Clean Room Plans Monday, August 23, 2004. --- Hybrids--- Frames--- SensorsModules.

Slides:



Advertisements
Similar presentations
WAREHOUSING MANAGEMENT
Advertisements

WAREHOUSING MANAGEMENT
Lyon Gantry Status TEC meeting Dec D. Contardo Module production in Lyon Rigidifier test on R4 Frame tolerance effect on assembly plates Short term.
Status Brussels GANTRY Ê We have observed a significant influence due to temperature 4 we had a lot of problems with our cooling system (ventilation) Ë.
STATE RECORDS CENTER. PROCESSING ORDERS SUBMITTING NEW INVENTORY THROUGH WEB MODULE.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
Slide 1Module Testing Meeting March 7, 2003US Hybrid/Module/Rod Testing Model-Anthony Affolder US Hybrid/Module/Rod Testing Model Anthony Affolder (for.
US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 1 Slides for the US Si Tracker Institutional Group Leaders Meeting J. Incandela March.
1 UCSB Module Assembly Week of 5/16-5/20. 2 UCSB Parts Inventory 5/23/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd
DOE REVIEW 1/20/04 – Dean White 1 Gantry Module Assembly TOB & TEC Dean White University of California, Santa Barbara.
Slide 1CMS Database Issues-Derek BargeDOE review, January 20, 2004 CMS Database Issues Derek Barge.
CMS Week – UCSB Gantry Status – March 15, 2005 – Dean White 1 Weekly Status Report Production: 84 hybrids bonded last week, all tested fine. 45 modules.
1 UCSB Module Assembly Week of 5/23-5/27. 2 FNAL & UCSB Inventory HybridsSensorsFrames FNALUCSBFNALUCSBFNALUCSB STHPKITSTHPKITSTHPKITSTHPKIT L12pu /
1 UCSB Module Assembly Week of 4/11 – 4/15. 2 UCSB Parts Inventory 4/4/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu ST193 L12pd ST193.
1 UCSB Module Assembly Week of 5/9-5/13. 2 UCSB Parts Inventory 5/9/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd L12su
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
Production Monitoring and QC FCal1 Production Advancement Review February 20, Peter Loch University of Arizona Tucson, Arizona FCal1 Production.
Slide 1 Anthony Affolder US Silicon Meeting, March 9, 2004 Equipment Status ARCS equipment status à Single module and 4 hybrid DAQ equipment status à Vienna.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
Slide 1 Electrical Testing at UCSB -Anthony AffolderDOE review, January 18, 2005 Electrical Testing at UCSB: Hybrids & Modules Anthony Affolder On behalf.
US Module Production June 2, 2005 J. Incandela For the US CMS Tracker Group.
1 UCSB Module Assembly Week of 5/2-5/6. 2 UCSB Parts Inventory 5/9/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd L12su
1 UCSB Module Assembly Week of 4/25 – 4/29. 2 UCSB Parts Inventory 5/2/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu ST193 L12pd ST193.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 21 July 2003 Sam Burke UCSB HEP Group.
INVENTORY TRAINING MODULE 1
CBL Page 1 – Menu Menu Overview Effective shipment processing Pre-delivery and shipment breakdown Shipment processing and running Accessory processing.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
Status Brussels GANTRY Ê Assembly of R3 modules (36 modules) 4 precision of the modules 4 problems with DataBase (not adapted for single sensor modules)
“If you can organize one room and one life you can learn to organize many rooms and many lives” Home Maintenance.
G. Steinbrück 6/21/ Premounting of AOHs for the TEC in Hamburg Georg Steinbrück Hamburg University AOH Meeting, CMS Week 6/21/2005  Status of AOH.
Sensor Testing Phil Turner. LHCb PRR - P. Turner Contents Reception Inspection Metrology Mounting Electrical tests Storage Changes since EDR Results Throughput.
Lyon Gantry Status CERN 15 Sept D. Contardo Calibration Plates and Tools Readiness for production.
WG1 Decommissioning Kickoff Workshop WG1 Decommissioning Kickoff Workshop Long term Storage & ID tooling management R. Vuillermet on behalf of TC team.
Module Assembly Jig Status Cambridge and DESY came to Liverpool Nov. 15 th -16 th for training on module assembly – A complete jig set was sent back with.
Andy Blue WP3 - Glasgow Update Andy Blue. WP3 Meeting Update Module Building –2 nd Module (FZ1) wire bonded last week –Tested on Mon –Re-works yesterday/today.
5S Workplace Organization Northland Community & Technical College Presented by: Tim Bergerson, Robbi Brateng, Mitch Ostrom, Jesse Adkins, Bob Gooden,
FACILITY LAYOUT & LOCATION PROF. DR. ORHAN TORKUL M. RAŞİT CESUR.
B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 1 PXD Ladder Assembly - Conceptual design of jigs -
Tech Site Jobs. Order Fulfillment Duties Maintain bagged room temperature kit components. Assemble kits for shipment. Inform other groups about kit needs.
Summary of Fuse Testing for Barrel Module Fuse Boxes
Status Brussels GANTRY
UCSB Hybrid Bonding & Testing
On behalf of the US TOB testing group
UCSB Testing Status Anthony Affolder
UCSB Testing Status Anthony Affolder
Nicholson Tower Move February 5, 2017.
نظم المعلومات الإدارية PAD334
UCSB Testing Status Anthony Affolder
Vienna Module Production
TEC Module Production Overview
Bari production centre resp. M. de Palma
UCSB Module Assembly Week of 11/28 – 12/2/05 Week of 11/28 – 12/2/2005.
Hybrid & Module Electrical Testing
Module Production in Brussels
First UCSB TEC Module (Pictures)
US Hybrid/Module/Rod Testing Model
L.Fiore Gantry Meeting during the CMS TK week
How do you process 17,200 computers and 5,060 iPads in less than 7 weeks? Frank Spinelli July 10, 2012.
Process Flow For Electronic Component Prep
Module Production in Brussels
Electrical Testing at UCSB: Hybrids & Modules
UCSB Module Assembly Week of 12/5 – 12/9/05 Week of 12/5 – 12/9/2005.
Operations/Failure Analysis
Operations/Failure Analysis
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Operations/Failure Analysis
Equipment Status ARCS equipment status DAQ equipment status
TEC Ring 2 module prototypes J. Hrubec / Inst. für Hochenergiephysik
Presentation transcript:

Clean Room Plans Monday, August 23, 2004

--- Hybrids--- Frames--- SensorsModules

Monday, August 23, 2004Prepared by: Kirsten Affolder, UCSB Storage Plan Hybrid inspection and plating in small clean room (to make more space in testing room) Hybrid boxes will be labeled with batch number Plated hybrids stored in big clean room Bonded and tested hybrids stored in testing room Sensors will have dedicated cabinet in clean room Frames will be stored in anteroom cabinet Tested modules will be moved to high bay daily and stored there until rod assembly Fast track modules will have separate holding area in a cabinet in high bay

Monday, August 23, 2004Prepared by: Kirsten Affolder, UCSB Shipping/Receiving Duties Unpack, sort, store all components Prepare components for production Inspect and plate hybrids Inspect and barcode frames Sort and pair sensors Transport modules in and out of clean room (for gluing, testing, rod assembly) Gluing modules in small clean room Stock gantry cabinet with one weeks production components Prepare all shipments (e.g., TEC modules to Europe)

Monday, August 23, 2004Prepared by: Kirsten Affolder, UCSB To-Do List Order 3 more cabinets and some extra shelves Move small cabinets out of clean room into anteroom Remove printer and set up computer in anteroom Move hybrid inspection materials to small clean room Build cart for transporting modules in and out of clean room Rearrange some clean room and testing room cabinets Set up inventory database of usable-only components