Chapter 14 – Resource Planning

Slides:



Advertisements
Similar presentations
Inventory Systems for Dependent Demand
Advertisements

® Microsoft Office 2010 Excel Tutorial 3: Working with Formulas and Functions.
Operations Management
Chapter 14 – Resource Planning (MRP and ERP)
Chapter 14 – Resource Planning (MRP and ERP)
Chapter 9– Capacity Planning & Facility Location
ACOT Intro/Copyright Succeeding in Business with Microsoft Excel 2010: Chapter1.
Chapter 15 - Material & Capacity Requirements Planning(MRP/CRP)
© Wiley Chapter 1 - Introduction to Operations Management Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
Chapter 13 – Aggregate Planning
EYYUP ORAK Material requirements planning (MRP) is a computer-based inventory management system designed to assist production managers in.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Resource Planning Chapter 14.
The Fundamentals of Enterprise Resource Planning Olayele Adelakun (Ph.D) Assistant Professor CTI Office: Room 735 CTI 7th Floor Phone: Fax:
Material Requirements Planning (MRP)
CHAPTER MRP and ERP Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights.
Chapter 14 – Resource Planning Operations Management by R. Dan Reid & Nada R. Sanders 3rd Edition © Wiley 2007 PowerPoint Presentation by R.B. Clough -
Supplement D Master Scheduling and Rough-cut Capacity Planning
POM - J. Galván 1 PRODUCTION AND OPERATIONS MANAGEMENT Ch. 15: Material Requirements Planning (MRP)
Class 24: Chapter 15: Materials Requirements Planning Class 24 Agenda –Review Deliverables Due Dates –Review Final Exam 90% of the 30 questions will come.
Chapter 12 MRP and ERP.
Material Requirements Planning
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 14 Materials and Resource Requirements Planning McGraw-Hill/Irwin.
MRP Material Requirements Planning. MRP …is a planning and scheduling technique used for batch production of assembled items. … is a computer-based information.
MATERIAL REQUIREMENTS PLANNING (MRP) AND ERP Chapter 14 1.
1 Operations Management Lesson 6 Material Requirements Planning and Enterprise Resource Planning.
Operations Management Contemporary Concepts and Cases Chapter Sixteen Material Requirements Planning and ERP Copyright © 2011 by The McGraw-Hill Companies,
Aggregate Planning and Resource Planning Chapters 13 and 14.
1 Material Requirement Planning (MRP) Chapter 16 Feb 9, 2006.
13-1MRP and ERP. 13-2MRP and ERP  Material requirements planning (MRP): Computer-based information system that translates master schedule requirements.
Operations Management
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 14 MRP and ERP.
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc. Upper Saddle River, N.J Material.
Operations Management Material Requirements Planning
Resource Planning OPIM 310-Lecture #7 Instructor: Jose Cruz.
Chapter 15 MRP and ERP.
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1998 Material Requirements Planning (MRP) Chapter 15 11/7/05 Overview Position of MRP in Operation.
MRP and ERP McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Resource Planning Operations Management Chapter 15 Roberta Russell.
13-1MRP and ERP William J. Stevenson Operations Management 8 th edition.
Materials Planning & Control. Introduction With the development of ‘integrated materials management’ and ‘supply chain management’, material managers.
Chapter 14 – Resource Planning Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation by R.B. Clough -
Materials and Resource Requirements Planning CHAPTER FIFTEEN McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
MRP and ERP McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
1 MRP: Based on Dependent Demand u This chapter explores: –Master production schedule –Material Requirements Planning (MRP) »System structure »Example.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 18 Material Requirements Planning.
Aggregate Planning and Resource Planning Chapters 13 and 14.
Concepts in Enterprise Resource Planning Third Edition Chapter Four Production and Supply Chain Management Information Systems.
13-1MRP and ERP William J. Stevenson Operations Management 8 th edition.
MGMT Materials Management Systems Materials Requirements Planning Chapter 4.
Resource Planning Chapter 14. Step Stool Assembly.
Manufacturing Systems Engineering
Material Requirements Planning
EVOLUTION OF ERP 1960’s - Systems Just for Inventory Control 1970’s - MRP – Material Requirement Planning (Inventory with material planning & procurement)
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 MRP and ERP.
Accounting Guru Cloud ERP (Enterprise Resource Planning) ERP Software https:
Reid & Sanders, Operations Management © Wiley 2002 Material Requirements Planning 15 C H A P T E R.
1. Enterprise Resource Planning Enterprise Resource Planning Systems is a computer system that integrates application programs in accounting, sales, manufacturing,
MRP and ERP Chapter 14 Dr. H. Kemal İlter, BE, MBA, DBA
Concepts in Enterprise Resource Planning Third Edition
Facility Inventory Old Facilities Modern Facilities Classroom Size
Chapter 14 – Resource Planning
BUAD306 MRP/ERP.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
Material Requirements Planning and Enterprise Resource Planning
MRP and ERP.
CHAPTER 14 MRP and ERP.
Material Requirement Planning (MRP)
MRP and ERP.
14 MRP and ERP.
Material Requirements Planning and Enterprise Resource Planning.
Presentation transcript:

