TAB Data Center Renovation Project Planning for Transition of Summer 2013 February 21, 2013 TAB Atrium.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

City of Kalamazoo Early Retirement Incentive (ERI) 2011.
Slide 1 Insert your own content. Slide 2 Insert your own content.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Deploying IPv6: The time is now Are you ready? SFTA 24 May 2012 John Curran President and CEO, ARIN.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
0 - 0.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt ShapesPatterns Counting Number.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Teacher Name Class / Subject Date A:B: Write an answer here #1 Write your question Here C:D: Write an answer here.
Addition Facts
Year 6 mental test 10 second questions
1 Chapter 12 File Management Patricia Roy Manatee Community College, Venice, FL ©2008, Prentice Hall Operating Systems: Internals and Design Principles,
Reforms to the Civil Service Pension Scheme (Presentation updated January 2013)
Peer Review and Development Groups Support for Excellence Programme - Huddle.
ZMQS ZMQS
Bond Construction Update Citizens Oversight Committee Long Beach Community College District July 21, 2008 BUILDING TOMORROW TODAY 1.
Woodbridge High School Woodbridge School District Design Development for Woodbridge High School 22 May 2012.
Wendover Renovation Presentation Presentation Overview Renovation Stages Before Now After How you will be affected Questions/Concerns.
Year 6/7 mental test 5 second questions
Richmond House, Liverpool (1) 26 th January 2004.
Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
District heating year District heating and cooling 2013 Heat sales (incl. taxes)2 330 mill. Sold heat energy31,6 TWh Average price of.
Rezoning Study -Community Forum- Thompson Middle School February 15, :30 – 7:30pm.
LS1 & Buildings 115, 507 and 601. Building 601 Building 601 (kitchen & entrance): Power has been cut and disconnected (Patrick Gallay EL) All items removed.
Service Providers Last Update Copyright Kenneth M. Chipps Ph.D. 1.
1. Green Lights Program Objectives Improve Quality of Synchronization in a Short Timeframe Noticeable Improvements to Motorists Appropriate Allocation.
Network TV Scatter vs. Spot TV Cost Comparison A25-54 CPMs Q Q TVB Analysis of SQAD National and Local Market Cost Estimate Data 1 Updated.
Student Lab Management IT Services March Our Purpose this evening … o Foster good communication o Improve Relationships and Collaboration o Prepare.
2 |SharePoint Saturday New York City
VOORBLAD.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Take from Ten First Subtraction Strategy -9 Click on a number below to go directly to that type of subtraction problems
BIOLOGY AUGUST 2013 OPENING ASSIGNMENTS. AUGUST 7, 2013  Question goes here!
© 2012 National Heart Foundation of Australia. Slide 2.
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
Employment Ontario Program Updates EO Leadership Summit – May 13, 2013 Barb Simmons, MTCU.
Before Between After.
U.S. Ethanol & Biodiesel Market Situation WILL Radio Energy Market Update May 27, 2014 Daniel O’Brien, Ph.D. Extension Agricultural Economist Kansas State.
Addition 1’s to 20.
25 seconds left…...
Allocation of capacities between Portugal and Spain Madrid 30 th April 2013.
Agenda – Schools Forum May School Reform – what is happening and what does that mean for Leicestershire? Questions The Leicestershire Consultation.
Reforms to the Civil Service Pension Scheme March 2012.
Test B, 100 Subtraction Facts
11 = This is the fact family. You say: 8+3=11 and 3+8=11
Prof.ir. Klaas H.J. Robers, January 16, 2013 Supervising a graduating student 1.
Week 1.
1 DELIA MEMORIAL SCHOOL (BROADWAY) New Senior Secondary (NSS) Curriculum
We will resume in: 25 Minutes.
Design Review Planning to date Project scope summary
PLANS FOR ) EVALUATE 2013 – 14 2) WHERE CAN WE IMPROVE 3) CHANGES TO COMPETITION STRUCTURE & 2014 – 15 PROGRAM 4) SQUAD RESTRUCTURE 5) HOUSEKEEPING.
Planned FCC Power Outage July 11, ARRA Feynman ARRA construction project requires completion by September 30 th. This constraint.
1 Unit 1 Kinematics Chapter 1 Day
Weekly Attendance by Class w/e 6 th September 2013.
Green Impact Workshop Queen’s Approach to Carbon Management.
Outsourcing the Data Center Ingvi Stígsson. Why new Data Center? ● Old Data Center not secure enough o Wooden ceiling o Has water pipes ● Too long wait.
New Data Center at BNL– Status Update HEPIX – CERN May 6, 2008 Tony Chan - BNL.
University Information Technology 1 TAB Data Center Renovation Update 11/08/12.
Xoserve IX Refresh Customer Update 12/02/2019.
Presentation transcript:

TAB Data Center Renovation Project Planning for Transition of Summer 2013 February 21, 2013 TAB Atrium

Thank you for your help so far… We have begun Phase 1 of our construction Moving a 30-ton cooling capacity roof top unit on Saturday, February 16 2

Then Now 3

Where were we before this journey began? Physical Servers: 409 Virtual Servers: 93 All old architecture going to Quad switches Prior to fiber optic New Architecture and TSSDC as additional Data Center Data from May 2011 Does not include HPC or Storage

We made progress along the way… Physical Servers: 291 Virtual Servers: 288 (combined TAB/TSS) New Architecture in place Old Architecture still exists for many things Data from May 2012 Does not include HPC or Storage

Where are we now in TABDC? Physical Items: in New Architecture 155 in Old Architecture Of those, 80 are slated for retirement or virtualization Virtual Servers: 285 (plus 185 in TSSDC) 239 in New Architecture 46 in Old Architecture* Data from January 2013 Does not include HPC or Storage

What does that look like graphically? 7

Physical layout of TAB Data Center 8

Proposal you saw last June 9

Actual plans based on modifications Phase 1 Phase 2 10

Construction Timeline Roof, electrical, floor work all underway now on Left Side Current Stage = Demolition Construction crews on hand next several Saturdays to minimize disruptions during normal working hours Communications to inhabitants of TAB on a bi- weekly basis with look ahead for major milestones 11

IT Timeline Current construction timeline is 4 weeks to move everything from Right side to Left side once we are delivered a completed Phase 1. Target late June. 4-6 weeks prior, we hope to have shared access to install cabinets and cabling, burn in new equipment (May 1-June 15). Split redundant network during this time* Target date for Retirements and Re-IP = April 30 –Months of May and June are filled with obstacles due to Academic calendar 12

Targets for end of Phase 1 210items to move: Servers, Storage, Network, HPC, Mainframe First pass discussion, Technology Services identified: –52 items that could be retired outright –28 items that could be virtualized –55 items that are already New Architecture and can move easily –10 items for Storage (actual size 6+ cabinets) Leaves 68 items that need to be Re-IPed intoNew Architecture 13

Why? All equipment is being re-racked into new standardized racks. –Minimizing number of items to move or addressing beforehand means we can meet our 4-week window. Knowing what is going where allows us to plan our equipment purchases for networking and allocate power efficiently. 14

15

Not Shown: HPC, Mainframe w/Storage, Tape Backup (~7 cabinets) Items currently in TABDC slated for retirement/virtualization 16

Thank you for your help so far… …interesting times still ahead! 17