© 2010 Invensys. All Rights Reserved. The names, logos, and taglines identifying the products and services of Invensys are proprietary marks of Invensys.

Slides:



Advertisements
Similar presentations
Advanced Piloting Cruise Plot.
Advertisements

Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 1 Embedded Computing.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
By Rick Clements Software Testing 101 By Rick Clements
1 Introducing the Specifications of the Metro Ethernet Forum MEF 19 Abstract Test Suite for UNI Type 1 February 2008.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions
2010 fotografiert von Jürgen Roßberg © Fr 1 Sa 2 So 3 Mo 4 Di 5 Mi 6 Do 7 Fr 8 Sa 9 So 10 Mo 11 Di 12 Mi 13 Do 14 Fr 15 Sa 16 So 17 Mo 18 Di 19.
1 Implementing Internet Web Sites in Counseling and Career Development James P. Sampson, Jr. Florida State University Copyright 2003 by James P. Sampson,
Introduction Lesson 1 Microsoft Office 2010 and the Internet
© 2009 IBM Corporation iEA16 Defining and Aligning Requirements using System Architect and DOORs Paul W. Johnson CEO / President Pragmatica Innovations.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Non-OEM Gas Turbine Controls Replacement
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S.A.F. 1 Commodity Councils 101 NAME (S) SAF/AQCDATE.
Selecting an Advanced Energy Management System May 2007 Chris Greenwell – Director Energy Markets Scott Muench - Manager Technical Sales © 2007 Tridium,
Chapter 5 – Enterprise Analysis
DOROTHY Design Of customeR dRiven shOes and multi-siTe factorY Product and Production Configuration Method (PPCM) ICE 2009 IMS Workshops Dorothy Parallel.
Introduction The accompanying notes to the slides form a guideline to producing successful presentations. You may use this file as a ‘design template’
Information Systems Today: Managing in the Digital World
Chapter 1: Introduction to Scaling Networks
NetSight Console for MESH Networks:
Functional Workshop / Training Part 2 Pick Lists
Strategic Meetings Management 101
© Paradigm Publishing, Inc Access 2010 Level 1 Unit 1Creating Tables and Queries Chapter 2Creating Relationships between Tables.
R12 Assets A Look Inside SM. Copyright © 2008 Chi-Star Technology SM -2- High-Level Overview R12 Setups –Subledger Accounting –ADI Templates –XML Reports.
Chapter 11: The X Window System Guide To UNIX Using Linux Third Edition.
VOORBLAD.
15. Oktober Oktober Oktober 2012.
Benchmark Series Microsoft Excel 2013 Level 2
Target Costing If you cannot find the time to do it right, how will you find the time to do it over?
©2007 First Wave Consulting, LLC A better way to do business. Period This is definitely NOT your father’s standard operating procedure.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
© 2012 National Heart Foundation of Australia. Slide 2.
1 © 2004, Cisco Systems, Inc. All rights reserved. CCNA 1 v3.1 Module 6 Ethernet Fundamentals.
April 2003 ONLINE SERVICE DELIVERY Presentation. 2 What is Online Service Delivery? Vision The current vision of the Online Service Delivery program is.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Implementation Architecture
CA's Management Database (MDB): The EITM Foundation -WO108SN.
Pasewark & Pasewark Microsoft Office XP: Introductory Course 1 INTRODUCTORY MICROSOFT WORD Lesson 8 – Increasing Efficiency Using Word.
25 seconds left…...
AMCA Consultant Process. 2 What do you do?  IPD? (Integrated Project Delivery) 
Januar MDMDFSSMDMDFSSS
Analyzing Genes and Genomes
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
©2008 Prentice Hall Business Publishing, Auditing 12/e, Arens/Beasley/Elder The Impact of Information Technology on the Audit Process Chapter 12.
12 January 2009SDS batch generation, distribution and web interface 1 ExESS IT tool for SDS batch generation, distribution and web interface ExESS IT tool.
Connecting LANs, Backbone Networks, and Virtual LANs
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Chapter 13 The Data Warehouse
Energy Generation in Mitochondria and Chlorplasts
By Rasmussen College. 1. What majors or programs do you offer? 2. What is the average length of your programs? 3. What percentage of your students graduate?
CpSc 3220 Designing a Database
Most Used SPI Modules Instrument Index Module Instrument Spec Module
© 2004 Visible Systems Corporation. All rights reserved. 1 (800) 6VISIBLE Holistic View of the Enterprise Business Development Operations.
Slide 1. © 2012 Invensys. All Rights Reserved. The names, logos, and taglines identifying the products and services of Invensys are proprietary marks.
Slide 1. © 2012 Invensys. All Rights Reserved. The names, logos, and taglines identifying the products and services of Invensys are proprietary marks.
Presentation transcript:

© 2010 Invensys. All Rights Reserved. The names, logos, and taglines identifying the products and services of Invensys are proprietary marks of Invensys or its subsidiaries. All third party trademarks and service marks are the proprietary marks of their respective owners. © Invensys 2011Invensys proprietary & confidentialSlide 2 OXAL121 - Intelligent Engineering A Practical Way to Reduce Project Risk and Deliver Faster with Better Quality Joe Lindley Keith Perkins Global Engineering Management November 2011

Slide 3 Invensys Enterprise Control Offerings Manufacturing / Production Operations Corporate Integration and Collaboration Platform Automation Invensys and Third Party Software Applications Invensys and Third Party Enterprise Control System IT Platform Corporate Systems

Slide 4 Integration & Collaboration Platform Enterprise Integration Workflow Open Device Integration Web Portal Application Toolkit Historian Third-Party Offerings Software Applications Execution Manufacturing Execution Systems Batch Enterprise Asset Management Mobile Workforce Management Performance Enterprise Manufacturing Intelligence Performance Measurement and Reporting VisualizationQuality Asset Performance Optimization Operator Training Design Advanced Process Control Simulation / Optimization Control DCSPACSCADAHMI Safety Safety Instrumented Systems General Purpose Safety Turbomachinery Control Measurement & Instrumentation Controllers Recorders Automation Software Applications Where The Offerings We Will Discuss Fit Within The InFusion Enterprise Control System

Slide 5 Pillars of Operational Excellence and Focus of This Discussion Level 3 (Multi-plant/Multi-site) Level 2 (Plant Floor/Area) Level 1 (Resource/Asset) OperationalExcellence Environment And Safety Control People Asset

Slide 6 Intelligent Engineering The Problem The Invensys Approach To Project Execution

Slide 7 What clients have been telling us Time to market – need to be online faster with reduced risk and minimum cost Automation system requirements mature late in the project lifecycle Design validation occurs too late in the project lifecycle Managing change is an issue Global engineering workforce is required with local content Systems have become more inter-dependant and complex to integrate Multiple groups are required; internal, vendor, external We have a shrinking resource pool Need to mitigate human errors Supplier Provided Automation Services Worldwide Outlook, 2009

Slide 8 The Engineering Problem Engineering Manual Translation Bottom drawer tools

Slide 9 Invensys Response Reduce risk of schedule extension due to changes by capturing knowledge and using automation Drive consistent global execution using automated workflow and global standards Integrate Client Design tools including SmartPlant Instrumentation & P&IDs into process Provide tools to help clients and EPCs capture requirements Minimize manual activities by auto-generation of automation system configuration Provide capability to validate process design earlier by providing auto-generation of plant model and instrument validation Provide operator familiarization early by auto-generating plant models

Slide 10 Our Approach Define Global Standards Integrate Plant Engineering Tools Provide tools to: – Manage Workflow – Capture Knowledge and Requirements – Automate Workflow Test early and often Divide project into separate Unit projects Use Plant Simulation from the start Consistent use of best practice Make better use of existing data Reduce manual errors Find problems early Experience whole process early More robust testing

Slide 11 Bridging the Gap Intelligent Engineering Tools Intelligent Engineering Tools Invensys Product Configurators Invensys Product Configurators Plant Design Tools Plant Design Tools

Slide 12 Project Activities Lets consider an Integrated Control and Safety System with an Operator Training Simulator Project Framework Project Standards System Architecture Cabinet Design Equipment Layout Unit Model C&S Modules Tie-back Simulation Displays & Applications Engineer Cabinets Update with RFC Data Unit Tests Integrated Tests Pre- Commissioning

Slide 13 The Project Framework Consistent process execution Enable collaboration between engineering teams Efficient delivery and deployment of standards, tools and templates Ensure consistent use of best practice Project Framework Project Standards System Architecture Cabinet Design Equipment Layout Unit Model C&S Modules Tie-back Simulation Displays & Applications Engineer Cabinets Update with RFC Data Unit Tests Integrated Tests Pre- Commissioning

Slide 14 Define Project Standards SmartPlant P&ID SmartPlant Instrumentation Receive sample instrument data (all loop types) Build templates for each loop type Build rules for each template Build tie-back simulation for each template Build sample plant model FAT templates, rules and simulation Ensure consistent use of best practice Project Framework Project Standards System Architecture Cabinet Design Equipment Layout Unit Model C&S Modules Tie-back Simulation Displays & Applications Engineer Cabinets Update with RFC Data Unit Tests Integrated Tests Pre- Commissioning

Slide 15 Define System Architecture Define physical locations and networks connecting locations Define equipment at each location Project Framework Project Standards System Architecture Cabinet Design Equipment Layout Unit Model C&S Modules Tie-back Simulation Displays & Applications Engineer Cabinets Update with RFC Data Unit Tests Integrated Tests Pre- Commissioning