Chapter 14 – Resource Planning Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010 © Wiley 2010

Learning Objectives Describe enterprise resource management Describe the evolution of ERP Systems Describe the benefits and costs of ERP systems Provide an overview of MRP Explain the different types of demand Describe the objectives of MRP © Wiley 2010

Learning Objectives con’t Describe the inputs needed for MRP Explain MRP operating logic Describe action notices Use different lot size rules with MRP Describe the role of capacity requirements planning (CRP) Calculate the work loads at critical work centers using CRP © Wiley 2010

Enterprise Resource Planning ERP is software designed for organizing and managing business processes Modules share information across all business functions Can share customer sales data with the supply chain to help with global replenishment All modules are fully integrated and use a common database – some PC based © Wiley 2010

Integration of ERP © Wiley 2010

ERP Modules-4 Categories Finance and accounting Investment, cost, asset, capital, and debt management Budgets, profitability analysis, and performance reports Sales and marketing Handles pricing, availability, orders, shipments, & billing Production and materials management Process planning, BOM, product costing, ECN’s, MRP, allocates resources, schedules, PO’s, & inventory Human resources Workforce planning, payroll & benefits, & org. charts © Wiley 2010

Evolution of ERP First generation ERP Managed all routine internal business activities From order entry to after-sales customer service Lacked supply chain support modules (added in second generation) © Wiley 2010

Evolution of ERP Second Generation ERP Late 1990’s software integrated supply chains Systems focused on decision-making SCM modules include linear programming (LP) and simulation support SCI capability allows collection of intelligence along the entire supply chain ASP suppliers set-up and run systems for others © Wiley 2010

Integrating ERP and E-Commerce Many companies with ERP use e-commerce E-commerce needs to interface with ERP Cybex International is a good example: Needed to integrate B2C and B2B transactions Cybex installed a Peoplesoft, Inc. ERP system Reduced BOM’s from 15,200 to 200, suppliers from 1000 to 550, paperwork by 2/3 Reduced supplier material shortages and customer order-to-ship time from 4 to 2 weeks © Wiley 2010

Benefits of ERP ERP presents a holistic view of the business functions from a single information and IT architecture Increases organizational information flow Increases ability to incorporate better management control, speedier decision making, and cost reductions Allows replacement of disparate systems e.g. ExxonMobile used ERP to replace 300 different systems A study of ERP implementations reports that benefits typically start 8 months after implementation with median annual savings of $1.6 million © Wiley 2010

The Cost of ERP Systems Major suppliers are SAP AG, Peoplesoft, Oracle, and Baan. Also smaller PC based suppliers. Costs for larger ERP systems range from hundreds of thousands to several million dollars. Outside consultants are usually involved in selection, configuration, & implementation. © Wiley 2010

