Work Breakdown Structure

Slides:



Advertisements
Similar presentations
Chapter 17: The binomial model of probability Part 2
Advertisements

NEES Project Management Workshop June 16 June 18 1 Segment 3.
Chpter#5 -part#1 Project Scope and Human Resource Planning
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
CSSE September.2008 Work Breakdown Structure Chapter 4.
Projmgmt-1/17 DePaul University Project Management I - Work Breakdown Structure Instructor: David A. Lash.
Inspiring Your Next Success! ® Company Confidential - Copyright 2008 Hitachi Consulting 1 Work Plan Development Or answering the question: “So... what.
Project Time Management
Chapter 5: Project Scope Management
PROJECT SCOPE, SCHEDULE, AND RESOURCE MANAGEMENT
P-value method dependent samples. A group of friends wants to compare two energy drinks. They agree to meet on consecutive Saturdays to run a mile. One.
Topic 2- 1ICT 327 Management of IT Projects Semester 1, 2005 Topic 2 Project Planning & Initiation Schwalbe: Chapter 3 Compiled by Diana Adorno and contributions.
WEEK 3 Introduction to Project Management. Agenda Review – Any questions from last week Phase 2: Planning ◦ Project Plans & Deliverables.
Information Technology Project Management
Define plancontrol BudgetQuality Time BUS 4017 HR. Welcome to: Project Management Week 4. Professor Fred Pentney.
Welcome to Session 4 – Project Management Process Overview (continued) Instructor:Phyllis Sweeney Instructor: Phyllis Sweeney Project Management Certificate.
Work Breakdown Structure (WBS) Development
WARM UP — Review What have you learned so far about the writing process? Make a list of general steps to writing an essay.
Geog 469 GIS Workshop Project Management.
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 4 Project Scope Management.
Work Breakdown Structure Kathy S. Schwaig. What is a Work Breakdown Structure (WBS)? A WBS is a logical hierarchy of work packages involved in a project.
Work Breakdown Structure Use and Demo
PLANNING ENGINEERING AND PROJECT MANAGEMENT
PRJ566 Project Planning & Management Work Breakdown Structure.
PRJ566 Project Planning and Management Work Breakdown Structure 1.
Meeting Management/Planning. Today Go over basics of meeting management Introduce key elements of creating a plan.
Define plancontrol BudgetQuality Time BUS 1040 Welcome to: Project Management Week 4. Professor Fred Pentney Team slogan ? Give me a “B”?
Time Management Eric W. Ford, PhD 1/22/02. Plan a schedule of balanced activities.  College life has many aspects that are very important to success.
WBS Work Breakdown Structure © Unitec New Zealand.
Basic Project Management Process Basic Project Management Process Larry Creel July 11, 2003.
Creating a Work Breakdown Structure with Microsoft Project.
Prof. Shrikant M. Harle.  Scheduling is a process which tries to organize activities in logical sequence.  While it is not possible to know with certainty.
© 2008 Prentice Hall6-1 Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and.
A Brief intro to Project Management What can it do for you
Mr. Joshua Mario Project Management
An informal, team oriented, OO design system
Rob Gleasure IS3320 Developing and Using Management Information Systems Lecture 15: Data-Flow Diagrams 2 – Level.
Project Management Systems
Plan Schedule Management
Work Breakdown Structure
Concepts and Definitions Work Breakdown Structures
Work Breakdown Structure and Activity List Workshops
Project Management and Information Security
Chapter 5: Project Scope Management
Information Technology Project Management – Fifth Edition
AS Computer Studies Finite State Machines 2.
Create a project schedule
Chpter#5 -part#1 Project Scope and Human Resource Planning
Team member, Team member and Team member
Defining the Activities
CPMGT 300 Competitive Success/snaptutorial.com
MGMT 404 Enthusiastic Studysnaptutorial.com
CPMGT 300 STUDY Lessons in Excellence--cpmgt300study.com.
CPMGT 300 Education for Service/snaptutorial.com.
Work Breakdown Structure
Time & Information Management
The Numbers Game.
MGT 605: CH 04 Defining the Project.
What is Project Cost Management?
Work Breakdown Structure
1/14/2019 An Introduction to Project Management and Software Process Improvements Mike Barker /14/2019.
Welcome W 15 Introduction to Engineering Design II (IE 202)
Network Logic Diagram 2/16/2019.
Double and Multiple Sampling Plan
Work Breakdown Structure and Activity List Workshops
Team member, Team member and Team member
Identifying the Work to Be Done
Project Scope Management
2-2 Logic Part 2 Truth Tables.
Presentation transcript:

Work Breakdown Structure 2/16/2019 Work Breakdown Structure What do we need to do? 2/16/2019

WBS: An Exercise Suppose we are going to make an Italian dinner. Answer the questions: What do you want on the table? What do we have to do to fix (each item)? That is a Work Breakdown Structure. Now, let's talk about the details. 2/16/2019

Italian Dinner: What's on the Table? 2/16/2019

Italian Dinner: What do we have to do to fix? 2/16/2019

Work Breakdown Structure What is it: An approach to answering the question of what do we have to do. Top-down: start by listing the deliverables. Then expand the activities needed for each one. Bottom-up: list activities that you know are needed. Then group them, and name the product of the activities (the deliverable) 2/16/2019

Approaches Sticky notes: (Easiest approach) use sticky notes and a large board. Let's you rearrange easily. Organization Chart (Powerpoint, Word, Visio) Outline format (Word, Excel) 2/16/2019

Two Approaches to Completeness "Classic" approach: try to ensure that all the work of the project is shown in the WBS. I.e., all the deliverables, and all the activities, should be shown. Use experts, stakeholder meetings, and other methods to make sure that everything is explicit. Agile/Extreme methods: Assume that we don't really know what all the work is. However, we do know what the near future work is. Do a "rolling wave" type WBS, filling in known deliverables and activities, and then adding more details later. Make sure you, your project team, and the stakeholders agree as to which approach you are taking. 2/16/2019

How Much Detail is Enough? Rule of Thumb: 1 person, 2 weeks "chunks" It depends. For rough cut with experienced staff, you can use "bigger" chunks. For better estimation and inexperienced staff, use "smaller" chunks. Rule of thumb: Do you know what to do? If yes, then you have enough detail. If not, you need to do more breakdown. 2/16/2019

Well-Defined Activities Status/Completion measurable Definite beginning and ending Activity has a deliverable Time to complete and cost easily estimated from prior or similar experiences. Activity duration is within acceptable limits Work assignments are independent (from Effective Project Management, 2nd Edition, by Robert K. Wysocki, Robert Beck Jr., and David B. Crane) 2/16/2019

Some Cautions Order is NOT important in a WBS (that comes later, in a network logic diagram) Don't forget Project Management, Communications, and other parts of the project that are often left out. Planning, meetings, etc. take time and resources! Try to keep to the same "level" of detail in activities. Although the examples don't show this, you can (and should, often) use subdeliverables and subactivities to break down the large chunks. Your WBS should make sense to you and your project team. 2/16/2019

WBS: Deliverables and Activities 2/16/2019

WBS: Nouns and Verbs 2/16/2019

WBS: Outline Format Deliverable Activity 2/16/2019

WBS: An Exercise As individuals, for 10 minutes Take your project and list the deliverables. List the activities for each one. As a group, for 20 minutes Construct a combined WBS using sticky notes for your project. As a group, for 5 minutes Collect the "lessons learned" in constructing the WBS 2/16/2019