Slide 16 Define Cabinet and Console Designs Select from a range of standard system and marshalling cabinets Select from a library of signal wiring loop typicals Project Framework Project Standards System Architecture Cabinet Design Equipment Layout Unit Model C&S Modules Tie-back Simulation Displays & Applications Engineer Cabinets Update with RFC Data Unit Tests Integrated Tests Pre- Commissioning

Slide 17 For each Unit Define Equipment Layout Define cabinet and console locations Calculate heat generation and power requirements Receive preliminary unit instrument data (all loops) Project Framework Project Standards System Architecture Cabinet Design Equipment Layout Unit Model C&S Modules Tie-back Simulation Displays & Applications Engineer Cabinets Update with RFC Data Unit Tests Integrated Tests Pre- Commissioning

Slide 18 Build Initial Unit Model Project Framework Project Standards System Architecture Cabinet Design Equipment Layout Unit Model C&S Modules Tie-back Simulation Displays & Applications Engineer Cabinets Update with RFC Data Unit Tests Integrated Tests Pre- Commissioning

Slide 19 Project Framework Project Standards System Architecture Cabinet Design Equipment Layout Unit Model C&S Modules Tie-back Simulation Displays & Applications Engineer Cabinets Update with RFC Data Unit Tests Integrated Tests Pre- Commissioning Build Initial Unit Model Validate plant model to provide a sound basis for testing

Slide 20 Build Unit Control and Safety Modules Preliminary Instrument Data Eliminate manual errors Project Framework Project Standards System Architecture Cabinet Design Equipment Layout Unit Model C&S Modules Tie-back Simulation Displays & Applications Engineer Cabinets Update with RFC Data Unit Tests Integrated Tests Pre- Commissioning

Slide 21 Project Framework Project Standards System Architecture Cabinet Design Equipment Layout Unit Model C&S Modules Tie-back Simulation Displays & Applications Engineer Cabinets Update with RFC Data Unit Tests Integrated Tests Pre- Commissioning Build Unit Tie-back Simulation Reduce manual errors

Slide 22 Develop Unit Displays and Control and Safety Applications Cause & Effects Editor Import Instrument Index Drag & drop Causes and Effects Define device types and allowed parameters Define function blocks Logic emulation Change tracking Report package Find problems early and reduce manual errors Project Framework Project Standards System Architecture Cabinet Design Equipment Layout Unit Model C&S Modules Tie-back Simulation Displays & Applications Engineer Cabinets Update with RFC Data Unit Tests Integrated Tests Pre- Commissioning

Slide 23 Develop Unit Displays and Control and Safety Applications Reduce manual errors Project Framework Project Standards System Architecture Cabinet Design Equipment Layout Unit Model C&S Modules Tie-back Simulation Displays & Applications Engineer Cabinets Update with RFC Data Unit Tests Integrated Tests Pre- Commissioning

Slide 24 Project Framework Project Standards System Architecture Cabinet Design Equipment Layout Unit Model C&S Modules Tie-back Simulation Displays & Applications Engineer Cabinets Update with RFC Data Unit Tests Integrated Tests Pre- Commissioning Engineer Unit Marshalling and System Cabinets Ensure consistent use of best practice

Slide 25 Update Unit with Released for Construction Data Receive RFC instrument data including all parameters Assess impact of added/deleted/changed loops Regenerate control/safety module layer Update applications and plant model Gives client more time to mature data Project Framework Project Standards System Architecture Cabinet Design Equipment Layout Unit Model C&S Modules Tie-back Simulation Displays & Applications Engineer Cabinets Update with RFC Data Unit Tests Integrated Tests Pre- Commissioning

Slide 26 Unit Verification Tests Perform acceptance tests on unit hardware Perform acceptance test on control/safety functionality Deliver cabinets to site for field wiring connections and loop tests More robust testing Project Framework Project Standards System Architecture Cabinet Design Equipment Layout Unit Model C&S Modules Tie-back Simulation Displays & Applications Engineer Cabinets Update with RFC Data Unit Tests Integrated Tests Pre- Commissioning

Slide 27 Integrated Acceptance Tests Unit A Unit B Unit C More robust testing Project Framework Project Standards System Architecture Cabinet Design Equipment Layout Unit Model C&S Modules Tie-back Simulation Displays & Applications Engineer Cabinets Update with RFC Data Unit Tests Integrated Tests Pre- Commissioning

Slide 28 Pre-Commissioning Unit start-up Equipment control Unit shutdown Tanker loading/unloading Material movements …. Find problems early and at less cost Project Framework Project Standards System Architecture Cabinet Design Equipment Layout Unit Model C&S Modules Tie-back Simulation Displays & Applications Engineer Cabinets Update with RFC Data Unit Tests Integrated Tests Pre- Commissioning

Slide 29 Projects using Engineering Workbench

Slide 30 On Time, On Budget

Slide 31 Intelligent Engineering

Slide 32 Question Time