The Cost of ERP Systems Consultant costs can run up to 3 times the cost of the system itself. Added costs also include additional people, new computer hardware, and the cost to develop a new, integrated database Successful implementation requires leadership and top management commitment to a vision for the business © Wiley 2010

Material Planning Systems MRP translated a master schedule of final products into time-phased net requirements for subassemblies, assemblies, and parts First MRP systems evolved from closed-loop MRP Closed-loop MRP included production planning, master scheduling, and capacity requirements In mid 1970’s, MRPII systems added functionality to plan and execute all internal functions © Wiley 2010

An Overview of MRP MRP uses the concept of backward scheduling to determine how much and when to order and replenish The CPR module checks to make sure the scheduled work load profile is feasible The MPS module contains the authorized schedule The BOM module contains the product structure for each unique product MRP output includes schedules for all internal activities and parts as well as orders for all supply chain items. © Wiley 2010

Input/Output - MRP Process © Wiley 2010

Types of Demand There are two types of demand. Independent Demand Is the demand for finished products Does not depend on the demand of other products Needs to be forecasted Dependent Demand Is the demand derived from finished products Is the demand for component parts based on the number of end items being produced and is managed by the MRP system © Wiley 2010

Objectives of MRP Determines the quantity and timing of material requirements Determines what to order (checks BOM), how much to order (lot size rules), when to place the order (need date minus lead time), and when to schedule delivery (on date needed) Maintain priorities In a changing environment, MRP reorganizes priorities to keep plans current and viable © Wiley 2010

Building a CD Cabinet With MRP © Wiley 2010

MRP Inputs - Authorized MPS From the authorized MPS, we calculate when we need to have replenishment orders of CD cabinets; when we need a new MPS order. © Wiley 2010

MRP Inputs-Inventory Records System checks the inventory record for each BOM item to see if inventory is available or if a replenishment order is needed to build the cabinets. © Wiley 2010

MRP Inputs-Bills of Material A BOM lists all of the items needed to produce one CD cabinet The BOM is exactly like a recipe for baking a cake The BOM’s must be complete and accurate and can only be changed by an ECN MRP BOM’s are indented bills of materials Indented BOM © Wiley 2010

A Product Structure Tree © Wiley 2010

The MRP Explosion Process Using this table and the product structure tree, we will work through an example of how the MRP explosion process calculates the requirements for building a CD cabinet. Next we start with the cabinet top to show how MRP calculates the gross requirements for this component. © Wiley 2010

Inventory Records - Components It was noted on the previous slide that the parent item (CD Cabinet) has planned orders in periods 3, 6, and 9. Its children (top, bottom, door, left & right side, shelves, and supports) have gross requirements in periods 3, 6, and 9. © Wiley 2010

Inventory Records - Components © Wiley 2010

Inventory Records– Components con’t © Wiley 2010

Inventory Records– Components con’t © Wiley 2010

Inventory Records – Remaining Components © Wiley 2010

Inv. Records – Remaining Components con’t © Wiley 2010

Inv. Records – Remaining Components con’t © Wiley 2010

MRP Action Notices Action Notices: Indicate items that need a production planner’s attention Are created when a planned order needs to be released, due dates need to be adjusted, or when there is insufficient lead time for normal replenishment Often require planners to rush or expedite orders © Wiley 2010

MRP Action Notices Action Bucket: Is the current period where we take actions such as releasing, rescheduling, or canceling orders A positive quantity in current period’s planned order row means that an order must be released © Wiley 2010

Example Comparing Lot Size Rules: Three lot sizing rules used within MRP Systems are: fixed order quantity (FOQ), lot for lot (L4L), and period order quantity (POQ). Cost comparison is based on Inventory holding costs ($0.10/period) and ordering cost ($25/order). In this example POQ is best at $133.50. © Wiley 2010

Rough Cut Capacity Example: The CRP module uses data from MRP Rough Cut Capacity Example: The CRP module uses data from MRP. Calculate workloads for critical work centers based on open shop orders and planned shop orders. These shop orders are translated into hours of work by work center and by time period. Table 14-11 show items scheduled for work Center 101. Available = 4 machines x 2 shifts x 10 hours x 5 days x 0.85 utiliza- x 0.95 effi- Capacity per shift per wk. tion ciency Available = 323.0 standard hours Capacity © Wiley 2010

