Incident took place at OPP substation at 9. 31

Slides:



Advertisements
Similar presentations
An Introduction to On-line Partial Discharge Surveys
Advertisements

Site Safety Plans PFN ME 35B.
1 According to PETROSAFE safety policy, the company is keen that: Introduction All Egyptian Petroleum companies and foreign companies working in A.R.E.

MEP201 Mechanical Engineering Drawing 1st semester
Chapter 3 Basic Logic Gates 1.
Engineer Training XL1200 Safety System. Engineer Training XL1200 Safety System Confidential 2 Standard Requirements Both the machine and the Safety System.
Occupational Health and Safety Accident Investigation Training HS6_
1S25 Arc Fault Monitor. 1S25 Arc Fault Monitor 1S25 Arc Fault Monitor Electrical arc short circuits in metal clad switchgear may occur for many different.
Practical Considerations for Digital Design
Tuesday 13 th December 2005 Substation SB400. Final testing in 10Kv substation.
 E4 Electrical Installation #1 Power Distribution.
Accident Investigation for Supervisors
MABAS Division 10 - Com Ed Program1 Electrical Safety Reference: The Power of Training Electrical Safety Commonwealth Edison Company.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
ACADs (08-006) Covered Keywords Switchgear, motor control, ground, circuit breaker. Description Supporting Material
MAIN ELECTRICAL SURVEY ITEMS, GENERATORS AND GOVERNORS,, CIRCUIT BREAKERS, SWITCHBOARDS AND FITTINGS (Adapted from:D.T. Hall:Practical Marine Electrical.
Electrical Safety and Grounding Essentials Copyright © Texas Education Agency, All rights reserved.
Introduction Most accidents are caused by the uncontrolled release of hazardous energy. Many of these accidents can be prevented by proper lock-out/tag-out.
Work with a valid work permit when required
1. 2 Safety work-stoppage PDO & its contractors have suffered THREE high potential incidents involving cold cutting in the last TWO months.
Equipment and Setup NCCER Unit 7.
© ABB Group Aug-15 Medium Voltage Hard Bus Retro-fill ABB MV Service.
MNM Fatal Machinery Accident Machinery Accident May 24, 2010 (Oklahoma) May 24, 2010 (Oklahoma) Crushed Stone Operation Crushed Stone Operation.
Electrical Safety Safety Training Series
Electrical Safety INSTRUCTOR’S NOTES:
Turbine Crane CRANES TURBINE NEA39. Turbine Crane PLANT STATUS! PV Daily Status Report.
Electrical Safety INSTRUCTOR’S NOTES:
ESTW/ Castor The company has to take care that: Equipment and switchgears are operated according relevant standards The errection, extension and maintenance.
XpsOES : A New Tool for Improving Safety at Workplace Yasar Kucukefe, Ph.D., National Power Energy.
All rights reserved MV SWITCHGEAR.
Need for protection Power system must be kept in operation continuously without major breakdowns This can be achieved in two ways: 1.Implement a system.
Substation Inspection Program. Mission Substation Incident The event occurred on December 20, 2003 during the peak Christmas shopping season A fire occurred.
SAFETYSAFETY. Overview ●Introduction to Safety ●Potential Electronic Mishaps ●Safe Work Practices.
Frankfurt (Germany), 6-9 June 2011 Louise Jakobsen, Danish Energy Association – Denmark – Session 3 – Paper 0811 Louise Jakobsen, Danish Energy Association.
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
MNM Fatal Electrical Accident Electrical Accident October 10, 2010 (Oklahoma) October 10, 2010 (Oklahoma) Granite Operation Granite Operation Contract.
POWER HOUSE.
A PRESENTATION OF PRACTICAL TRAINING ON “400KV GSS “ \
A SUMMER TRANNING PRESENTATION ON 400 KV GRID SUB STATION BIKANER
A Presentation On 132 KV GSS BEHROR
SEMINAR PRESENTATION ON 220 KV GSS UDAIPUR
ON 400 KV GSS RAISER JAIPUR ROAD ,BIKANER
A Training Presentation On 132 KV GSS JAIPUR Submitted in partial fulfillment For the award of the degree of BACHELOR OF TECHNOLOGY Submitted To:- Submitted.
A SEMINAR ON 400 KV GSS(RRVPNL) BIKANER.
My ELC work RM by Unit 1 Health & safety Resistant Materials.
MNM Fatal Electrical Electrical November 18, 2013 (Kentucky) November 18, 2013 (Kentucky) Crushed Stone Mine Crushed Stone Mine Contract Electrician.
1 AS OF:141330DEC15 UNCLASSIFIED OPR: 8A 8A Safety Electrical Safety Awareness Training Note: This training meets the General Electrical Safety Awareness.
Report on the Western Cape outages for the period November 2005 to February 2006.
What makes substation work?
EFFECTIVE ACCIDENT/INCIDENT INVESTIGATION 15 FEBRUARY 2013 PHILIPPINE ASSOCIATION OF SAFETY ENGINEERS -QATAR- -QATAR- COMMITTEE ON SAFETY EDUCATION 2013.
Energy Coal, HSEC, September 2009 ICAM : Oil Circuit Breaker Explosion Incident date: Saturday 5 th September, 2009 Before After.
Electrical Events Involving Look-Alike Equipment within the DOE Complex.
This project on Primary sub station of Visakhapatnam port trust at Visakhapatnam. It is 132kv/11kv substation with incoming feeder from APTransco and 11.
Switches and Over Current Protective Devices Class Instructor ALPHER E. DE VERA, uap.
© BLR ® —Business & Legal Resources 1501 Accident Investigation.
ELECTRICAL INSTRUMENTS ( service and utilization )
6 Week industrial Training Presentation
Design a protection System of 220/33kV Grid Station United Arab Emirates University College of Engineering Saif Mohammed AL Aryani Ahmed Soruor.
Automatic Transfer Switches
Operating gear switch pursuant to its operational function
SUB-STATIONS.
Isolate batteries before attempting to handle
DESCRIPTION AND GUIDE TO OPERATIONS
Electrical Safety Equipment
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
HSE LEARNING INCIDENT:
PSS0 Design & Concept of Operations
√ X HSE LEARNINGS INCIDENT: Root Causes: LEARNING:
Substation Equipment's
Presentation transcript:

