Landfill Wernsdorf, construction areas 3 and 4

Slides:



Advertisements
Similar presentations
Role of Activity & Use Limitations in Clean Energy Development at Disposal Sites Elizabeth Callahan Acting Division Director, Policy and Program Planning,
Advertisements

9 x9 81 4/12/2015 Know Your Facts!. 9 x2 18 4/12/2015 Know Your Facts!
1 x0 0 4/15/2015 Know Your Facts!. 9 x1 9 4/15/2015 Know Your Facts!
1 x0 0 4/16/2015 Know Your Facts!. 1 x8 8 4/16/2015 Know Your Facts!
3 x0 0 7/18/2015 Know Your Facts!. 4 x3 12 7/18/2015 Know Your Facts!
Leachate Collection Systems. Class Objectives  To discuss landfill water balance  To present liner and leachate collection system (LCS) design information.
1 Results Based Regulation Implications for Municipal Solid Waste Management Presented By: Blake E. Nesbitt Saskatchewan Ministry of Environment SUMA Convention.
Company Overview of Charah Privately held company based in Louisville, Kentucky –Founded in 1987 Dedicated to providing the power industry the highest.
Impervius Engineered Coatings The Challenge: The concrete tanks were extremely fractured as improper construction caused failures in the concrete 4 separate.
Workshop Implementation of the Landfill Directive Full implementation of the Landfill Directive, the example of Germany Dr. Eva-Maria Krüger REMONDIS International.
4.5 Pounds of Trash are produced Per Person Per Day Where Does our Trash Go? 27% Recycled 16% Burned 57% Landfilled Nationally: 31% Recycled 69% Landfilled.
Development of Sanitary Landfill and Capping of Existing Dump site at Mysore
EXAMINATION OF MODERN SANITARY LANDFILLS W. Gregory Vogt Chair, Sanitary Landfill Working Group, ISWA Vice President, SCS Engineers.
W. J. M. K. PERERA (RU/E/2007/119) Department of Civil and Environmental Engineering.
CONSTRUCTION OF SOIL NAILING WALLS
 What is Depth of Soil?  The thickness of soil layers which have favorable permeability  What is permeability? The downward movement of water in soil.
Jasmit Bains and Jamie Laukaitis.  East Midlands - centre of the ‘Industrial revolution’  FACT : PRIDE - P artnership to R egenerate through I nnovative.
TDA IN LANDFILL GAS COLLECTION SYSTEMS. Why use Tire Derived Aggregate (TDA)? Tire Derived Aggregate (TDA) has properties that civil engineers, public.
Risk management. Berliner Energieagentur GmbH Risks of EPC Equipment transfered into the property of building owner at the moment of installation and/or.
W a t e r f o r L i f e.  Safe, decent, and adequate shelter includes access to water, sanitation, hygiene facilities, and drainage.  1 billion people.
The sand filter has to be moved from this location. The embankment cross section used in the slope stability analysis did not include the sand filter.
Three Gorges Project: A Project of the Century By: Xinyu Huang.
Technical Control Bureau for Construction SECONED Technical Inspection Service AON Nazomermiddag 08 sept Delft.
4.5 Pounds of Trash are produced Per Person Per Day Where Does our Trash Go? 27% Recycled 16% Burned 57% Landfilled Nationally: 31% Recycled 69% Landfilled.
Roli Jindal DuPont It is well established internationally that the use of geo-textiles enhances the quality and durability of roads.
EnE 301: ENVIRONMENTAL ENGINEERING
20 – Operation and Maintenance 1/45 “There is no sensible reason to design and prepare for a better engineered landfill if it is not operated in a better.
Technologies for Production of Non Woven Needle Felt Geotextiles Hjalmar Schwab New Delhi India DILO Group.
Improving Lives, Communities and the Environment Through Natural Resources Conservation.
4 x1 4 10/18/2015 Know Your Facts!. 5 x /18/2015 Know Your Facts!
3 x0 0 10/18/2015 Know Your Facts!. 11 x /18/2015 Know Your Facts!
Landfill Installation Considerations – Solar PV By: Gary Garfield, PE, LSP URS Corporation Salem, New Hampshire Renewable Closed Landfills.
THE BEST TRIP IN HISTORY! By: Carter Storrusten. Norway First of all we will be visiting Norway. Here are some facts on Norway Norwegians were Vikings.
Afghan-Centric Standard Construction Site Signage US Army Corps of Engineers BUILDING STRONG ® Afghanistan Engineer District.
New Jersey Turnpike Authority November 19, 2009 New Jersey Turnpike Interchange 6 to 9 Widening Program Presented by Lisa M. Kenney, P.E. 1.
Impacts of Road Projects on Environment & Recommended Mitigation Measures. (Presented for Discussion) December, 2008 E.C; Fogera Woreda, Woreta Abraham.
IRON HORSE PARK (SHAFFER LANDFILL) Don McElroy, EPA Region 1, Remedial Project Manager Source:
THE ENGINEERING COMPANY & ITS ‚SEA PROJECTS‘ September 2005 – Summer School.
Location and construction of water wells
Mandatory Requirements of Ecological Solid Waste Management Act (RA 9003) on CLOSURE AND REHABILITATION OF DUMPSITES.
Geotextiles 1.
Construction Inspection for FO Activities - Geosynthetics
Chapter 16 Landfill Liners and Geosynthetics
Rural Access Programme Development through access (4C) Quality Management Plan Presentation for CPD Training Ramesh Khatakho Engineering Officer, Kalikot.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
© 2016 Global Market Insights. All Rights Reserved Geotextile Market Price, Research Report, Analysis from 2017 to 2024.
Welcome to the World of Mondial
GEOSYNTHETICS Aquino Borral Morales.
Landfills.
Green Infrastructure Contractor Training Program 5WKS COST FREE
Project Project Objective Component 1 Component 2 Component n …
Geotechnical Engineering Department of Civil Engineering
Public Private Partnership Opportunities in Bismarck
Proposed Design Improvements
Green Energy and Green Spaces
Cooling System Test.
بازاریابی و بازرگانی زمستان 93.
The economic power of cities
17.7 Single Clay Liner and Single Geomembrane Liner Systems
Landfill Budenheim, Surface sealing system
Landfilling (Containment and Restoration) in Ireland
Learn Your 2x Facts.
Brencal Contractors Inc.
Landfill Plöger Steinbruch OFA

Coal Waste Storage Area Pond Design/Build Project Stanton Energy Center Chip Merriam Chief Legislative & Regulatory Compliance Officer.
Presentation transcript:

Landfill Wernsdorf, construction areas 3 and 4 STRABAG Umwelttechnik GmbH Landfill construction Landfill Wernsdorf, construction areas 3 and 4 Facts city (country) Königs-Wusterhausen (Germany) Client: BSR, Berlin (Germany) contractor: STRABAG Umwelttechnik GmbH, Düsseldorf (Germany) Engineering: ICU, Berlin (Germany) Contract value: 6.89 million EUR Construction period: 04/2011 ─ 11/2012 Recultivation of a landfill by construction of landfill capping system, consisting of: 81,541 m² Levelling layer, 15 cm thick 165,916 m² Supply and laying of geomembrane 82,958 m² Supply and laying of geotextile 800 g/m² 93,999 m² Supply and laying of drainage mat 1,650 m² Drainage layer, 30 cm thick 66,998 m² Supply and filling of subsoil, 70 cm thick 65,696 m² Supply and filling of topsoil, 25 cm thick 13,561 m³ Supply and installation of additional drainage areas 41,081 m² Supply and laying of protection geotextile Road construction and landfill infrastructure (ditches, degassing system and seepage areas)