Review of OAD – Proposed Planning

Slides:



Advertisements
Similar presentations
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Advertisements

Project Management An Overview John Mulhall MIICM; LIB International Credit & Process Management Professional.
Senior Stakeholder Forum Wednesday 19 th June 2013.
Review of Offtake Arrangements Document Section I - NTS Operational Flows 9 th July 2010 – Offtake Arrangements Workstream.
Modification Process Simplification Mike Hayes Exelon Nuclear.
Gas Performance Assurance Framework 11 th January 2013 Confidential.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
DEX Publication Project OASIS PLCS TC Face-to-face meeting 1 October 2007 Trine Hansen.
1 Modification Proposal 0199: Clarification around the application of the UNC Dispute Resolution Process Alison Chamberlain National Grid Distribution.
Review of Offtake Arrangements Document Section I - NTS Operational Flows 10 th June 2010 – Offtake Arrangements Workstream.
NTS Exit Regime Transmission Workstream – 6 th July 2005.
Partnership refresh and refocus
CMM Tech Refresh Project Update
Status of Implementation of PCR for Day-Ahead Price Coupling
Introduction to LDC Strategy
EIA approval process, Management plan and Monitoring
Status DEX Publication Project
Transmission Workgroup 7th July 2011
Offtake Workstream : 8th September 2010
Review of UNC Section Q “Emergencies”
Code Governance Review UNC Modification Proposals
Step 3: Legally Binding agreements and contracts
Key Information Summary (KIS)
Overview of Stakeholders and Key Roles
Industry Governance Group 9th July 2009
UNC Modification Proposal 0373
UNC Modification 0663S Extending the data comprised under the definition of Supply Point Premises Data (TPD V5.18.1) and iUNC Modification 114 Extending.
UNC Trader User – Licence obligations
UNC 0407 Analysis Scope - Update
Chapter 9 – Software Evolution and Maintenance
Electricity Governance Comparison
Insert name of who presenting to
XRN4770 – NDM Sample Data – Modification 0654 delivery – Amended file format ChMC – 9th January 2019.
Project Nexus Workgroup
2019 Release Planning Options inc Modification 0621 / GB Charging Project DSC Change Management Committee update July 2018.
0433: Inclusion of the Transmission to Distribution “System Operator Agreement Guidelines” within the Offtake Arrangements Document.
UK Link Programme and ‘Nexus’ UNC Modifications
CSS Update for CoMC 19th September 2018
UK Link Programme Engagement Forum
Chapter 8 Software Evolution.
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
DSC Change Committee Summary – 10th October
Review of OAD – Drawings Proposal
MOD National Grid NTS Initiated Flow Swaps
Flow Swaps at NTS / LDZ offtakes
Project Scope Management
Proposer: Transporter /
Proposed Transitional Gas Exit Arrangements
Gas Customer Forum DN Interruption Update - Introduction
Richard Fairholme Transmission Workstream 4th September 2008
Mark Freeman 29th January 2007
Modification 0448 – European Driven Change Process Flow Diagram
Reinstatement of NTS Interruption
Overall Project RAG Status
DNO Obligations to Facilitate Resolution of Unresolved USRVs
Recovery of Costs due to Invalid Ex-Ante Contracted Quantities in Imbalance Settlement 25th January 2018.
Performance Assurance Framework (‘PAF’):
Implementation Approach Distribution Workgroup – June 2014
UIG Task Force Progress Report
ORC Strategic Objective
Project Nexus Workgroup
UIG Task Force Progress Report
UIG Task Force Progress Report
UIG Task Force Progress Report
(Project) SIGN OFF PROCESS MONTH DAY, YEAR
West Contra Costa Unified School District May 18, 2011
Bolton Community Homes
DSG Governance Group Recommendations.
RAASP DSC Change Management Committee update
Presentation transcript:

Review of OAD – Proposed Planning Darren Dunkley November 2018

Review of OAD Work Streams Presentation info in footer Review of OAD Work Streams The original plan was envisaged as: Develop Process for Updating Site Owner Drawings Develop mechanics for Maintenance Sharing & Review OAD Section G Review OAD * UNC Mod * Scope to be determined i.e. agree sections before delivery approach can formulated 16/02/2019

Review of OAD Revised Work Streams Presentation info in footer Review of OAD Revised Work Streams UNC Mod CNI Drawings Maint’ance OAD Refresh Update SA The key areas of work that have emerged are: Redundant Assets Shared Sites Tri-Party Sites Definitions 16/02/2019

Review of OAD Delivery Approach (Original Proposal) Presentation info in footer Review of OAD Delivery Approach (Original Proposal) It was originally identified that a multi-phased approach may be necessary to review and update the key sections of OAD: Phase 1 Drawings Process Review Maintenance Sharing OAD Sections, A, B, C, G and Supplemental Agreement Other Key Issues (ROV’s) Reform Offtake Committee Phase 2 Other OAD Sections as agreed 16/02/2019

Review of OAD Revised Approach (Proposed) Presentation info in footer Review of OAD Revised Approach (Proposed) It was originally identified that a multi-phased approach may be necessary to review and update the key sections of OAD: Phase 1 Section G (Maintenance) Updated SA Template OAD Refresh Sections, A, B and C (Quick Wins) Redundant Assets Shared Sites Implement Offtake Work Group Phase 2 CNI Drawings Process OAD Refresh Sections A, B and C (non Quick Wins) Other Future Phases Other OAD Sections as agreed 16/02/2019

Review of OAD Proposed Plan Presentation info in footer Review of OAD Proposed Plan Phase 1 * UNC Mod 2 Future Phases March 2019 March 2020 * Includes Review Report to Mod Panel 16/02/2019

Review of OAD Action Required Presentation info in footer Review of OAD Action Required If a multi-phased approach is still acceptable the review group needs to agree: How many phases are required What work will be delivered within each phase The delivery horizon for each phase Each phase needs to be manageable for the group to deliver, and commitment will be required from all operators to drive the changes through to implementation. 16/02/2019