House Construction Budget Plan

Slides:



Advertisements
Similar presentations
The process whereby human beings convert raw materials into finished products or useful goods designed to make ____ product ______ one on-site.
Advertisements

Building Construction and the Environment BOCAbocai.org BOCAbocai.org Building Officials and Code Administrators International, Inc. HUDhud.gov HUDhud.gov.
Unit 2 Construction Process Part Illustrated Words and Concepts Figure 2-1 Schedule of Stages in Typical Single House Construction Figure 2-2 Approvals,
PARKVIEW APARTMENTS 20 Unit Rehabilitation & Site Work ISLA VISTA, CA. Joint Cities-County Affordable Housing Task Group October 23, 2008.
Measuring Carpentry and Miscellaneous Items
Engineered Wall Panels by: Slide show will advance automatically. At any time, you may use the left arrow to back the slide show up, or the right arrow.
MARIETTA MUNICIPAL COURT A presentation for MARIETTA CITY COUNCIL.
Grimsby Secondary School
Civil Engineering & Architecture 2.3 Residential Design.
Chapter 8 Plot Plans.
Floor Plans A floor plan is an important tool. From this plan a designer can determine if the structure will meet the needs of the client and organize.
7 Set of Floor Plans Primary Considerations
Primary Residential Design Considerations
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Single Family Homes in the Shenandoah Valley Va, Florence Ave Waynesboro, Class Sq.Ft. Zip 244.
Fundamentals of Construction GTT – Unit 7 – Green Architecture
Site Plans.
Prof. Williams, MBM, MPM PM 342 Procurement and Contract Management Christian Gonzalez, Project Manager Tamika Roland, Project Coordinator Alex Torres,
King James Construction Cost Estimating Rob Himler, Ken Coutain, David Reger, Ruoyu Huang, Bei Xiong, Hanbing Ye.
IET 120 CONSTRUCTION PROJECT Name: Clarence Hunt.
After studying this unit, you will be able to: Interpret architectural drawings Describe how computers can assist in understanding house plans Organize.
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
MODULE ONE BASIC BLUEPRINT READING PRINCIPLES
Construction Unit 5, Lesson 3 Explanation © 2011 International Technology and Engineering Educators Association, STEM  Center for Teaching and Learning™
By: Brian Toomer ET-494 Senior Design Dr. Cris Koutsougeras Advisor: Mr. Rode’
A group of friends recently took a vacation at one of New York’s Finger Lakes and Shortly After decided to invest in a newly built and furnished home.
Chapter 2 Introduction to Construction Procedures
Chapter 46 Commercial Construction Projects. 2 Links for Chapter 46 Types of Drawings Floor Plans Elevations Site Plans.
AT 201 – Architectural Drafting August 31, 2015 Dr. Dan Trent 1.
Who we are Orrix Homes Jeremy Laviolette Dylan Kugler Board of Directors John Giesbrecht Rick Kugler.
Estimating Project Times and Costs
Chapter 10 Architectural Design. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Distinguish.
Unit 1: Planning and Permitting Mr. Todzia. How does a construction project start? First need someone to initiate……could be the homeowner, a developer.
Grow Your Business 1 st Annual Building Services Outreach Session October 18, 2013.
Energy Conservation Project UNIT 7 STANDARDS: NCES 2.2.2,
Greener Living Contracting By Ryan Brooks. Greener Living Contracting is a private company whose specialty is to increase the efficiency of home and business.
Space Planning Chapter 7 and 16.
Prof Ralph V. Locurcio, PE CON 2001 CVE Sequence Single Family House - 3,000 square feet Duration 1 General Conditions 21 2 Apply for Permits.
Introduction to Plan of a building Instructor Engr Kamran Khan Department of civil engineering City University Peshawar.
Architectural Drafting Mr. Higgins
Property Inspection & Analysis: The Improvements
IET 120 CONSTRUCTION PROJECT Name: Jesse Webb-Greenhill.
Pay attention as I present pay attention as I present slide layout and content slide layout and content pacing pacing references to book (or not) references.
Hillsborough Building & Planning. Green Building 101  Efficiency of buildings and responsible use of water, and construction materials  Reducing building.
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
Estimating and Scheduling CEE 492
Introduction to Building Trades Denver High School.
IET 120 Project #4 Matthew Porter Construction Project.
Fundamentals of Construction
The art and science of designing and construction of buildings.
Construction Planning
Foundations of Technology Construction
Process Economics Factors that affect profitability
Major Steps In Building a SFR
Construction Documents
Costing and Project Evaluation
Chapter 6 Primary residential design Considerations
“THE BOBCAT DEN” Tiny House ARI Grant
Fundamentals of Construction GTT – Unit 7 – Green Architecture
Decisions and considerations of choosing or building a new home.
2911 AW Grimes Blvd., Pflugerville TX 78660
Commercial Construction Projects
How & When to Get Permits for Work in Your Home
10 The Cost Approach—Part I: Reproduction/Replacement Cost
Fundamentals of Construction Gateway – Unit 7 – Green Architecture
Floor Plan A horizontal section view of a structure taken about 4’ from floor level, It shows all exterior and interior walls, doors, windows, patios,
Thermal Impact of Different Interior Finishing Materials on Energy Consumption YOGESH JATAV
Foundations of Technology Construction
Understanding Blueprints
Floor Plans and Symbols
Presentation transcript:

