NEF Negotiation forms IT tool to support Negotiation (Participant Portal) http://ec.europa.eu/research/participants/portal Call FP7-ENV-2013-WATER-INNO-DEMO.

Slides:



Advertisements
Similar presentations
Preparing EU-fin for periodic reporting Interactive user manual for coordinators.
Advertisements

Petr Cerveny Unit Administration and Finance 31/5/2010 Major FP7 Negotiation Issues.
FP7 & CIP New ways of interacting 23/06/ Ways of interacting - Topics Part 1 :The Research Participant Portal (PP) –Roles and Access Management.
1 16/02/2014 The Negotiation Process: Negotiation timeline Participant Portal NEF – Negotiation facility Anita Kucharska Administration and Finance Unit.
Identity and Access Management (IAM). Research Participant Portal Offers external stakeholders a unique entry point for the interactions with the European.
FP7 Grant Agreement Amendments: basic principles and processing
Using EU-fin Interactive user manual for coordinators (Using EU-fin to the fullest)
1 FP7SESAMFORCE Reporting Tools Access through the Participant Portal Reporting Tools Access.
Electronic-only submission of FP7 financial statements (forms C) NEXT.
FP6/FP-7 IT System 1 FORCE: WEB BASED EDITOR OF FORMS C FOR FP-6 AND FP-7.
H2020 Grant preparation and signature
European Commission DG for Fisheries and Maritime Affairs Research & scientific analysis SSP Kick-off meeting The 6 th Framework Programme
Financial viability check - new procedures
ACCEPT project Grant Agreement FP7-SSH-2009-A.
MT+ GUIDE FOR BENEFICIARIES. 1. GENERAL INTRODUCTION.
Validation of legal entities and financial capacity check
Research and Innovation Participant Portal Submission Service
KA2 – Cooperation for innovation and the exchange of good practices Capacity Building in the field of Higher Education (CBHE) Application and selection.
Validation of legal entities and financial capacity check Dr Sebastiano FUMERO Head of Unit Participant Validation and Support September 26, 2014 Horizon.
EFP7 Communication Office RTD M2 Research and Innovation Participant Portal Identity and Access Management (IAM)
Specific Programme Cooperation in FP7 - Proposal submission -
ESPON 2013 Programme Info Day on Calls and Partner Café Brussels, 10 May 2012 How to apply: Application Form and Eligibility A Decade of Territorial.
Call ref.: FP ACC-SSA-2 (10/2004) Contract Negotiation - Sofia - Bulgaria 10 February, Mrs Marina ZANCHI DG Research Directorate N International.
Amr Radwan Egypt RDIN focal point
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Overview of EuCARD-2.
The FP7 How to submit a project electronically AN INFORMATION POINT FOR FP7 IN PALESTINE: Training Seminar of experts Nicosia, Cyprus November.
Negotiations Maria Habicht Estonian Research Council January 30, 2013 Chisinau.
Reporting Guidelines (FP5) Karen Fabbri Scientific Officer Natural & Technological Hazards DG Research European Commission Brussels
Contract Negotiations in FP7 The basics Koos de Korte, Agentschap NL, March 2010.
Project Reporting for the EuCARD Integrating Activity Project Based on: - Provisions of the Grant Agreement (GA) and its annexes - FP7 Guide on Project.
Revised Identity and Access Management (IAM). Research Participant Portal Offers external stakeholders a unique entry point for the interactions with.
Validation of legal entities and financial capacity check
AIDA negotiation process AIDA NCP Meeting,
