INAF-OATs WorkShop – Trieste - 21 June 2013 V.Baldini MA05 INAF-OATs Workshop ESPRESSO Control Electronics Status.

Slides:



Advertisements
Similar presentations
NICS 2 NICS 2 UV-optimized spectrograph UV-optimized spectrograph high resolution IR spectrograph high resolution IR spectrograph call for proposal: deadline.
Advertisements

Network Virtualization and Service Awareness Properties of FNs
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
LHC CMS Detector Upgrade Project US CMS Trigger Upgrade Introduction to Cost & Schedule Wesley Smith, U. Wisconsin Fermilab Directors Review 16 July 2013.
TAB Data Center Renovation Project Planning for Transition of Summer 2013 February 21, 2013 TAB Atrium.
Control and IT Systems status and strategy ALBA, Piotr Goryl on behalf of Michał Ostoja-Gajewski, Krzysztof Wawrzyniak, Łukasz Żytniak, Tadeusz.
PACS IIDR, Noordwijk 1-2 Mar 2001 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause, U. Klaas J. Katzer (ZEISS) Max-Planck-Institut für Astronomie,
Department of Information Technology SHARE New Architecture, Hardware, Disaster Recovery, and System Upgrade Project Update SHARE Service Manager – David.
JJ, your No.#1 high quality manufacturing source ! Electrical Products Since 1998.
Beta Testing: The Contractor’s Perspective Trns·port User Group Meeting October 2005.
MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
CRIRES+ The CRIRES Upgrade Project. CRIRES+: The CRIRES Upgrade Project What is CRIRES? High resolution infrared spectrograph Installed at VLT UT1 R~100,000.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Budget, Schedule, Contingency Mark McKinnon Project Manager.
UVES The Ultraviolet & Visible Echelle Spectrograph John Pritchard ESO p2pp3 Workshop: UVES Overview | | John Pritchard.
Overview of GRETINA I-Yang Lee Lawrence Berkeley National Laboratory GRETINA Auxiliary Detector Workshop Washington University January 2006.
MICE RF TEST STAND Major Milestones (2006) –Testing of BURLE 4616 circuit September 2006 –Testing of 4616 circuit with full amplitude and phase control.
1. THE OSIRIS TUNABLE FILTERS  OSIRIS uses two 100 mm aperture Fabry-Perot tunable filters. One of them is optimized for short wavelengths, and one for.
HARPS-NEF PDR December 6 & 7, HARPS-NEF Program Project Manager Tim Norton.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Controls Department LCLS Maintenance.
SAGE USER ODI MAY 15 TH 2013 Defacto Solutions Limited sl-ect Limited.
Magnet Controls Group LCLS Magnet Controls August 16, Status of the LCLS Magnet PS Controls Needed for First Injection.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
Vacuum - CONTROL SYSTEM 29 June Agenda MSRC design, first ideas and plans – Antonio quiet cooling fans test – Irene some scada SW review - Martin.
Precise wavelength reference for Spirou F. Pepe, F. Wildi, B. Chazelas, C. Lovis, S. Udry.
PACS IIDR 01/02 Mar 2001 Instrument Interfaces1 PACS FPU Opto-mechanical Design Overview and Interfaces J. Schubert MPE.
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
21 March 2007ATF2 Power Supplies ATF2 High Availability DC Magnet Power Supplies By Paul Bellomo, Antonio de Lira, David MacNair and Briant Lam*
X-shooter Phase 2 Users Workshop | Vincenzo Mainieri (USD)
1 US Pixel Mechanics Role Global support structureIntermediate support structureLocal support structure Stave SectorDisk Barrel x (9-11) x5 x (22,40,56)
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
ISD-MASP-S05026 Copyright © Yokogawa Electric Corporation May 2005 Page 1 Honeywell PKS R300 -System quick review June 2005 (Rev. 2) SAMURAI Activities,
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
March 2005, USCMS Trigger video meetingD. Acosta1 Revised Schedule for SP Pre-Production Continued testing of first two pre-production boards over next.
PACS IBDR 27/28 Feb 2002 Digital Processing Unit1/16 DPU PRESENTATION R.Orfei & S. Pezzuto CNR- IFSI.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
ESS WP 12 Project Management & Capabilities Overview Neil Bliss Projects & Mechanical Engineering Group Leader ESS PDR, Lund, 10 th November 2015.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
1 FLITECAM December 11, 2008 Ian McLean (Principal Investigator) UCLA Infrared Laboratory University of California, Los Angeles.
1 FLITECAM April 28, 2009 Ian McLean (Principal Investigator) UCLA Infrared Laboratory University of California, Los Angeles.
Instrument Control Systems Seminar 2014, 20 th -24 th October 2014 Instrument Control Systems 2014 The ESPRESSO Control System Echelle SPectrograph for.
Gas system for NA62 Straw detector Roberto Guida On behalf of Gas Service Team NA62 Straw working meeting, March 26, 2012 Outline: P&I Drawing Schedule.
MICE Project Progress Update Power Converters Rack housing MQ1 to MQ3 magnet power converters –Marshalling for all other quadrupole & dipole units –Houses.
ACES User Interface Workshop #1 Prototype Inspection 22. November 2011.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
Instrument Control Systems Seminar 2014, 20 th -24 th October 2014 ESPRESSO Instrument Control Electronics Veronica Baldini, Igor Coretti A Beckhoff PLC-based.
Instrument Control Systems Seminar, 20 October 2014 Instrument Development Process Hans Dekker.
Cost and schedule for ELENA Beam Transfer Systems W. Bartmann, J. Borburgh, E. Carlier, L. Ducimetiere, T. Fowler, M. Hourican, R. Ostojic, L. Sermeus.
ELENA installation progress F. Butin / ELENA collaboration.
L.Vitale INFN and Univ. Trieste
Cryogenic Plant Electrical and Controls
Cabling for LHCb Upgrade
Instrument Control Systems 2014
GEM DAQ-Chamber Integration Test Stand for GE2/1 & ME0 at Florida Tech
PLC-based control systems at SOLEIL - ICALEPCS 2017
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
The Advantages of a Flat Cable
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
LTU/Undulator Installation Status
Status of the PANDA Solenoid Magnet Production in BINP
LCLS Undulator System Production Management
LTU/Undulator Installation Status
Teleconference ACS – FREIA 19th June 2017
CHIC: Possibilities of Supply
Rack and Interconnect Design in E-plan
Electronic : PH0 (former IH0)
Presentation transcript:

