Daily Drilling Report Phase 2

Slides:



Advertisements
Similar presentations
In collaboration with Building XML for Daily Drilling Report Arnt Vegard Espeland October 2006.
Advertisements

Payer User Group Webinar – 7/31/2014. Agenda Welcome (5 minutes) ◦Opening Comments/ Review ◦Meeting Goals Chapter 243 Changes (25 minutes) ◦Clarification.
© 2012 IBM Corporation Rational Insight | Back to Basis Series Documents and Record Control Liu Xue Ning.
A Step by Step Guide How to add your own pages to the website.
0 eCPIC Admin Training: OMB Submission Packages and Annual Submissions These training materials are owned by the Federal Government. They can be used or.
DDR version 1.2 Project meeting - Web Lillian Hella POSC Caesar Association (PCA)
WITSML Technical Team Update Houston May Technical Team Responsible for technical content of WITSML standard XML Schemas XML Schemas Application.
Water Framework Directive Report of Activity 1 OR Progress with WFD 2005 schemas.
Student Financial Assistance. Session 25-2 Session 25 Review of Institutional Student Information Record (ISIR) and EDE Technical Reference Changes.
XML blocks XML STRUCTURE The most basic building blocks of an XML file are elements, attributes and comments. Compiled based on Tutorial PhUSE 2008 XML.
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
Pål Rylandsholm 16 June 2009 DRAFT DDR Phase 2 Status EPIM RUF meeting June 16th 2009.
Text2PTO: Modernizing Patent Application Filing A Proposal for Submitting Text Applications to the USPTO.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI GLUE 2: Deployment and Validation Stephen Burke egi.eu EGI OMB March 26 th.
LEARNING AGREEMENT. This is the result of the agreement between the outgoing student and his/her academic tutor at the University of Murcia on the subjects.
Daglig borerapport Project meeting March
M-PEDD Technical Working Group
Train-the-Trainer: Recruiter Module
Project Management Chapter 3.
CTI STIX SC Monthly Meeting
Input to project from IIP
Please review these important Webinar Etiquette guidelines
AIXM – Work in Progress AIXM CCB – Webex, 24 JAN 2014.
Software Configuration Management
Prepared by Rand E Winters, Jr. ASR Senior Auditor October 2014
Implementation Strategy July 2002
Accelerate define.xml using defineReady - Saravanan June 17, 2015.
POC Procedures Working Group (POC-PWG) Work package 3 (As Built)
DDR version 1.2 Project meeting - Web
Illinois School Code and Administrative Rules
Informational PDF #5 How to Prepare Your Precoding File and Upload it into the Portal System.
For info only! Expected date of reporting of RBMP as reported informally by SCG Legal deadline 22/03/ MS by deadline 1 MS partly by deadline (BE)
Roles and Responsibilities (1/3)
Results-Driven Priorities Application Training
ETS Submission Process for New Project Applications
Project Plan Template (Help text appears in cursive on slides and in the notes field)
New MyFD JV Feature Demo Webcast August 1, 2018
Technical update 05 of April 2017
Project Meeting June 17th Pål Rylandsholm, DNV
PROJECT CHANGES IN EMS Implementation Seminar.
Daily Drilling Report Phase 2
Meeting of Working Group Data & Information Sharing (DIS)
Information session SCIENTIFIC & TECHNICAL NEGOTIATIONS Call FP7-ENV-2013-WATER-INNO-DEMO "Environment (including climate change)" Brussels 24/06/2013.
Common Origination and Disbursement (COD) System Update
Recommendations for using this ‘framework’ template
Welcome.
Review plan of the nature reporting – update 7
S-127 – Marine Traffic Management Release Candidate NIPWG 6 30 January 2019 Raphael Malyankar Eivind Mong Sponsored by IHO.
Questionnaire on progress in preparing reports under Nature Directives
WP 4 - Revision of Natura 2000 dataflow
Assessment Needs Analysis
Education and Training Statistics Working Group – 2-3 June 2016
LAMAS Working Group 29 June-1 July 2016
Harmonisation Working Group
EPIM RUF meeting June 16th 2009
TAG Agenda – April 6th 2006 Minutes from last TAG meeting – 13.45
Ctclink executive leadership committee May 31, 2018
LTS Implementation of SAICA 2016 Training Programme
Review plan of the nature reporting – update 6
Web-based Imaging Management System Working Group - WIMS
Reportnet 3.0 Database Feasibility Study – Approach
<Your Team # > Your Team Name Here
Getting Ready for IPMA Level D® Certification in the USA
(Project) SIGN OFF PROCESS MONTH DAY, YEAR
Supplier Webinar: IBM PCD Data Collection Process Changes & New Version of IBM’s Product Content Declaration(PCD) Form February 21 and 26, 2019 This.
draft-ietf-dtn-bpsec-06
Canada Gazette Directorate
Therapy Guide July 2019.
WISE Working Group D September 2009, Brussels Jon Maidens.
Presentation transcript:

Daily Drilling Report Phase 2 Project meeting June 4th 2009 Pål Rylandsholm

Agenda Approval of agenda Approval of minutes from last meeting Decisions and actions from last meeting Project overview and overall status Presentation of new XML schema and standard report layout Approval of XML schema LicenseWeb implementation, status and plan Date for cut off to new reporting formats both to PSA and partners (via LicenseWeb) Way forward Conclusions and actions AOB Lunch (11:30) © Det Norske Veritas AS. All rights reserved 16 February 2019

Decisions from last meeting The project recommends June 15th as the cut of date for use of the new XML schema as basis for reports to PSA and License partners. (NB: This has been overruled – new date to be set today) Decision 02-09: The report layout is approved by the project group after the following corrections Lithology Information: "Description" should be renamed "Shows description“ "Well Control Incident" - "description" to be added in table cell below data row. Decision 03-09: The solution in LicenseWeb will be based on operators submitting complete reports when updates or corrections occur. © Det Norske Veritas AS. All rights reserved 16 February 2019

Actions from last meeting 18/12/2008 - 3: Discuss with OLF and EPIM how to handle the replacement of the old partner report with the new one in the licenses. Responsible: Ove Ryland, EPIM Status: On agenda (Way forward) Action 01-09: Check out the compatibility of the PSA/NPD system for receiving, validating and storing daily drilling reports with decision 03-09. Responsible: Jonas Stokka, PSA. Status: Do not want updates on a daily basis, updates received via final report. When necessary “created date” will be criteria for selection of valid data. Action 02-09: Provide an updated plan for the Licenseweb implementation, with completion as soon as possible, and in due time before June 15th Responsible: Alfred Johnsen, Tieto. Status: On agenda © Det Norske Veritas AS. All rights reserved 16 February 2019

Status As of March 24th EPIM officially owns the DDR XML schema Partner reporting in License web Same information content as submitted to PSA Status: Specification document completed Build - in progress Updates to XML schema – documented in separate document WITSML 1.4.0 compliance Correction of misspelling of enumerated values Correct use of wrong data types (For example on comments which are limited to 256 characters) Some elements may be changed from ‘optional’ to ‘mandatory’ in the report. SAWSDL annotation Coordination with Energistics Tested and completed – ready for approval by project group © Det Norske Veritas AS. All rights reserved 16 February 2019

Status Standard report layout for PDF reports User guide updates - PSA Completed – approved by project group in meeting February 9th 2009 User guide updates - PSA Draft version available at (http://www.ptil.no/getfile.php/PDF/DDRS%20-%20borerapportering/WITSML_drillReport_profiled_schema_for_usermanual.xml) Schema validation error messages - PSA Business rule validation error messages will be updated by cut of to new formats © Det Norske Veritas AS. All rights reserved 16 February 2019

DDR to regulators and license partners - Scope and deliverables of DDR phase 2 PCA RDS Operators Regulators NPD/PSA Fact database DDR XSD Daily Drilling reports XML Drilling App/DB PSA/NPD app Drilling data Daily Drilling reports XML License Partners LicenseWeb pdf Deliverable in progress Daily Drilling reports XML Drilling App/DB Completed deliverable Schema/Business validation © Det Norske Veritas AS. All rights reserved 16 February 2019

Way forward Completion of DDR partner reporting in LW – Responsible Tieto, follow up by LW User forum Communication to EPIM members regarding new DDR formats and date for go live of DDR reporting in Licenseweb – responsible EPIM Report User Forum – Drilling Communicate to operators regarding cut of date for new formats to PSA – Responsible PSA Project documentation will be added to EPIM’s document repository October 1st is the date when PSA will require DDR according to the new formats, and the new DDR partner reporting solution in Licenseweb will be ready for use! Further improvements and extensions of the DDR XML schema will be handled by EPIM RUF – Drilling A possible first case can be increased information scope in DDR. See Next slide © Det Norske Veritas AS. All rights reserved 16 February 2019

Additional information requirements – NB not included project scope Identified during DDR Phase 1 Operation codes Cement Period of operation “Drilling like units of measure” Formation name – selection list Datum (reference points) Casing type Pressurized coring Well stimulation (At well testing) indicator Perforation - Shot density RIGTYPE Bit data Side track Tight wells Identified during DDR Phase 2 Cost Report nr -> A sequence number. Each day of operation is a new number increment Start date -> Start of reporting/operation Water depth Bit record (additional info): grading, depth in, depth out, drill lenght (m), duration (hr), rop (m/hr) Casing (new section): OD (in),top, bottom, weight, grade, estimated top of cement "Duration" should be included for all time intervals. © Det Norske Veritas AS. All rights reserved 16 February 2019

© Det Norske Veritas AS. All rights reserved 16 February 2019