Gainesville ATMS: A Regional Success! October 29, 2012 Matthew Weisman, PE ITS Operations Engineer - City of Gainesville, Fl 2012 Transpo – Bonita Springs.

Slides:



Advertisements
Similar presentations
County of Fairfax, Virginia Board Transportation Committee Updates on Alternatives for Improving Roadway Services in Fairfax County Discussion of Converting.
Advertisements

Back to the Future? Electrical/Lighting Contracts Ted Swansegar.
Eric Graves, P.E. City Traffic Engineer Alpharetta, Georgia
Traffic Signal Maintenance – Best Practices
1. Green Lights Program Objectives Improve Quality of Synchronization in a Short Timeframe Noticeable Improvements to Motorists Appropriate Allocation.
Piedmont Regional Voice over IP Pilot Project Law Enforcement Information Management Conference Greensboro, N. C. May 21-24, 2007 Major Dean Hairston,
Elements of Effective Sign Maintenance
Florida’s Turnpike Enterprise ITS Project Update
FDOT District 3 ITS Project Update Chad Williams, P.E. District 3 ITS Engineer.
FDOT District 6 ITS Project Update Manuel Fontan, E.I. ITS Project Manager.
FDOT District Two: I-75 FOG AND SMOKE DETECTION PROJECT
Building a Wide Area Public Safety Network Technologies Used, Lessons Learned EMS Summit October 2, 2003 William E. Ott, MS, Paramedic.
ITS Application of advanced sensor, computer, electronics, and communications technologies and management strategies in an integrated manner providing.
WASHINGTON DC NETWORK TECHNOLOGY OVERVIEW EDUCAUSE POLICY PANEL APRIL 26, 2006 CHRIS PEABODY DEPUTY CTO: NETWORK AND COMMUNICATION SERVICES Government.
Presented by: SAGE KAMIYA, P.E., PTOE
Automated Enforcement at Rail Crossings in Grand Prairie, Texas Sgt. Eric Hansen Grand Prairie Police Department Traffic Section.
KC REGIONAL TRAFFIC SIGNAL COORDINATION. Agenda  National Perspective  OGL Video Overview  Mid – America Regional Council  Program Elements  What.
Consolidation Commission - Transportation Sub-Committee City of Orlando Signalization Presentation September 8, 2005.
Wireless Communications in ITS.  Existing Applications  Interconnect  Remote Communications to Field  Original Future Concept  Plans Can Change.
75 Express Lanes Segments A&B Construction From NW 170 Street to South of Miramar Parkway Community Meeting Presentation Tuesday April 28, 2015.
Gainesville Area Traffic Management System. Traffic Management System  In 1984, the original Traffic Signal Master Plan was developed for the Gainesville.
General Overview of the Functions and Responsibilities Traffic Engineering & Permits Division.
Transportation Research Board 2004 Annual Meeting Adaptive Signal Control Workshop Session 2: Field Experience January 11, 2004.
San Jose Traffic Signal Communications and Synchronization Project Presented by Ho Nguyen City of San Jose, Department of Transportation May 12, 2009.
Florida Department of Transportation District 4 TSM&O Program Advanced Transportation Management System (ATMS) Installation in South Broward County ATMS.
Mark Wandall Traffic Safety Act Traffic Infraction Detector Red-Light-Running-Camera Mark Wilson, P.E. State Traffic Operations Engineer.
May 22, 2003 ITSA Executive Networking Session #63 Hidden Text.
Next Generation Traffic Management Centers Brian L. Smith and Robert Kluger Webinar series presented by MAUTC, University of Virginia and VDOT.
Illinois Department of Transportation Emergency Management I-74 Reconstruction Project Peoria, Illinois ITS Midwest Annual Meeting February 7, 2006.
The Dutchess County Fair Traffic Plan Talking Operations Web Seminar April 26, 2006.
Conxxus, LLC HIGH-SPEED BROADBAND Power By WE ARE BRINGING HIGH SPEED TO OUR ENTIRE COOPERATIVE SERVICE AREA.
