LCLS Linac Injection Line

Slides:



Advertisements
Similar presentations
Mod arithmetic.
Advertisements

1. (x) Ax > ( ∃ x) Bx 2. (x) ~Bx / ( ∃ x) ~Ax CQ of conclusion: ~(x) Ax CQ of line 2: ~ ( ∃ x) Bx 3. ~( ∃ x) Bx 4. ~(x) Ax.
S-44 and USACE Standards Depth Stuff Only. USACE – Single Beam QA CROSS LINE PERFORMANCE TEST: Hard BottomSoft Bottom Max. Allowable Mean Bias
Stream morphology and hydrology. Hydraulic geometry B = aQ b h = cQ f U = kQ m Typical at a station values (midwestern streams) b = 0.25 f = 0.4 m = 0.35.
AEG 07/20071 LCLS Injection Vault Picture Summary J:\ Photos\ LCLS\ Vault\ Img_0091J:\ Photos\ LCLS\ Vault\ Img_0092 Laser Looking DownstreamLaser Looking.
Fig. 3-1, p. 67. Fig. 3-2, p. 67 Fig. 3-3, p. 68.
Jose Chan FAC Review- Injector Laser Heater 6/16/08 1 Injector Laser Heater Undulator Jose Chan.
Section 4-4 Factoring ax 2 + bx + c = 0 a is not 1 Swing & Divide.
Injector Accelerator Readiness Review, 10/31/06 Henrik Loos 1 Beam Losses During LCLS Injector Phase-1 Operation Scope of phase 1 operation Operating modes.
GCSE Additional Science (AQA 4408) Taken by students in 11P2, P3 and P4.
4.4 Solve ax 2 + bx + c = 0 by Factoring. Steps to Follow when: “a” > 1 in the form ax 2 + bx + c Use the factored form: (kx + m) (lx +n) kl must multiply.
Examples of SSA based optimizers: Global Value Numbering.
Factoring Day 1 I can factor a quadratic expression. x 2 + 3x + 2 Rewrite as (x + 1)(x + 2)
Section 5.4 Day 2 Obj: to find the binomial factors of quadratic expressions when a >1.
Warm-up: Factor Completely
Cutting Beam Horns in BC1
Preliminary Electron Transportation Channel Project for EIC Facility (FAIR, Germany) Dmitry Berkaev Budker Institute of Nuclear Physics, Russia, ,
LCLS-II Lattice 26FEB16: updates in the areas from bypass to dump
Tuesday You need: - Calculator - Whiteboard, marker, eraser.
Michael Sullivan and John Seeman SLAC National Accelerator Laboratory
The Finite Universe Method
Quickbooks support phone
Thermal emittance measurement Gun Spectrometer
LCLS Injector: Introduction D. H
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
LCLS Commissioning Parameters
Muon Inverse Rotation and Acceleration
LCLS Commissioning Parameters
Time-Resolved Images of Coherent Synchrotron Radiation Effects
Sector 0 RF System Installation of components (Master Amplifier and PEP Phase Shifter) in October down time. Testing and commissioning during October.
LCLS Injection Vault Picture Summery Laser Looking Downstream
L2 L1 d=L2*sin() ~ L2*(c/L1)    d=L2*sin() ~ L2*(c/L1) Upper
LCLS Injector Commissioning Dates ( )
Stanford Linear Accelerator Center
Section 4-4 Factoring ax2 + bx + c = 0 a is not 1
Base Right X T G C G T TE QB 3 2.
LCLS Commissioning Parameters
LINAC OPS Budget Review
Linac/BC1 Commissioning P
General exam help reading section
Design of an ECHO-seeded FEL at nm wavelength
Injector / Linac Installation Current Status
Factoring Trinomials with Last Term POSITIVE Guess & Check Method
LCLS Commissioning P. Emma, et al
Warm-up: Factor Completely
Injector Experimental Results John Schmerge, SSRL/SLAC April 24, 2002
Linac Physics, Diagnostics, and Commissioning Strategy P
Placement of the LHC BLMIs around TI8 TED (Q9)
Maximum Credible Beam Event Paul Emma et al
02CO, p. 24.
Linac Diagnostics Commissioning Experience
Operational Experience with LCLS RF systems
LCLS Injector Commissioning P
E. Michael Saleski PPS and BCS Systems Manager
Timed Multiple Choice Questions
LCLS Commissioning Parameters
Diagnostics overview Beam profile monitors Cherenkov radiators Summary
LCLS Controls and Conventional Facilities
LCLS Longitudinal Feedback System and Bunch Length Monitor Juhao Wu Stanford Linear Accelerator Center LCLS DOE Review, February 08, 2006 LCLS longitudinal.
Injector/Linac Design Status C. E
Warm-up: Factor Completely
Undulator Alternatives
LINAC System Engineering / Design Status C.E. Rago
Injector Physics C.Limborg-Deprey Feb.8th 2006
Hall probe Location on top or bottom
Q1 a ∆ M = M M2 ∆M = kg kg = kg Q1b E = m L f
7.2 x 10-7 N attraction 2.1 x 10-7 N repulsion A on B / B on A
Warm-up: Factor Completely
Warm-up: Factor Completely
Experience with photoinjector at ATF
Presentation transcript:

LCLS Linac Injection Line WS02-OTR2 Looking From Beam Line WS03-OTR3 Looking From Beam Line J:\Photos\LCLS\Sec20\IMG_0218 J:\Photos\LCLS\Sec20\IMG_0219 AEG 07/2007

LCLS Linac Injection Line QM02 Looking From Beam Line OTR4-QB Looking From Beam Line J:\Photos\LCLS\Sec20\IMG_0220 J:\Photos\LCLS\Sec20\IMG_0221 AEG 07/2007

LCLS Linac Injection Line QM03 Looking Up Stream QM03 Looking Down Stream J:\Photos\LCLS\Sec20\IMG_0222 J:\Photos\LCLS\Sec20\IMG_0223 AEG 07/2007

LCLS Linac Injection Line SDMP Looking From Linac QA11 Looking From Aisle J:\Photos\LCLS\Sec20\IMG_0224 J:\Photos\LCLS\Sec20\IMG_0225 AEG 07/2007

LCLS Linac Injection Line L1X Looking Down Stream LX1 Looking Up Stream J:\Photos\LCLS\Sec20\IMG_0226 J:\Photos\LCLS\Sec20\IMG_0228 AEG 07/2007

LCLS Linac Injection Line QM11 Looking From Linac CQ11 Looking Down Stream J:\Photos\LCLS\Sec20\IMG_0235 J:\Photos\LCLS\Sec20\IMG_0236 AEG 07/2007

LCLS Linac Injection Line BX12-OTR11 Looking From Linac CQ12 Looking Down Stream J:\Photos\LCLS\Sec20\IMG_0237 J:\Photos\LCLS\Sec20\IMG_0239 AEG 07/2007

LCLS Linac Injection Line CQ12 Looking Down Stream QM12-QM13 looking From Aisle J:\Photos\LCLS\Sec20\IMG_0240 J:\Photos\LCLS\Sec20\IMG_0241 AEG 07/2007

LCLS Linac Injection Line WS 11-12 Looking From Aisle OTR 12 Looking From Aisle J:\Photos\LCLS\Sec20\IMG_0242 J:\Photos\LCLS\Sec20\IMG_0243 AEG 07/2007