Incident took place at OPP substation at 9. 31 Incident took place at OPP substation at 9.31.38 hrs on the 13th of Feb 2007. Six persons were injured (4 from OPP and 2 from EPC contractor) One person died at Sohar hospital later in the day 6.6 KV switchgear (incomer to Main Transformer ‘B’) was damaged in the incident

Emergency Response Team responded immediately and conducted a search and rescue operation Incident declared as level 2 ROP Civil defense and SRC called immediately and they arrived at 10 a.m. Site declared normal at 10.30 hrs

Summary of the incident On 09:31:38 13th February 2007, ground fault through the human occurred during rectification work on the earth switch inside the voltage transformer compartment of the 6.6 KV incomer ’B’ The technicians have isolated the Circuit breaker of the 6.6kV Incomer B (secondary of the main ‘B’ transformer) and then tried the earth switch which did not close. Then they opened the 6.6kV voltage transformer cabinet door overlooking the isolation of 33KV primary of the transformer. After racking out the Voltage Transformer, the person approached inside the cabinet compartment of incomer B to rectify the Earth Switch mechanism while the bus was live and the accident took place.

Single line diagram of Incoming power CB (0BF1) TR1B VT ES 6.6KV FEEDER CB TIE CB (0T) CB (0AF1) CB (1A) TR1A 33 KV TIE CB (1T) 33KV FROM SRC SUBSTATION INCIDENT LOCATION CB (0B) CB (0A) CB (1B) 33 KV primary not isolated 6.6KV incomer

INCIDENT TIME TABLE (FEB. 13 2007) 21 22 23 24 25 26 27 28 29 30 31 32 33 6.6kV CB (1B) RACK OUT 09:21:54 Minutes AM 09: 6.6kV SWGR Fault Signal 09:31:38 INCIDENT TIME: FEB. 13 2007 09:31:38 33kV CB (0BF1) Trip Open FIRE ALARM SIGNAL (S/S) 09:32 12 13 14 15 16 17 18 19 6.6kV CB 1T CLOSE 6.6kV CB 1B OPEN 09:13:15

Root Causes for the accident Transformer primary 33KV power supply not isolated hence 6.6 KV incomer to the switch gear was live. Opening of 6.6 KV switch gear bottom voltage transformer door and removal of transformer and side cover to rectify earth switch without valid work permit and under live conditions.

Causes contributing to the accident Isolation of 33 KV primary supply to transformer ‘B’ which was mentioned in the work permit was not accomplished and Earth switch for 6.6 KV incomer switch gear not working. Logic provided by ABB vendor in the 6.6 KV incomer ‘B’ earth switch was incorrect and not matching with construction drawings. This incorrect logic was also preventing the earth switch from closing. (Post observation) Maintenance procedure was not followed strictly. Opening the Voltage Transformer door, removal of Voltage transformer and rectifying the earth switch without hazard analysis and work permit. Assumption that primary has been isolated and Misconcept that breaker cabinets for motor and incomers are same. Inadequate supervision and control of the job.

Recommendations Permits to work system to be followed strictly. Tool box talk to be carried out before starting the job. Problem analysis to be done before performing rectification work. Logic design provided by ABB to be reviewed and rectified. Maintenance procedure to be followed strictly. Implement access control on the bus / voltage transformer doors when it is in live condition. Instructions on the secondary and incomer primary breakers that isolation else where is required for power OFF. Use of High voltage tester before accessing bus related work. Additional training for electrical team on ABB switchgears. Implement additional control measures for performing work on High voltage systems.