Columbus Computerized Traffic Signal System Eagan L. Foster, P.E. Transportation Division Columbus Public Service Department Where have we been? Where.
FDOT District 1 ITS Project Update Katherine Duvall ITS Project Manager.
Moving Towards A Gigabit State May 4, 2015 Broadband Inventories.
1 Dixie ITS Architecture Study Section ? Utah ITS History.
TSM&O FLORIDA’S STATEWIDE IMPLEMENTATION Elizabeth Birriel, PEElizabeth Birriel, PE Florida Department of TransportationFlorida Department of TransportationTranspo2012.
Traffic Engineering Division Traffic Operations Traffic Administration Construction and maintenance of traffic control devices. Engineering design Signal.
Jump Starting ITS Deployment in Los Angeles County using Wireless Communications Lessons Learned.
THE I-75 DAYTON RECONSTRUCTION
“SIComP” Broward County Communications Upgrade Florida Department of Transportation District 4 November 21, 2005.
Georgia’s Regional Traffic Operations Program Christopher Barrow, E.I.T. Traffic Engineer II.
ORANGE COUNTY TRAFFIC MANAGEMENT SYSTEM FEBRUARY 13, 2007.
2015 Traffic Signals 101 Topic 2 Agreements. Office of Traffic, Safety, and Technology Agreements Signal Agreements An Agreement is a contract between.
Orange County Traffic Signal System Consolidation of Services Study Commission Meeting September 8, 2005.
Success with Miami-Dade County’s ATMS Upgrade Success with EMBEDDED INTEGRATORS Presented at: ITS America Annual Meeting Houston, Texas May 4th, 2010 by.
Illinois Century Network Illinois Broadband Opportunity Partnership – East Central Project.
ZOM A request for a minor amendment to the existing South Pointe PD (Planned Development) 110 acres West Newberry Road.
Bay County’s Intelligent Transportation System (ITS) Keith C. Bryant, P.E., PTOE Public Works Director Bay County, FL 2015 TRANSPORTATION SYMPOSIUM November.
Roadway Median Tree Program Public Works Department July 13, 2015.
ARCHITECTURE ENGINEERING COMMUNICATIONS TECHNOLOGY AVIATION | CIVIL | CONSTRUCTION SERVICES | DATA SYSTEMS | ENVIRONMENTAL FACILITIES ENGINEERING | GEOSPATIAL.
Traffic Management System Status Update February, 2008.
Update on the Escambia/Santa Rosa Regional Advanced Traffic Management System (ATMS) Feasibility and Implementation Plan Ben Faust, P.E. Advanced Traffic.
2010 Regional Intelligent Transportation Systems Plan: 2015 Progress Report on Implementation.
Madison Avenue Reconstruction Department of Planning and Development.
Larry Baebler Jonathan Brown, P.E. April 20, 2015
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2013/14 – 2017/18 Presentation to Board of County.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2015 – 2019 Presentation to Board of County.
SMITHVILLE R-II SCHOOL DISTRICT Tradition of Excellence The Power of One … One Community … One Future! November 4, 2014 SMITHVILLE R-II SCHOOL DISTRICT.
A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment.
Phoenix Regional ITS Fiber Optic Backbone. PURPOSES  Improve agency operations by establishing a shared, regional, telecommunications network.  Create.
Mainstream Fiber Networks partnership Proposal
Office of Transit TIGER VII (T2O) Grant
Traffic Management System Real Time Motorist Information
Project Overview – Phase 1
Intelligent Transportation Systems
2010 Regional Intelligent Transportation Systems Plan: 2017 Progress Report on Implementation The Florida-Alabama, Okaloosa-Walton, and Bay County Transportation.
Traffic Signal Performance Measures in a Small Urban Area
Transportation Research Board 2004 Annual Meeting
Meeting of the Hillsborough MPO Board December 5, 2017
ITE Midwestern District Conference June 20, 2017
Presentation transcript:

Gainesville ATMS: A Regional Success! October 29, 2012 Matthew Weisman, PE ITS Operations Engineer - City of Gainesville, Fl 2012 Transpo – Bonita Springs

Outline What is the City responsible for? How we are/were funded Latest Regional Incentives Interstate 75 Deployment Outside City Limits District 2 ITS District 5 ITS

Traffic Management System The City of Gainesville maintains Traffic signals School beacons Flashing beacons ITS Includes Unincorporated Alachua County University of Florida Smaller Cities in Alachua County

Traffic Management System

Funding Partnerships Capital Funding Methodology: City, County, MTPO, FDOT and University Staff worked together to develop a funding methodology for this project. Maintenance Funding: Inter-local agreements with other County agencies FDOT D2

Funding Commitments to Date Agency City County U.F. FDOT Fair Share 25.1% ($ 3.6 mil) 22.7% ($ 3.3 mil) 3.9% + $ 3.2 mil = ($ 3.8 mil) 50.0% ($ 9.1 mil) Committed $ 5.0 mil $ 2.2 mil $ 3.8 mil $ 9.1 mil

Phasing Costs Phase I Phase II Phase III Phase IV Total $ 7.5 million $ 5.8 million $ 4.1 million $ 820,000 $ 18.2 million

Traffic Management System

Original ATMS Scope New cabinets and controllers at EVERY intersection Communications backbone PTZ Cameras Construction (installing cabinets etc…) Consulting services Software (ATMS software, Cameras, signal timing…) TMC Building Equipment for the TMC Emergency vehicle preemption/priority

Interstate 75 Original Scope Lacked I-75: Original intention of the $18.2 M was for Gainesvilles arterial street network and not the interstate. However, not having access to the interstate often impeded our ability to properly manage arterials during I-75 incidents.

Interstate 75 Local Agency VS FDOT: Initially, CoG requested permission from FDOT to permit traffic camera poles near the main interchanges in Gainesville Request was politely denied. FDOT is the only agency that can permit on the interstate.

Interstate 75 Local Agency VS FDOT: Begun petitioning District IIs ITS office for interstate cameras shortly afterwards.

Interstate 75 THE DESIGN! Original plan attempted to use existing cantilever and light pole structures on the interstate to keep costs down.

Interstate 75 THE DESIGN! CoG conducted its own site surveys to confirm wireless connectivity and good visuals.

Interstate 75 THE DESIGN! Included cameras from the south end of Paynes Prairie to Alachua, Fl

Interstate 75 THE DESIGN! Roughly 20 miles from first camera in the south of the Prairie to the Alachua US441 interchange

Morning of January 29, 2012

Interstate 75

Spring into action! FDOT agreed to pay their push button contractor to plant ten new poles on the interstate. FDOT also agreed to start supplying replacement back up ITS equipment to CoG. CoG was responsible for everything else. As no other infrastructure was going on the interstate, these 10 camera poles had to communicate over wireless and use solar power.

Interstate 75 Spring into action! Sign cantilever idea went bust. Photocells brought on too many problems. Post January 29 th design kept two cantilever structures, Alachua (US441) and Williston Rd (SR121) interchanges.

Interstate 75 Spring into action! In order to use existing cantilevers, FDOT policy was waived and FDOT issued CoG permits to construct conduit to these existing signs.

Interstate 75 FDOT plants poles 67 (or 55 tall) poles

Interstate 75 Spring into action! Solar system was designed to our specific equipment

Interstate 75 Spring into action! PoE radios were used to shoot back to our fiber.

Interstate 75 Wireless on the Prairie PoE radios were used to shoot back to our fiber.

Interstate 75 Finished Product

Interstate 75 Final Cost $79,000 FDOT $160,000 CoG TMS Total = $240,000

Outer County

Roof of the Seagle Building – Better than a tower!!

Outer County Wireless verification … aka … job perks

Outer County More wireless verification … aka … more job perks

Outer County More wireless verification … aka … more job perks

Alachua & High Springs FDOT NW 39 th Ave (SR222)

Give up yet?

Connection to D2 Gainesville Traffic Operations has recently become a member of the Florida Lambda Rail! This will allow a 1GIGE connection to FDOT D2 Jacksonville with possibility of expanding to other FDOT districts.

Expansion to D5 CoG has replaced an old I-Florida PTZ camera in Marion County. Exit 368 is the last NB exit before entering Alachua County Communication will be maintained via a cellular modem over the Verizon network. Verizon provides the City with a static IP. The modem uses an embedded VPN to connect into our network.

Good News!

Webpage gac-smartraffic.com

Contact