Workload Graph for Work Center 101: CRP enables a company to evaluate both the feasibility of the MRP system and how well the company is using its critical work centers. © Wiley 2010

Resource Planning within OM: How it all fits together Enterprise resource planning provides a common database for use by an organization, its suppliers, and its customers. MRP reports are used by the production and inventory planners to (1) generate purchasing requisitions and (2) develop schedules of different activities to be done on the manufacturing floor. Techniques for sequencing activities are discussed in Chapter 15. The authorized MPS, the bill of material (BOM) file, and the inventory records are inputs to the MRP system. It is critical that the MPS be feasible and that the BOM file and the inventory records be accurate. This implies that the time standards (Chapter 11) are valid and that cycle counting (Chapter 12) be used to maintain inventory record accuracy. If not, material is not ordered at the appropriate time in the right quantity. © Wiley 2010

Resource Planning Across the Organization Since MRP determine the quantity and timing of materials needed, it affects several functional areas Accounting future material commitments based on MRP output Marketing is primarily concerned with MPS as the MRP reveals potential material shortages Information systems maintains the MRP and the MPS © Wiley 2010

Chapter 14 Highlights ERP is software designed for organizing and managing all business processes by sharing information across functional areas using a common database and a single computer system. First generation ERP systems provided a single interface for managing routine activities performed in manufacturing. Second generation systems or SCM –software are designed to improve decision making in the supply chain. The current trend is integrating e-commerce and ERP. Tangible benefits from ERP include reductions in inventory and staffing, increased production, improved order management, and increased revenue and profits. © Wiley 2010

Chapter 14 Highlights con’t MRP systems are designed to calculate material requirements from dependent demand items. MRP systems use backward scheduling to determine activity start dates. Independent demand is the demand for finished products, whereas dependent demand is demand that is derived from finished products, MRP system use dependent demand. The objectives of MRP are to determine the quantity and timing of material requirements and to keep schedule priorities updated and valid. MPR determines what to order, how much to order, when to place the order, and when to schedule the arrival. © Wiley 2010

Chapter 14 Highlights con’t MRP needs three inputs: the authorized MPS, the BOM file, and the inventory records file. The MPS is the planned build schedule, the BOM files shows the materials needed to build an item, and the inventory records file shows the inventory on hand. Once the MPS has been input, MRP checks the inventory records to determine if enough end-item inventory is available. If sufficient end-item inventory is not on hand, MPR checks the end-item’s BOM file to determine what materials are needed and in what quantities. Action notices show when to release planned orders, reschedule orders, or adjust due dates. They allow the planner to use the MRP output information effectively © Wiley 2010

Chapter 14 Highlights con’t Different lot size rules are used with MRP systems to generate different order quantities and order frequencies. The lot-for-lot (L$L) rule always minimizes the inventory investment but maximized ordering costs. Planned orders generated by MRP, plus any open shop orders, are inputs to capacity requirements planning (CRP). CRP checks to see if available capacity is sufficient to complete the orders scheduled in a particular work center during a specific time period. CRP calculates the workloads at critical work centers by using the planned orders generated by the MRP system. These planned orders are multiplied by the standard times to calculate individual work center loads. © Wiley 2010

Homework Hints Problems 14.1-3, 3sp. Use the data given to: prepare a product structure tree. determine the product lead time. calculate gross requirements, starting with 100 units of the end item (Q). 3sp. do an MRP chart—using either the excel or word chart given on the website. Assume gross requirements for Q is in period 9; assume L4L is to be used for all components. Problems 14.23-24. Do a CRP: Calculate the required capacity (based on each job’s set up and run times). Calculate the available capacity (based on available time for three machines adjusted for utilization and efficiency). Determine the match between required capacity (14.23) and available capacity (14.24).