Detailed description of your H2020 project Description of the action (Annex 1) Estimated budget for the action (Annex 2) Ulrich Genschel European Commission.
EFP7 STRATEGY IT tools supporting beneficiaries and other external users 23/06/2010.
Validation of legal entities and financial capacity check Peter Härtwich European Commission Directorate-General Research & Innovation.
FP6 IT System 1 ELECTRONIC PROPOSAL SUBMISSION SYSTEM.
Detailed description of your H2020 project Description of the action (Annex 1) Estimated budget for the action (Annex 2) Ulrich Genschel European Commission.
Beneficiary data are imported from your proposal.
Negotiation of Proposals Dr. Evangelos Ouzounis Directorate C DG Information Society European Commission.
Mobility Tool+ 1. EU Survey Mobility Tool EPlusLink Beneficiary User Sign Grant Agreement Participant Manage Project Generation Participant Report Request.
Research and Innovation REPORTING and PAYMENT (in practice) v
HORIZON 2020 Amendments to the Grant Agreement. Consequences The amended provisions become an integral part of the GA All other provisions remain unchanged.
1. TEMPUS PROGRAMME PROJECT REPRESENTATIVES’ MEETING Brussels, March 2010 Management of the Grant Agreement.
Session 5 – online submission of applications Bruno Breviglieri, Natasha Jovicic.
2016 Annual Event ‘’H2020 NCPs Training’’ Minsk, March 2016 Project Management and Implementation IncoNet EaP is a project funded under the 7th European.
Policy Research and Innovation Research and Innovation European Commission Research DG-B7 FP7 Negotiation Process Not legally binding Diana TILOUCHE -
Consumers, Health, Agriculture and Food Executive Agency 3rd Health Programme The Electronic Submission System (JA 2015) Georgios MARGETIDIS.
Validation of beneficiaries REA.A1 - FP7 Support Katrien Steijleman 28 May 2013.
How to complete and submit a Final Report through Mobility Tool+ Technical guidelines Authentication, Completion and Submission 1 Antonia Gogaki IT Officer.
Coordinators' day on FP7 Project Negotiation Description Of Work Annex I Griet Van Caenegem DG CNECT R5 Programme Operations May 28, 2013.
How to complete and submit a Final Report through
Validation of legal entities and financial capacity check
ELECTRONIC PROPOSAL SUBMISSION SYSTEM
ERO Portal Overview & CFR Tool Training
Negotiations of Call FP7-ENV-2013-two-stage
Bringing Home the Bacon: Grant Writing Basics Unit 7 Grant Submission
“Environment (including climate change)” Theme
Research and Innovation Participant Portal Latest changes to the Participant Portal Olivier MARGANNE eFP7 Communication.
FP7 SCIENTIFIC NEGOTIATIONS Astrid Kaemena European Commission
REPORTING and PAYMENT (in practice)
FP7 SCIENTIFIC NEGOTIATIONS
Information session SCIENTIFIC NEGOTIATIONS Call FP7-ENV-2013-two-stage "Environment (including climate change)" Brussels 22/05/2013 José M. Jiménez.
Information session SCIENTIFIC & TECHNICAL NEGOTIATIONS Call FP7-ENV-2013-WATER-INNO-DEMO "Environment (including climate change)" Brussels 24/06/2013.
Andrea Tilche European Commission DG Research and Innovation Head of Unit « Climate change and natural hazards » 7 May Madou Auditorium Negotiations.
The Research and Innovation Participant Portal
Negotiations of Call FP7-ENV-2013-WATER-INNO-DEMO
CFR Enhancement Session
Grant Agreement Preparation
Validation of legal entities and financial viability check
Presentation transcript:

NEF Negotiation forms IT tool to support Negotiation (Participant Portal) http://ec.europa.eu/research/participants/portal Call FP7-ENV-2013-WATER-INNO-DEMO FP7 "Environment (including climate change)" Theme 24/06/2013

Front Office (Participant Portal) WORKFLOW External Internal Coordinator Experts Decision to retain Proposal Proposals evaluation & ranking Proposal submission SEP SEP Coordinator Negotiator Negotiate terms of the Proposal Negotiate terms of the Proposal Grant Agreement NEF Front Office (Participant Portal) NEF Back Office LEAR Register Organisation Data & receive PIC Validation Team Validation of Organisation’s Data URF (Participant Portal) PIC PDM

E-mail address: ec-research-it-helpdesk@ec.europa.eu Phone number: FP7 IT HELP DESK E-mail address: ec-research-it-helpdesk@ec.europa.eu Phone number: + 352 43 01 31 570

AGENDA NEF – General workflow NEF – via Participant portal * Access NEF * Check and complete the needed data: - Administrative & legal - Scientific - Financial * Submit the updated data to the Commission Q & A

NEF The NEGOTIATION process allows the exchange of information between the European Commission and the external Consortium NEF (Negotiation Forms) on the Participant Portal has to be used to collect information and complete the GPF (Grant Agreement Preparation forms) The Coordinator inserts administrative / scientific & financial information and prepares the DOW (Description of Work) comprising two parts, A & B NEF BACK OFFICE: (module used by the European Commission) NEF / Participant Portal: (module used by the external Coordinator & Beneficiaries)

link to Participant Portal NEF Workflow EU Officer Coordinator Beneficiaries NEF Back Office create a Negotiation session PARTICIPANT PORTAL  mail sent to Coordinator with link to Participant Portal Complete data Coordinator submits to the Commission marks the session as verified IF NOT OK IF OK

MAIL SENT TO COORDINATOR NEF Back Office EU Officer opens the Negotiation for a Project and creates a first Negotiation session MAIL SENT TO COORDINATOR

Email Mail sent to the Coordinator and to the Scientific/ Project Officer containing the link to NEF through the Participant Portal Upper part

The Coordinator / Beneficiaries access NEF via the Participant Portal The Coordinator / Beneficiaries access NEF via the Participant Portal to complete the GPF (Grant Preparation Forms) http://ec.europa.eu/research/participants/portal

xxxxxxx xxxxxxxxxx xxxxx xxxxxxxxxxxxxxxxxxxxxxxxxxx Participant Portal xxxxxxx xxxxxxxxxx xxxxx xxxxxxxxxxxxxxxxxxxxxxxxxxx

Main page Submit button only available for the Coordinator NEF Front Office Submit button only available for the Coordinator Main page

Information about the Project NEF Front Office Information about the Project

General Information

Reporting Periods Delete button Note: The project duration is automatically updated when it is changed in the General Information screen and vice versa Delete button

Primary Coordinator Contact The Project Officer in the Commission sets the Primary Coordinator Contact person by entering the correct ECAS Email address

Budget Overview Note: The results of the Budget Overview screen should match with the estimated eligible costs and Requested Contribution. The pdf A3.2 should match thus the A5 values

Information about the Coordinator the Beneficiaries Front Office Information about the Coordinator the Beneficiaries

Coordinator Legal Data (1) All the Organisation’s Legal Data shown in NEF is in Read Only. The only changeable field is the « Short name ».

Coordinator Legal Data (2)

Beneficiary Legal Data All the organisation’s Legal Data shown in NEF is in Read Only. The only changeable field is the « Short name ».

Organisation status and ICM status is in READ ONLY

Authorised Representatives

Contact Persons

Estimated eligible Costs

Coordinator Bank Account

Add a new Participant (1)

Add a new Participant (2) (1) (2) (3)

Add a Third Party (1) (2) (3) (4) (5)

Remove a Participant

Eligible Costs Special Clause 9 EU contribution : NO Note: By default it is flagged as « Yes »

Scientific Information NEF Front Office Scientific Information

Work Packages

Add the Work Packages (1) Upper part

Add the Work Packages (2) lower part

Add Titles of future Deliverables for a Work Package

Work Packages Upload Part B (PDF)

Financial Information NEF Front Office Financial Information

Budget Overview Hyperlink to Eligible Costs

The Coordinator submits the data to the Commission

Submit to the Commission Download PDF Submit to the Commission (3) (1) (2) Note:(2) Completion status should be ‘Finalized’ for all the Beneficiaries in order to submit the data. After submission by Coordinator, the session will expire, no link to « Access Negotiation » available !!!

Download PDF GPF Note: The forms A2.5. (Our Commitment), A2.6 (Data Protection and our role) and A4 have to be signed!

Download PDF Annex I (Part A – Part B)

Annex1-Description of Work Annex I. Description of work (DoW) The structure of Annex I (Description of Work) follows mostly the same basic layout as the proposal, comprising two parts, Part A and Part B. Part A (based on structured information) contains the cover page, the project summary, the list of participants and the budget breakdown as well as 8 work plan tables which provide details on the implementation of the project. The work plan tables (presenting the same set of information in different layouts) are produced by NEF on the basis of data collected in one web form related to each work package. Part B (the narrative part) is based on information from Part B of the proposal and has to be uploaded into NEF as a pdf document. To produce a printable version, NEF finally fuses the two parts into one complete Annex 1

IF all the data is OK, the EU Officer closes the Negotiation for the Proposal IF DATA NOT OK, The EU Officer creates a new negotiation session new mail to the Coordinator