Eric Graves, P.E. City Traffic Engineer Alpharetta, Georgia

Slides:



Advertisements
Similar presentations
Tysons Tysons Corner Circulator Study Board Transportation Committee June 12, 2012.
Advertisements

FHWA Guidance & Policies on Traffic Analysis James P. McCarthy, PE, PTOE Federal Highway Administration
Public Involvement Open Houses Develop Problem Statement Review plans, policies, regulations, and standards Identify and assess Alternate Mobility.
Phoenix Adaptive Control Technology Showcase Cobb County Georgia
Great Western Corridor Feasibility Study
Fast Forward Ramp Meter Design for Metro Atlanta Taylor H. Stukes, PE Gresham, Smith and Partners 2325 Lakeview Parkway, Suite 400, Alpharetta, Georgia.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Background Why Plan For Transportation? Facts You Should Know Expectations Projects and Costs Conclusions/ Next Steps.
U.S. Department of Transportation Federal Highway Administration ACS-Lite FHWA Adaptive Signal Control Systems Raj S. Ghaman, P.E. Team Leader, Office.
US 1 CORRIDOR STUDY AND PROJECT PRIORITIZATION PROCESS Augusta, GA November 29, 2012 Jeff Carroll CDM Smith Georgia Association of MPOs Annual Conference.
Welcome to El Dorado Hills. Goals of Presentation Summarize growth, traffic, and road network state affecting planning in EDH - Especially where not easily.
Adaptive Traffic Pilot Programs Eli Veith, PE, PTOE.
Transportation Data Palooza Washington, DC May 9, 2013 Steve Mortensen Federal Transit Administration Data for Integrated Corridor Management (ICM) Analysis,
Consolidation Commission - Transportation Sub-Committee City of Orlando Signalization Presentation September 8, 2005.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
ICM San Antonio – IH-10 Corridor Brian Fariello, TxDOT.
Transportation Research Board 2004 Annual Meeting Adaptive Signal Control Workshop Session 2: Field Experience January 11, 2004.
San Jose Traffic Signal Communications and Synchronization Project Presented by Ho Nguyen City of San Jose, Department of Transportation May 12, 2009.
Building a Traffic Signal and Sign Inventory for the City of Edmond GIS Staff updated traffic feature classes and the related objects based on information.
History of US Bicycle Routes In 1970’s interest in long distance bicycle travel proliferates.
Applied Transportation Analysis ITS Application SCATS.
Infrastructure Vulnerability Profile. Are you considering hazard and climate risks in your infrastructure planning, siting, and improvement decisions?
By Syd Bowcott, URS Corp Bayne Smith, URS Corp.  Purpose of this Presentation  Overview of Project Area  Background  Project Goals  Stakeholders.
FDOT District 1 ITS Project Update Katherine Duvall ITS Project Manager.
Definition - CommuterLink CommuterLink is an interagency transportation management system. What does that mean? Put another way, it is the use of computer.
Fast Forward Full Speed Ahead Presented at the Joint ITS Georgia / Tennessee Annual Meeting September 25, 2006 by Carla W. Holmes, P.E., PTOE Georgia Department.
TSM&O FLORIDA’S STATEWIDE IMPLEMENTATION Elizabeth Birriel, PEElizabeth Birriel, PE Florida Department of TransportationFlorida Department of TransportationTranspo2012.
ADAPTIVE SIGNAL CONTROL TECHNOLOGY MODEL SYSTEMS ENGINEERING DOCUMENTS 1 December 20, 2012.
Jump Starting ITS Deployment in Los Angeles County using Wireless Communications Lessons Learned.
BRT in India Delhi Case study. What is Delhi HCBS Delhi HCBS is not a BRT system. It is primarily a road infrastructure project. It was not conceived.
May 1, 2014 East Gude Drive Pedestrian Road Safety Audit Stakeholder Pedestrian Safety Meeting.
