International Hydrographic Organization

Slides:



Advertisements
Similar presentations
Regional Workshop Warsaw, January 2006 STATE UNION OF SERBIA AND MONTENEGRO Basel Protocol on Liability and Compensation Questionnaire No. 2 Ratification.
Advertisements

Geomatica 2007 Workshop on Marine/Hydrographic Spatial Data InfrastructureWorkshop on Marine/Hydrographic Spatial Data Infrastructure The IHO Responding.
IHB Report on IRCC-2HSSC-2. IRCC-2 Establish, coordinate and enhance cooperation in hydrographic activities amongst States on a regional basis, and between.
International Hydrographic Organization CAPACITY BUILDING (Brief) CB Strategy CB Management Further Developments.
Release & Deployment ITIL Version 3
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 5 Project Integration Management.
IRCC June 2015 (Mexico City, Mexico) Report of the Capacity Buildung Sub-Committee Thomas Dehling CBSC Chair.
SEVENTH MEETING OF THE IHO INTER-REGIONAL COORDINATION COMMITTEE INTER-REGIONAL COORDINATION COMMITTEE (IRCC7) ANNUAL REPORT 2014.
MACHC16, December 2015 Hydrographic Service Leendert Dorst Structured MACHC reporting to IRCC and IHB over 2015.
Hydrographic Services and Standards Committee 7th MEETING OF THE IHO HYDROGRAPHIC SERVICES AND STANDARDS COMMITTEE (HSSC) Busan, Republic of Korea,
Public health, innovation and intellectual property 1 |1 | The Global Strategy on Public Health, Innovation and Intellectual Property Technical Briefing.
Nordic Institute of Navigation E-Navigation Conference IHO and e-Nav Robert WARD Director, International Hydrographic Organization.
CBSC-14 IHB Report Mustafa IPTES Director, IHO. Ratification of Protocol of Amendments on IHO Convention *47 of 48 approvals received. * Next IHC will.
Project Management PTM721S
United Nations Statistics Division
UNEP/Global Mechanism support for UNCCD reporting
Draft Regional Strategy on Safety of Navigation in the Pacific
9TH MEETING OF THE IHO INTER-REGIONAL COORDINATION COMMITTEE
Capacity Building Sub Committee Meeting Report for MACHC
Report of the Capacity Buildung Sub-Committee
NCWG Terms of Reference NCWG April 2016, IHB, Monaco
9th MEETING OF THE IHO INTER-REGIONAL COORDINATION COMMITTEE
Update on Capacity Building Management System
9/16/2018 The ACT Government’s commitment to Performance and Accountability – the role of Evaluation Presentation to the Canberra Evaluation Forum Thursday,
CBSC16 Goa, India, 30 May - 1 June 2018 IHO Secretariat Report
Entry into force of the Amendments to the IHO Convention and its supporting Basic Documents
Standards” and by the Council key Priorities
By EAHC COORDINATOR Peter You
The IALA World-Wide Academy
Proposed IHO Work Programme for 2018
Update on the IHO CBSC 15 Peter YOU EAHC CB Coordinator
IRCC work is guided by the IHO Work Programme 3
REPORT AND PROPOSALS FROM IRCC Reference Doc: C2-4.2A
CBSC-16 Towards a new implementation of the CB strategy in the EAtHC region and a strengthened involvement of the IHO GOA, India, 30 May – 1 June 2018.
South West Pacific Hydrographic Commission (SWPHC)
Inter-Regional Coordination Committee
8TH MEETING OF THE IHO INTER-REGIONAL COORDINATION COMMITTEE
Add Commission and date Sept 17, 2018
Hak Yoel (Peter) YOU Republic of Korea
Updates and Proposals from the HSSC
MACHC CAPACITY BUILDING COMMITTEE MEETING REPORT
IRCC 10 Outcomes Complete IRCC report available on the IHO website
MBSHC-19 Batumi/GEORGIA 30 June-02 July 2015 BASWG Report 1.
International Hydrographic Organization (IHO)
EAtHC Seminar Lagos, Nigeria, October 2018 Capacity Building
CBSC 16 Chairman Report Goa, India, 29 May – 1 June 2018
Agenda Item 5.2 Reference Document C2-5.2
NCWG Input to the IHO Strategic Plan and IHO 3 Year Work Plan
High level seminar on the implementation of the
International Hydrographic Organization (IHO)
Satellite derived bathymetry (SDB) – Risk assessment
Operation of the Organization under IHO Convention and its supporting Basic Documents
Report on 9th TRDC-BOD Meeting
East Asia Hydrographic Commission (EAHC) Three Year Work Plan
What is Capacity Building?
EAtHC Awareness Seminar
United Nations Statistics Division
CBSC15 Paramaribo, Suriname, 7-9 June 2017 IHO Secretariat Report
CBSC17 Genoa, Italy, May 2019 IHO Secretariat Report
CBSC 17 Chairman Report Genoa, Italy, 29 May – 31 May 2019
Eastern Atlantic Hydrographic Commission (EAtHC)
Status Report of the SPRWG of the Council
WENDWG – WENSWG Progress Report
Southern African & Islands Hydrographic Commission (SAIHC) Report
NDPHS Work Plan for 2012 NDPHS 8th Partnership Annual Conference
BALTIC SEA HYDROGRAPHIC COMMISSION (BSHC)
Role of Evaluation coordination group and Capacity Building Projects in Lithuania Vilija Šemetienė Head of Economic Analysis and Evaluation Division.
Aim of presentation CBSC was tasked to propose to the Council via IRCC to provide information on the minimum resources needed to support a sustainable.
Report and Proposal from IRCC
2nd Session of the IHO Assembly C A
Presentation transcript:

