 25% From MQXF_15mm to 17mm Increase of axial force : 15% Axial support Stainless steel end plate (50 mm thick) Aluminum axial rods (34 mm diameter) Maximum rod stress in MQXF 350 (80% of Iss) to 500 MPa (100% of Iss) Units HQ MQXF_15 mm MQXF_17 mm 80% Iss 100% Iss Axial force MN 0.85 1.32 1.06 1.63 1.22 1.87 Paolo Ferracin 06/02/2011

Conclusions A preliminary design of the 140 mm bore Nb3Sn quadrupole magnet MQXF based on the HQ design has been carried out From HQ to MQXF (in operational cond.) Gradient: from 169 to 145 T/m Stored energy: from 0.85 to 1.06 MJ/m Fringe field: from 0.68 to 9.77 mT Peak stress: from 140 to 150 MPa According to a preliminary 2D mech. analysis, the HQ structure is capable provide pre-load to a 140 mm aperture coil up to Iss Increasing the cable by 2 mm provides additional 4 T/m with a reduction of 10 MPa in coil peak stress, but 15% more conductor and stored energy Next step Further optimization of cable, coil, and support structure Paolo Ferracin 06/02/2011

Appendix Paolo Ferracin 06/02/2011

Stress analysis Comparison at 100% of Iss Similar conclusions as at 80% of Iss Support structure Bladder pressure Up to 55 MPa Shell max stress Up to 340 MPa at 4.5 K Iron maximum tension Below 200 MPa Units HQ MQXF_15 mm MQXF_17 mm IL OL Lorentz stress MPa -154 -184 -173 -193 -167 -195 Paolo Ferracin 06/02/2011

HQ parameters Paolo Ferracin 06/02/2011

MQXF_15mm parameters Paolo Ferracin 06/02/2011

MQXF_17mm parameters Paolo Ferracin 06/02/2011

Stress analysis Coil stress in TQ & HQ with e.m. forces at 1.9 K Iss Technology quadrupole TQ 90 mm bore, 10 mm cable Outer layer overcompressed by -60 MPa at max. gradient High field quadrupole HQ 120 mm bore, 15 mm cable Inner and outer layer with low stress at max gradient 0 MPa 0 MPa 0 MPa -60 MPa Paolo Ferracin 06/02/2011

Stress analysis The HQ case at 169 T/m (80% of Iss) Contact pressure (positive) coil-pole at 4.4 K Contact pressure (positive) coil-pole with e.m. forces Paolo Ferracin 06/02/2011

Saturation effect to Iss Paolo Ferracin 06/02/2011

Support structure options Paolo Ferracin 06/02/2011