INAF-OATs WorkShop – Trieste - 21 June 2013 V.Baldini MA05 INAF-OATs Workshop ESPRESSO Control Electronics Status

INAF-OATs WorkShop – Trieste - 21 June 2013 ESPRESSO quick overview Echelle SPectrograph for Rocky Exoplanets and Stable Spectroscopic Observations Fiber-fed High efficiency, high resolution Cross dispersed echelle spectrograph Covers the whole visible wavelength range ( nm)

INAF-OATs WorkShop – Trieste - 21 June 2013 ESPRESSO functions overview

INAF-OATs WorkShop – Trieste - 21 June 2013 Progress from the previous phase Final Design Review (14-16 may 2013) –ICE Design Report ( 100 pages) –Interface Control Document for ICE –Electrical Drawings ( 50 sheets) ESPRESSO design frozen at FDR! I. Coretti, V. Baldini

INAF-OATs WorkShop – Trieste - 21 June 2013 ESPRESSO Control Electronics Design

INAF-OATs WorkShop – Trieste - 21 June 2013 ESPRESSO Control Electronics Design

INAF-OATs WorkShop – Trieste - 21 June 2013 ESPRESSO Control Electronics Design Provide power supply from SCP to each cabinet

INAF-OATs WorkShop – Trieste - 21 June 2013 ESPRESSO Control Electronics Design Provide power supply from SCP to each cabinet – Power Budget (UPS and Normal Power Supply)

INAF-OATs WorkShop – Trieste - 21 June 2013 ESPRESSO Control Electronics Design

INAF-OATs WorkShop – Trieste - 21 June 2013 ESPRESSO Control Electronics Design Provide power supply from SCP to each cabinet – Power Budget (UPS and Normal Power Supply) Network

INAF-OATs WorkShop – Trieste - 21 June 2013 ESPRESSO Control Electronics Design Provide power supply from SCP to each cabinet – Power Budget (UPS and Normal Power Supply) Network HW choices - BOM (cabinets-racks, cables, connectors)

INAF-OATs WorkShop – Trieste - 21 June 2013 ESPRESSO Control Electronics Design Provide power supply from SCP to each cabinet – Power Budget (UPS and Normal Power Supply) Network HW choices - BOM (cabinets-racks, cables, connectors) PLC modules choice

INAF-OATs WorkShop – Trieste - 21 June 2013 ESPRESSO Control Electronics Design

INAF-OATs WorkShop – Trieste - 21 June 2013 Beckhoff PLC as new control system Flexibility Low cost Decentralization features Low space occupancy – Lot of advantages

INAF-OATs WorkShop – Trieste - 21 June 2013 Beckhoff PLC as new control system Flexibility Low cost Decentralization features Low space occupancy – Lot of advantages Never used before in ESO permanent instruments

INAF-OATs WorkShop – Trieste - 21 June 2013 Function to control (example)

INAF-OATs WorkShop – Trieste - 21 June 2013 ESPRESSO electrical drawings

INAF-OATs WorkShop – Trieste - 21 June 2013 ESPRESSO electrical drawings

INAF-OATs WorkShop – Trieste - 21 June 2013 ESPRESSO electrical drawings

INAF-OATs WorkShop – Trieste - 21 June 2013 Schedule and FTE September Delta FDR at ESO Until end of Phase C: procurement and assembly November Phase D: system integration in Geneva End of PAE Phase E: installation in Chile, PAC

INAF-OATs WorkShop – Trieste - 21 June 2013 Schedule and FTE Control electronics: – I.Coretti (staff, 2.7 FTE) – V.Baldini (contractor, 2.3 FTE) – S.Galeotta (staff, 0.7 FTE)

INAF-OATs WorkShop – Trieste - 21 June 2013 Schedule and FTE Control electronics: – I.Coretti (staff, 2.7 FTE) – V.Baldini (contractor, 2.3 FTE) – S.Galeotta (staff, 0.7 FTE) Control Software – P.Di Marcantonio (staff, 1.6 FTE) – R.Cirami (staff, 1.8 FTE) – M.Mannetta (contractor, 1.5 FTE) – S.Galeotta (staff, 0.7 FTE)

INAF-OATs WorkShop – Trieste - 21 June 2013 Conclusion and Criticalities FDR successfully passed Ready for purchases – around 120,000 (Beckhoff, Schroff, ESO, RS..), about 400 different items Manufacturing phase will require space for 6-7 cabinets Short on permanent staff