House Construction Budget Plan Kihwan Lee 8/24/2018

Project Definition Objective: Plan: Reference: Prepare a high level budget plan for building a residential house. Plan: Obtain a national average for house construction Calculate house construction estimate from available data and compare to the national average Define required items. Address each items with rough estimates for each. Apply system engineering approach rather than detailed plan for each step. Construct a high level budget for building a house. Reference: Provide reference for each estimates

Budget Comparison on Single-Family Construction National Average Calculated Estimate National Average Estimate Square Footage 2470 Cost/ft2 $117 Carpenter $70/hr Masons Excavator Electrician $85/hr Painters $25~35/hr Plumber $45~65/hr Total Material $147k Total Labor $145k Machine Cost $5200 Total $295k Estimation Cost Note Land $0.0 Assuming the house is built on the currently owned land. Foundation $30k - Building $100k ~ $200k Conservative estimate used between a container house and a manufactured home. Water $21k Sewer Electricity $41k Margin/Hidden cost $50k Unknown and unaccounted for cost. Total $251k ~ $361k

House Construction Contract Process Project delivery method: Design-bid-build Procurement processes: RFP Contractor compensation structure: firm-fixed-price

Architect and General Contractor Provide the services and materials Hire subcontractors Suggest plans and ideas Deliver final cleanup Pull all the permits for work and utility installation Total compensation: $40k Architect Determine scope Draft a list of proposed work, budget, and outline Create the schematic design Finalize drawing and details Serve as the project manager and obtain necessary permit Serve in an advisory capacity Complete construction document and obtain building permit. Administer the construction Total compensation: $30k ~ 50k

Platform frame + Sheathing Roof: Solar panel roof from Tesla Hose Plan Frame-to-Foundation Roofing Wall framing sheathing and bracing Site-Built Home Plan Foundation: Concrete + Insulation Frame: Platform frame + Sheathing Roof: Solar panel roof from Tesla Floor framing and bridging Foundation Details of Foundation

Home Construction Project Item Detailed Breakdown Bath fixtures Foundations, Piers, Flatwork Rough Hardware Built in Appliances Garage Door Unit Heating and Cooling Cabinets Heating and Cooling Systems Windows Carpeting Insulation Wiring Countertops Insurance Kitchen Doors Interior Wall Finish Roofing Excavation Lighting Fixtures Paint Exterior Finish Painting Miscellaneous Exterior Trim Permits and Utilities Final Cleanup Plans and Specs Finish Carpentry Plumbing Fixtures Finish Hardware Plumbing Rough-in and Connection Fireplace and Chimney Roofing, Flashing, Fascia Flooring Rough Carpentry