International Hydrographic Organization CBSC 15 Chairman Report by Thomas Dehling Chairman CBSC 1

Contents Strategy Assembly 1 CB Funds Work of the IHO Secretariat CB Management Contribution to CB Joint CB Developments and Improvements

Strategy Revised CB Strategy very efficient and regulations very helpful in the progress of our CB work Living document, review it regularly. take a closer look at e-learning part. In my view adjust Strategy or its interpretation internally before initiating an adoption procedure via Council/Assembly.

Assembly 1 Capacity Building played its role as one the strategic topics of the IHO. Positive decisions have been made such as the increase of the annual regular contribution from the IHO budget to the CB fund. This improves the planning and execution of the projects significantly. development of the e-learning component. Indication of having additional personal at the IHO Secretariat for the CB Management. Change from 5-year to 3-year planning cycle

CB Funds (1) To deal with the deficit stick strictly to strategy and regulatio waiting list comparable to this year consider to have enough funds left for the following year Strive to increase the CB funds Prioritize the projects submitted Some chances now at hand to multiply our direct investments

CB Funds (2) Not the dramatic lack of funds we had in 2015 at the time of the CBSC meeting. Situation improved significantly over the year, but it showed the need of an early confirmation of the available funds. This situation has changed for 2017 and will improve further due to the now regular contribution from the IHO budget. Without the earmarked projects we will have at this stage 256.000 € available for 2018.

Work of the IHO Secretariat With the growing success of CB, the administrative work is growing likewise. The support from the IHB staff is essential to cope with that. I am explicitly thankful for the fundamental support from Alberto Costa Neves and for the very good contribution in the financial execution accomplished by Sandrine Brunel.

CB Management (1) In 2016 the execution of the CB WP went very smoothly for the first time. This has several factors. The good preparation by almost all of the CB coordinators and the RHCs, correct and timely provision of the documents and the good support from the IHO Secretariat.

CB Management (2) CB Coordinators play an extraordinary important role in the success of CB efforts in the IHO and I again urge all Regional Hydrographic Commissions not to change this position too often. RHC´s with a frequently rotating CB Coordinator have less chances to receive adequate support because of the lack of experience.

Contribution from ROK and Japan The extraordinary generous ongoing contribution from Japan and ROK have been one major factor in the success of CB. I am very confident to sustain the fruitful cooperation with both countries.

Joint CB Planned joint CB meeting of IHO, IMO, IOC, WMO, IALA, FIG and IAEA at the IMO in London was cancelled by the IMO Disadvantageous that IMO TCP withdrew from a cooperation with the IHO in CB. A success of comprehensive projects will depend on a good cooperation. The next meeting is scheduled to be held in November at the IALA Headquarters.

Developments and Improvement (1) Current scheme works with the funds available. Developments to reduce administrative workload and procedural to be solved. Technical visits: Still not all reports are timely and adequate. Finalize raft procedure 9 on TVs. Strategic level: look at issues already laid down in the CB Strategy.

Developments and Improvement (2) Acquisition of comprehensive projects:idea of getting support on a governmental level in consultancy. Second stakeholder seminar planned in 2019. And finally, how can we include and extend contributions from developed MS to Capacity Building.

PHASES OF DEVELOPMENT OF HYDROGRAPHIC SURVEYING AND NAUTICAL CHARTING CAPABILITY Phase 1 (MSI) Collection and circulation of nautical information, necessary to maintain existing charts and publications up to date Phase 2 (Surveying) Creation of a surveying capability to conduct: Coastal projects Offshore projects Phase 3 (Charting) Produce paper charts, ENC and publications independently

Fund limitation CB funds: estimated availability for 2016 and 2017 NF ROK ROK IHO IHO IHO