2008 Quebecor CDS Protocol Auction Timeline

Slides:



Advertisements
Similar presentations
April 12, SLIDE 1 Copyright © 2011 International Swaps and Derivatives Association, Inc. FpML Reporting WG FpML Representation for Public Price.
Advertisements

April SLIDE 1 Copyright © 2011 International Swaps and Derivatives Association, Inc. FpML Reporting WG FpML Representation for Public Price Transparency.
Dermal Filler CD Summary K-T Training.  The CD consists of 5 files-Refer to the flow chart for information included in the individual files. Dermal Filler.
ISDA ® The New CDS Landscape Auction Settlement International Swaps and Derivatives Association, Inc. ISDA ® Copyright © 2009 International Swaps and Derivatives.
Pricing Understanding and Capturing Customer Value
Copyright © 2007 Pearson Education, Inc. Publishing as Pearson Addison-Wesley Slide 1- 1.
Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 9-1 International Business Environments & Operations 14e Daniels ● Radebaugh ● Sullivan.
Trading rules in Lithuania Giedrius Radvila Lietuvos energija AB 3 July 2006, Riga II MINI-FORA.
Asia Pacific Financial Forum July 7, 2014 Seattle Asia Pacific Financial Forum Session 2: Forging Deep, Liquid and Integrated Capital Markets Keith Noyes.
Copyright © 2007 Pearson Education, Inc. Publishing as Pearson Addison-Wesley Chapter 5 Part 1 Conditionals and Loops.
Forest River, Inc – Dealer Central. Available Dealer Options.
International Swaps and Derivatives Association, Inc. International Swaps and Derivatives Association, Inc. Understanding the 1992 ISDA Master Agreements.
Diane Genova Managing Director and Associate General Counsel August 6, 2002 Overview of the Architecture of the 1992 ISDA Master Agreements International.
Public Procurement Procedure – Bidding Documents
11-1 Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall Chapter 11 Marketing Processes and Consumer Behavior.
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
ISDA ® 2009 ISDA CREDIT DERIVATIVES DETERMINATIONS COMMITTEES AND AUCTION SETTLEMENT CDS PROTOCOL International Swaps and Derivatives Association, Inc.
Creating Electronic Forms in Word Creating Forms in Word 2003 What is an electronic form? What is an electronic form?
CRR Auction Scope John Moseley. To outline aspects of the CRR market process to assure that these proposed CRR market protocols (as interpreted by ERCOT.
Copyright © 2011 Pearson Education, Inc. Publishing as Pearson Addison-Wesley. Chapter 4 Applications of the Derivative.
Demand Integration Update to DSWG ERCOT Emergency Responsive Service (ERS) Report to the Public Utility Commission of Texas for the 2013 ERS Program Year.
Nodal Program Update and SEWG Update COPS 1/11/2011 Jim Galvin.
Farnborough Airspace Change Proposal Briefing to FACC 26 th November 2014 TAG Farnborough Airport.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Commercial Systems Market Data Transparency Business Requirements.
Assessment Findings Validation Title of the Project (date)
Carrie Tucker Supervisor, Day-Ahead Market DAM data supporting MCWG/CWG credit parameters discussion February 29, 2012.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Settlement Invoices Business Requirements Settlements and.
Alabama Housing Finance Authority’s 2016 Market Study Requirements for Multifamily Housing Overview Reference Documents: HOME Action Plan and Housing Credit.
ERCOT Market Credit Working Group Presentation to the Finance and Audit Committee Payment Short Pay/Default and Uplift for Congestion Revenue rights (CRRs)
E-Procurement. Click on eProcure Fill the User Id, Password and Click Login.
XML Exchange – the future of moving data. Purpose… Moving product data to Retail portal. Moving product data from one WERCS database to another Moving.
Copyright © 2011 Pearson Education, Inc. Publishing as Longman.
Chapter Fourteen Building a Marketing Plan. Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall14-2 Building a Marketing Plan Creativity.
External Interface Update 1 External Interface Update April 2, 2007 Daryl Shing.
UNITED IN SERVICE TO OUR NATION UNCLASSIFIED Filter Tasks and Requirements.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs Process Settlement and Data Aggregation Working.
Managing Auction Listings on the MLS James Harrison, RCE, CAE President and Chief Executive Officer MLSListings Inc.
1 Settlement Dispute Validation Commercial Operations Subcommittee January 27, 2005 Presented by ERCOT Wholesale Client Services.
Transition Plan Network Operations Model Change Requests 5/26/2010.
1 Credit Parameters Review TAC July 2, Protocol Section , “Credit Requirement for DAM Bids and Offers” specifies: Credit Requirement for.
March, SLIDE 1 Copyright © 2011 International Swaps and Derivatives Association, Inc. FpML Reporting WG FpML Representation for Public Price Transparency.
Copyright © 2009 Pearson Education, Inc. publishing as Prentice Hall 9-1 Part Four World Financial Environment Chapter Nine Global Foreign Exchange And.
May 3, 2016 Presented by: Jamila Piracci, Vice President, OTC Derivatives Alessandra Riccardi, Director of Capital and Risk NFA Webinar: Margin Model Approval.
Lead from the front Texas Nodal 1 Texas Nodal EDS4 - Approach 11/28/2007.
Use of ONTEST Resource Status over Telemetry: – ERCOT protocol permits the use of telemetered Resource Status code “ONTEST” during periods of start-up.
ASH BUS 435 Week 2 Business Concept Check this A+ tutorial guideline at business-concept Prepare.
Market Trials Open Market Participant Call
Click ’n’ Transact EnronOnline
Data analysis using Information Collecting and Processing System «IIAS» Aiga Lipenberga Head of Data Provision Division, Electronic Communications and.
Reports on Audited Financial Statements
EU Tariffs Code Update Based on Refined Draft as of 30th October
Mod_06_12 Improved Efficiencies in LCF Process 31 January 2012
Warranty Claims.
Five-Minute Settlement Program: Executive Forum 1
The Incremental Proposal
Copyright © 2011 Pearson Education, Inc
Analyzing Business Markets
Part B Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt
Analyzing Business Markets
Definition Order Cancellations
Dual Auction Timeline Subordinate Auction Senior Auction
Modification Proposal 0474: Inclusion of the guidelines relating to the “Customer Settlement Error Claims Process” within UNC governance.
Meter Data Publication Timing
The WTO-Agreement on Import Licensing
Auctions 101 March 2019.
Freeze auction.
Update on Market Trials
Manage Sourcing - Supplier
Copyright © 2011 Pearson Education, Inc
Market Test the Offer.
Presentation transcript:

2008 Quebecor CDS Protocol Auction Timeline Initial Bidding Period Subsequent Bidding Period SUBMIT Valid Inside Market Submission Dealer Physical Settlement Req Customer Physical Settlement Req SUBMIT Limit Bids / Limit Offers (Dealer & Customer) Final Price etc. PUBLISHED Open Interest, Inside Market Midpoint, Adjustment Amount, Limit Offer Cap (if applicable) PUBLISHED 9.45 10.00 10.30 11.00 12.00 12.45 1.00 2.00 This timeline is a summary of certain settlement procedures set forth in the 2008 Quebecor CDS Protocol (the “Protocol"), as published by The International Swaps and Derivatives Association, Inc. on January 30, 2008, and is provided for information purposes only. It does not summarize all provisions set forth in the Protocol. The user must refer to the Protocol document itself for the specific details concerning the auction timeline and other elements of the Protocol. Copyright © 2008 by The International Swaps and Derivatives Association, Inc.