Requirement Overview Land: use currently owned land Utilities Electricity: city or solar/wind Sewer: city or septic tank Water: city or well Construction Foundation: concrete Main structure: on-site building/manufactured home/container house Interior: kitchen/bathroom/bedroom/living room Electricity/sewer/gas/heater/air-conditioner:

Cost Estimate: Land Residential site Currently owned Charlotte County Address: 14380 Marlin ct, Placida Fl Cost: yearly tax < $1000.00 Total cost: close to or less than $1,000.00

Cost Estimate: Electricity Grid: If the city electric system is located close to the property, the cost is assumed less than $41,000.00 Solar Average house energy usage: 10kW Average solar system installation cost: $4.00 Expected cost: ~$40,000.00 Permit: $1000.00 Total cost: close to or less than $41,00.00

Cost Estimate: Sewer Grid: Septic: If the city septic system is located close to the property, the cost is assumed less than $21,000.00 Septic: Installation: $20,000.00 Permit: $1,000.00 Total cost: close to or less than $21,000.00

Cost Estimate: Water Grid Well If the city water system is located close to the property, the cost is assumed less than $21,000.00 Well Water testing: $500.00 Permit: $500.00 Drilling/pump/pipe/other equipment: $20,000.00 Total cost: $21,000.00

Cost Estimate: Foundation Expected cost for foundation: ~$30,000.00

Foundation Cost Breakdown Cost/ft2 Cost/project ft2 Material Slab $3 ~ $5 Footing $1 ~ $2 Labor $2 ~ $3 Leveling $1000 ~ 2000 Permit $1000 Size 2000 Total $23k National Average $10k ~ 16k

Cost Estimate: Manufactured Home vs. Site Built Home Double-wide Total area around 2,000 ft2 Expected cost ~ $100,000.00, including typical installation cost. Site-built home Expected cost $200,000.00

Cost Estimate: Container Home Main structure Four 10’ x 40’ container as the main building One 10’ x 20’ container as a car garage 4 x $5,000.00 + 1 x $3,000.00 = $23,000.00 Interior/plumbing/electricity $50,000.00 Site installation/preparation $30,000.00 Total cost of ~ $110,000.00

Summary Utility + Foundation cost ~ $103k. Main Building cost ~ $100k ~ $200k. Total cost: $203k ~ 303k + 20 ~ 30% cost uncertainty The total house construction cost becomes approximately $250k ~ 400k Key findings The site preparation cost is a significant portion of the entire project. Container house cost is comparable to the manufactured house cost. The site-built house cost about twice as much as either of the container house and manufactured house.

References Construction Technology, Lecture Notes https://www.fixr.com/costs/concrete-foundation https://www.thehomesdirect.com/blog/average-cost-of-a-manufactured-home https://www.honomobo.com/ https://www.containerhomeplans.org/2015/04/what-i-wish-id-known-before-building-my-shipping-container-home/ https://www.landcentury.com/articles-news/bringing-utilities-to-an-undeveloped-plot-of-land-what-to-expect https://www.manuelbuilders.com/blog/how-much-does-a-set-of-blueprints-cost/ https://news.energysage.com/how-much-does-the-average-solar-panel-installation-cost-in-the-u-s/ https://www.homeadvisor.com/cost/landscape/drill-a-well/ http://www.solarpermitfees.org/SolarPermitLawsSumCA.pdf https://www.homeadvisor.com/cost/foundations/install-a-foundation/ https://www.ebay.com/bhp/40-ft-shipping-containers https://www.universal-containers.com/general-sales/standard-containers https://www.iport.com/containers-for-sale/40ft/