TRAFFIC SIGNAL OPTIMIZATION: A Coordinated Effort Tom Dancey, P.E. Signal System Engineer City of Springfield CITY OF SPRINGFIELD & MISSOURI DEPARTMENT.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
Georgia’s Regional Traffic Operations Program Christopher Barrow, E.I.T. Traffic Engineer II.
Georgia’s Intelligent Transportation System
1 Adaptive Control Software – Lite (ACS-Lite) Eddie Curtis, P.E. FHWA Resource Center / HOTM NTOC Webcast March 27, 2008.
Orange County Traffic Signal System Consolidation of Services Study Commission Meeting September 8, 2005.
Success with Miami-Dade County’s ATMS Upgrade Success with EMBEDDED INTEGRATORS Presented at: ITS America Annual Meeting Houston, Texas May 4th, 2010 by.
MIT - October 1, 2004Jeffrey D. Ensor 1 RSTP Planning for Operations Jeffrey D. Ensor Malaysia Transport Group M.I.T. October 1, 2004.
Adaptive Signal Control Technology: Bringing a Systems Approach to Implementation and Evaluation October 18, 2011 Kevin Fehon, P.E., PTOE DKS Associates.
Regional Transportation Issues Infrastructure Maintenance New Facilities Air Quality Pollution Congestion Freeway System Surface Streets Income.
Portland State University 11 By Maisha Mahmud Li Huan Evaluation Of SCATS Adaptive Traffic Signal Control System.
Michele Mueller Senior Project Manager Applying Intelligent Transportation Systems to Cross Border Issues TC / FHWA Regional Roundtable Mike Barnet Senior.
SIGNAL OPTIMIZATION STUDY COMMUNITY DEVELOPMENT DEPARTMENT.
Smart Information for a Sustainable World True Adaptive Signal Control A Comparison of Alternatives Technical Paper # Presentation to the 18 th World.
Regional Concept for Transportation Operations: An action plan to address transportation operations in Southeast Michigan Talking Technology & Transportation.
Integrated Corridor Management Initiative ITS JPO Lead: Mike Freitas Technical Lead: John Harding, Office of Transportation Management.
2010 Regional Intelligent Transportation Systems Plan: 2015 Progress Report on Implementation.
Transportation System Management & Intelligent Transportation Systems May 5, 2009 Steve Heminger Metropolitan Transportation Commission.
Transportation Systems Management and Operations: Why It Matters Presenter Name Date AGENCY LOGO Photo: © Shutterstock.com/iofoto ( )
Support for Connected Vehicle Testing in Urban Environment 2015 International Conference on IT and ITS.
HB 277 Regional Transportation Sales Tax Preliminary Project List Presentation Mayor and City Council Work Session March 1, 2011.
Livingston County Transportation Connectivity Plan Final Report December 2013.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
Meadowlands Adaptive Signal System for Traffic Reduction December 2011 Leo Almanzar P.E., P.P., P.T.O.E. Hong Yuan, P.E., P.T.O.E.
FOOTHILL ELEMENTARY TRAFFIC PROBLEM SOLVING May 19, :30 p.m.
Bell Road Adaptive Signal Control Technology (ASCT) Deployment Project
Chelan County Transportation Element Update
VDOT’s Operations Program Opportunities May 20, 2016
Operations and Service Concept
Intelligent Transportation Systems
2010 Regional Intelligent Transportation Systems Plan: 2017 Progress Report on Implementation The Florida-Alabama, Okaloosa-Walton, and Bay County Transportation.
Bell Road Adaptive Signal Control Technology (ASCT) Deployment Project
Draft Transportation Element September 6, 2017
An ACSLite Case Study Riva Road in Annapolis, MD
Adaptive Signals & ALDOT
Transportation Research Board 2004 Annual Meeting
Meeting of the Hillsborough MPO Board December 5, 2017
Sarah Tracy, P.E., PTOE Assistant Traffic Engineer
Presentation transcript:

Eric Graves, P.E. City Traffic Engineer Alpharetta, Georgia Adaptive Signal Control Technology:  Managing Risks, Achieving Objectives Eric Graves, P.E. City Traffic Engineer Alpharetta, Georgia

Alpharetta Transportation System 50,00 Residents Day Time Population~100,000 ADP HP UPS North Point LCI Downtown LCI

Alpharetta Transportation System 4 Interchanges with GA 400 (Limited Access Freeway) 7, 4-6 Lane Arterial Streets ~ 120 Traffic Signals 3 Emergency Signals at Fire Stations 1 Hawk Signal – April All newer equipment – GDOT ATC Program 332 cabinets 2070 controllers – SEPAC Firmware Ethernet Communications 60% direct connections to City TCC

Traffic Operations 2 Public Works Crews 1 Signal Systems Engineer Signs Signals 1 Signal Systems Engineer 1 Traffic Engineering Technician Inspect Construction Projects Manage maintenance contracts Striping Loop Repairs

Traffic Operations Signal Systems Engineer Signal Timing Maintenance Program Systemic timing of all traffic signals every 2-3 years Before/After travel time measurements Timing reports to be published on the City Web Site (soon)

Why Adaptive?? Less $$ available for capacity improvements Less opportunity for new roadway connections Alpharetta is land locked and nearly built out Essential we operate our system as efficiently as possible Initiative included Systems / Timing Engineer PM Program Timing Maintenance Program

Why Adaptive ?? Traffic STILL a top concern from citizen survey What else can be done??? Cobb County SCATS System Councilman read article on SCATS Success Directed Staff to investigate options for Alpharetta

When Adaptive Makes Sense Unpredictable Traffic Flow High sustained growth Freeway system interactions

When Adaptive Makes Sense Agency Capabilities Technician capabilities Detection at 98%!! Strong communications Fiber along all major corridors Stable Ethernet field network

When Adaptive Makes Sense Agency Capabilities Engineering Staff In-house signal timing maintenance program “One of the best signal timers in the state”

When Adaptive Makes Sense Desire Continuously Optimized Timings!!

Alpharetta Adaptive Signal Evaluation: Hypothesis A well-timed system is a well-timed system Cycle length- appropriate for volume Split percentages- balanced or prioritized Offsets- provide good progression Peak-hour performance on day 365 and 730 should be better than doing nothing Pause for questions

Alpharetta’s Criteria Should be able to perform close to manual optimized timings Maximize the utilization of existing infrastructure 332 cabinets/ 2070 controllers/ SEPAC Firmware Ethernet Communications/ECOMM Optimize Progression on Corridors Provide Queue Management Coordinate crossing arterials?? Manual control?? Special events/Seasonal Peaks/Incidents

Identified Solutions SCATS – Cobb County SCOOT **OFFERED DEMO** ACS Lite InSync **OFFERED DEMO**

Identified Solutions The City of Alpharetta performed demonstration projects with two adaptive platforms InSync and SCOOT The results of the demo projects indicated that adaptive solutions could replicate current timing efforts Potentially improving operations for special events, unexpected events, and off peaks periods

Other Systems Considered SCATS New Firmware New Detection Separate Central System OPAC Distributed solution – more rigorous detection requirements ACS Lite Presently not available in TACTICS Presently does not optimize cycle length

Next Steps SR 9 18 mile corridor Sandy Springs Roswell Alpharetta GDOT 18 mile corridor Collector between outer suburbs and GA 400 interchanges Primary arterial (Sandy Springs/Roswell) Back up for GA 400 PM Team identified Adaptive as an ITS Strategy

SR 9 ATMS Project PM Team initially considered performance Spec FHWA/GDOT indicated that as written only one vender likely fulfilled requirements FHWA determined documentation was insufficient to sole source

SR 9 ATMS Project GDOT/FHWA Required PM Team to follow Federal Regulations mandating System Engineering Process to select Adaptive Solution

SR 9 ATMS Project Systems Engineering Report completed and accepted by FHWA Systems Engineering Process identified similar functional requirements as the Alpharetta demo projects SCOOT determined as preferred option Compatible hardware with jurisdiction platform Ability to coordinate with non-adaptive intersections using Tactics Central System

SR 9 ATMS Project Project recently received NTP!!

egraves@alpharetta.ga.us eveith@alpharetta.ga.us Questions?? egraves@alpharetta.ga.us eveith@alpharetta.ga.us