USJE Integrated Environmental Permit Application

Slides:



Advertisements
Similar presentations
Pagina 1 de 3 CEPSA Química QUIMICA Palos de la Frontera Jul 12 th, 2012 CEPSA QUIMICA PALOS DE LA FRONTERA IPPC DEVELOPMENT.
Advertisements

INTRODUCTION TO ISO Joan Kithika. OUTLINE DEFINITIONS WHY ENVIRONMENTAL MANAGEMENT? LEGAL OVERVIEW HOW TO MANAGE THE ENVIRONMENT-AN ENVIRONMENTAL.
RMC Pacific Materials Purchased The Terminal From Ideal Cement
Green Manufacturing: Adopting Energy Efficiency in Manufacturing Supply Chains -Dangote Cement Strategy By Pabby Paramjit Director, Dangote Academy.
Law approximation and implementation in Hungary Ministry for Environment Department of Integrated Pollution Control Nicosia, May 2001 Andrea Nám, desk.
Cement 1.Production rose by 60% in the last 10 years 2.China: 44% of world production 3.Top 10 companies represent 55% of global capacity, but many very.
SERBIA AND MONTENEGRO Tanja Popovicki Department for International Co-operation Ministry for the Protection of Natural Resources and Environment of the.
CEMENT INDUSTRY GRUPO 5 PILAR DELICADO HERRERAS REBECA DIEZ MORALES
Prague Plant Data Kilns 2 x 1,300 tpd clinker  Vertical Coal Mill 15 tph  Cement Mills 3 x 100 tph + 1 x 30 tph  Own Quarries for Marl, Limestone.
Practical use of newly developed BAT conclusions Valts Vilnītis.
Grupowa Oczyszczalnia Ścieków Łódzkiej Aglomeracji Miejskiej Fot: U. Czapla Practical aspects of compliance with the Integrated Permit requirements based.
IPPC IN MINING AND METALLURGY IN THE REPUBLIC OF MACEDONIA Bosko Nikov
Urban Redevelopment and Air Quality in Fushun, PRC Simon Eggleston EU-China Liaoning Integrated Environmental Programme.
BAT as a main tool for minimisation of the negative impact of industrial activities Aivi Sissa Tallinn – Estonia 27 – 28 March 2008.
SATI TEXTILE GROUP IPPC IMPLEMENTATION 23 March 2012.
Workshop, 12/3/2004 Banska Bystrica – SLOVAC REPUBLIC “INTEGRATED LICENCE PROCEDURE (Greek case)” Katerina Iakovidou-Anastasiadou Hellenic Ministry for.
Current state on Harmonisation and Implementation/Enforcement of Environmental Legislation - Industrial Pollution Control in SLOVENIA Barbara Bernard Ministry.
BULGARIAN APPROACH TO THE BAT IN THE IPPC PERMITTING BOYKO MALINOV MINISTRY OF ENVIRONMENT AND WATER BULGARIA.
Ministry of Waters and Environmental Protection, ROMANIA 1 BERCEN 1 st Exchange program – November 2002 Croatia PROBLEMS AND SOLUTIONS IN COOPERATION.
ECENA First Plenary Meeting January, 2006 Zagreb, Republic of Croatia Forthcoming obligation related to implementation and enforcement of EU legislation.
Introduction of international standards in energy sector CF “Centre of sustainable production and consumption” Almaty, July 4-6 Safargaleyeva Guzaliya.
Joint to promote our capacities Federación Interamericana del Cemento Getting the Numbers Right A reference database for the cement.
Slovak Environmental Inspectorate Procedure of issuing the permits in the Slovak Republic.
Energy Efficiency in IPPC Installations, Wienna Oct/2004 Petr Honskus (SPF Group) Chairman of EE TWG CR Vladimíra Henelová, Monika Přibylová Members.
IPPC Amcor Flexibles Reflex - Facility B. IPPC – AFR_B The Facility was qualified as an installation for surface treatment of products using organic solvents,
Overview of Integrated Solid Waste Management (ISWM) Presentation made at the European Commission 7 th Framework Programme on Capacity Building Workshop.
© 2012 Delmar, Cengage Learning Chapter 12 Administrative Controls.
Implementing legislation for Integrated Permitting Monika Pribylova 1 October 2013 года Air Quality Governance in the ENPI East Countries.
ENVIRONMENTAL PERMITTING 1 Environmental Law. Environmental Permitting 2 Environmental Permitting (England and Wales) Regulations 2007 introduced a new.
Legislation in the EU and the impact on existing plant Lesley Sloss FRSC FIEnvSci Principal Environmental Consultant
Air Quality Governance in the ENPI East Countries Capacity building for decision makers for small businesses regulation Monika P ř ibylová.
Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 MONITORING Mr. Jan Prášek IPPC Agency.
1 Short overview of the implementation of IPPC, LCP, Seveso II, Waste Landfill and Incineration directives Short overview of the implementation of IPPC,
The IED/ELVs as seen through the Eyes of a User of Combustion Plant Dr Tim Rotheray.
1 Kosova/o ECENA 3 rd Plenary meeting September 18-19, 2008 Istanbul, Turkey.
Ministry for Ecology, Energy, Sustainable Development and Sea in charge of Green Technologies and Climate Negotiations
ENVIRONMENTAL MANAGEMENT REQUIREMENTS. ISO GOU has obtained certification for ISO 14001:2004 All contractors to be ISO compliant.
21 October Shpresa BANJA. R.E.A. Elbasan,Albania The existing quality measurement systems and progress reporting practices In Albania Shpresa BANJA.
Integrated permitting and inspections
MONITORING Mr. Jan Prášek IPPC Agency.
Chapter 12 Administrative Controls
BAT - BREF Their scope Rob Kramers Senior advisor InfoMil.
Health and Safety Policy
INTEGRATED PERMITTING PROCEDURE IN THE CZECH REPUBLIC
1996, 190, , companies ,000+ Established in With two central buildings and one warehouse facility in 1996 Established in 1996,
INTEGRATED PERMITTING IPPC DIRECTIVE: BEST PRACTICE
Quality, Occupational Health and Safety, Environmental Management and Energy Management System Certified systems Siemens Electric Machines s.r.o. has implemented,
National Laboratory Association
Indocement’s CDM Project
2018 OUR ENVIRONMENTAL PERFORMANCE Alexandria Portland
2017 OUR ENVIRONMENTAL PERFORMANCE Alexandria Portland
Environmental Aspects & Impacts
Aleksandra Antonowicz Green Federation GAJA/CCB
2017 OUR ENVIRONMENTAL PERFORMANCE Alexandria Portland
Project proposal for ISO 14001:2004 implementation
2018 OUR ENVIRONMENTAL PERFORMANCE Alexandria Portland
Nuclear Emergency Planning Chinese Experience
Beni Suef Cement Company ”BSCC”
Chapter 12 Administrative Controls
Beni Suef Cement Company ”BSCC”
2018 OUR ENVIRONMENTAL PERFORMANCE Alexandria Portland
Project proposal for ISO 14001:2015 implementation
Beni Suef Cement Company ”BSCC”
Beni Suef Cement Company ”BSCC”
Beni Suef Cement Company ”BSCC”
EU Food Safety Requirements: - Hygiene of Foodstuffs -
Whose Job Is It? Responsibility for Laboratory Safety and Security
Beni Suef Cement Company ”BSCC”
Beni Suef Cement Company ”BSCC”
2019 OUR ENVIRONMENTAL PERFORMANCE Alexandria Portland
Presentation transcript:

USJE Integrated Environmental Permit Application Bosko Nikov bosko.nikov@mt.net.mk

USJE Integrated Environmental Permit Application The Choice Willingness Location Already achieved results Human resources

USJE Integrated Environmental Permit Application The Company PRESENTLY: 574 Employees: Established 1955 1968 Kiln #3 Products: 1970 Kiln #4 Clinker Cement Insulation material RMC 1980 Major reconstruction 1998 TITAN TAKES OVER

USJE Integrated Environmental Permit Application Location

USJE Integrated Environmental Permit Application Operation Dry process Cyclone preheater No precalciner Fabric filters

USJE Integrated Environmental Permit Application Present Emissions Dust (TPM) Point sources 16 mg/Nm3 Fugitive (incl. Quarrying and transport) 0.198 kg/t Point sources 73 g/t SO2 835 mg/Nm3 NOx Point sources

USJE Integrated Environmental Permit Application Quality Management ISO 9000/2000 Environmental Management System Preparations for ISO 14001 Emissions Monitoring System: Centralized and computerized data acquisition and reporting

Emergency Response Plan General Issues (Reputation/image) Operational (Equipment, health and safety, security, human resources) Finantial Sources/reasons for emergency Preventiov/response Accidents reported

USJE Integrated Environmental Permit Application Integrated permit Stright the way or via an adjustment (compliance) plan? Gap between the current practice and BAT Investments required Financial burden Time required Technical viability

USJE Integrated Environmental Permit Application Activities: Not addopted yet Law on Environment Waiting to be issued Ordinance on IPPC Application form Main company’s activity

USJE Integrated Environmental Permit Application Activities completed: Collecting data on raw materials, energy and auxiliary materials Emission measurements carried out by authorized laboratories Public communication established

USJE Integrated Environmental Permit Application Comparison with BAT Indicator BAT USJE Nox (mg/m3) 200-500 835 SO2 (mg/m3) 200-400 68 Dust (mg/m3) 20-30 16 Energy use (MJ/t) 3000 3700 Electricity (kWh/t cement) 90-130 99

USJE Integrated Environmental Permit Application Comparison with BAT Raw materials preparing Improvement required Products handling Improvement required Process optimisation Required Monitoring Satisfactory EMS On the way Emergency response Modifications required

USJE Integrated Environmental Permit Application Conclusion Usje cement plant is seriously being prepared for submitting the application form for integrated permit In order to reduce the financial burden they will rather apply for adjustment permit as soon as the new Law on the environment comes into force