Poor Man’s Fiber Network

Slides:



Advertisements
Similar presentations
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200.
Advertisements

$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500.
Background images courtesy of abc.com 1,000, , , ,000 64,000 32,000 16,000 8,000 4,000 2,000 1,
Welcome to Who Wants to be a Millionaire
Heartland Coast-to-Coast Corridor Study ___________________ Presented Sept. 11, 2007 Sanibel Harbour Resort Spa Heartland Coast-to-Coast Corridor Study.
$1 Million $500,000 $250,000 $125,000 $64,000 $32,000 $16,000 $8,000 $4,000 $2,000 $1,000 $500 $300 $200 $100 Welcome.
1 Nashville 3 March Michael Tague
1 Nia Sutton Becta Total Cost of Ownership of ICT in schools.
Name: Date: Read temperatures on a thermometer Independent / Some adult support / A lot of adult support
Jubail Industrial City A $45 Billion Super Project
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Operations Management Maintenance and Reliability Chapter 17
Fundamentals of Cost Management Chapter 10 Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin.
Chapter 3: Utilization and Volume. 26 Chartbook 2000 Community hospital acute care admissions declined 15 percent between 1980 and 1994 and then began.
1 Transport and Station Observations and Recommendations January 26, 2005 TOMA – Diesel Fuel Marketers Seminar Nashville, TN TRANSPORTATION OF ULSD MAP.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 15 second questions Numbers and number system Numbers and the number system, Measures and Shape.
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
Who Wants To Be A Millionaire?
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
Welcome to Who Wants to be a Millionaire
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
Welcome to Who Wants to be a Millionaire
Welcome to Who Wants to be a Millionaire
1 Copyright Copyright 2012.
Problem1; Admission Flow
Emerson in the Energy Sector Stephen C. Hassell President, Avocent 17 August 2012.
ACC 3200 Chapter 3: Process Costing Process Costing.
June Energy consumption in Korea 4 primary & final energy consumption CO 2 emissions LNG Nuclear Renewables, etc Oil Coal Energy Industrial.
Operations Management
Slides prepared by JOHN LOUCKS St. Edward’s University.
Operations Management
BREAKOUT SESSION 2 Smart Grid 2-B: Grid Integration – Essential Step for Optimization of Resources Integrating Intermittent Wind Generation into an Island.
J J EOPARDY Lets Get Ready To Play Some.... Solve One Step Equations Solve Two Step Equations Solve Other Equations Word Problems to Equations
Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 1 Strategic Capacity Management.
Introduction to Cost Behavior and Cost-Volume Relationships
Matjaž Pogačnik, MBA ENGAGE Donegal workshop Letterkenny, February 12 th 2013.
Mechanical & Electrical Golfers Society Annual Year End Awards Prysmian Cable Challenge.
Chapter 4 Estimating and Reducing Labor Costs
© 2009 Dominion August 5, 2009 Underground Transmission Lines at Dominion Virginia Power Update for the Joint Committee on Technology and Science Presented.
COST APPROACHES TO PRICING
Feeder Line Replacement Refresher Questar Gas Company Meeting with Utah PSC March 27, Questar Gas Company Docket No QGC Exhibit 1.10.
PRODUCTION AND OPERATIONS MANAGEMENT
Capacity Planning For Products and Services
Capacity and Constraint Management
Capacity and Constraint Management
Chapter 5 Capacity Planning For Products and Services
® Customer Meeting February 28, ® JulAugSeptOctNovDecJanFeb Discovery – Company answers over 800 data requests and performs technical conferences.
Copyright Oxford University Press 2011 Chapter 2 Engineering Costs and Cost Estimating.
$ TOTAL INCOME 100 Quick Start 4 Within 30 Days of Start Date.
Figure 1. PX Prices and Total ISO Load (May 15 - August 31, 2000) MW $/MWh.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
10 Year Old Topic 2 9 Year Old Topic 4 8 Year Old Topic 5 8 Year Old Topic 6 7 Year Old Topic 7 7 Year Old Topic 8 6 Year Old Topic 9 6 Year Old Topic.
Sets Sets © 2005 Richard A. Medeiros next Patterns.
Strategy Review Meeting Strategy Review Meeting
25 seconds left…...
Apprenticeship Grant for Employers of 16 to 24 year olds (AGE 16 to 24) Employer Update Presented by DMT Business Services.
Equal or Not. Equal or Not
Slippery Slope
Flexible Budgets and Performance Analysis
Hellgate Elementary K-8 into a K-12 School District: A Possibility? MCPS - Potential Bond Issue Facility Costs… November 19, 2014.
Fractions Simplify: 36/48 = 36/48 = ¾ 125/225 = 125/225 = 25/45 = 5/9
Fundamentals of Cost Analysis for Decision Making
Partial Products. Category 1 1 x 3-digit problems.
A SMALL TRUTH TO MAKE LIFE 100%
Weekly Attendance by Class w/e 6 th September 2013.
$1 Million $500,000 $250,000 $125,000 $64,000 $32,000 $16,000 $8,000 $4,000 $2,000 $1,000 $500 $300 $200 $100 Welcome.
Planes, Boats & Planograms Howard Bergman. The Power of the Customer There is only one boss. The customer. And he can fire everybody in the company from.
Presentation transcript:

Poor Man’s Fiber Network Welcome to FISPALIVE Nashville 2014 Poor Man’s Fiber Network By: Chuck Hogg Shelby Broadband

Introduction Chuck Hogg President, Shelby Broadband WISPA President and Board Member An ISP since April 2006 Largest WISP in Kentucky, covering from Southern Indiana to east of Lexington with over 140 sites serving 3500+ customers FISPALIVE 2014

How did we figure it out? Attended nearly every fiber session I could at tradeshows Visited other ISP’s that we felt were leaders in our industry Jason Hunt, Hunt Brothers Telecom Chuck McCown, Wireless Beehive/Beehive Broadband Reviewed multiple locations in our existing service area and began planning Became a CLEC (right of ways) FOA Handbook School of Hard Knocks, we did 3.1 miles over a couple months on the first project; we just finished 2 miles in 2 weeks on our last project FISPALIVE 2014

Supporting Equipment 2 Forklifts ($13k) Air Compressor ($5k) 2 Missiles ($2k) Cabinets ($6k) Fitel Fusion Splicer ($6k) Corning Ribbon Fusion Splicer ($4k) Condux Fiber Blower/Pusher ($7k) Double Reel Trailer ($1,250) Ditch With JT922 ($60k) Ditch Witch 4010 ($4k) Splicing Trailer ($13k) FISPALIVE 2014

ShelbyBB FTTH Project Our First Deployment 18k feet 72 lots with 54+ Homes FISPALIVE 2014

ShelbyBB FTTH Project Vaults (17 at $170ea, $2,890) 3M Splice Cases on eBay (30 at $25ea, $750) 8k’ 6 Strand Drop Cable for service drops ($1,600) 40k’ 1-1/4” SDR HDPE Conduit ($12,800) 11k’ Armored 72 Strand Ribbon ($6,930) 6k’ Armored 96 Strand Ribbon ($4,290) 1.5k’ Armored 24 Strand Ribbon ($660) 10k’ Toneable Flat Drop 4 Strand ($1,190) And many other small accessories and items FISPALIVE 2014

ShelbyBB FTTH Project Total cost including labor to install single 1-1/4” duct $6,000 per mile Total cost with installation of the fiber $5,800 per mile Ground Remediation Costs $1,200 per mile Utility damage costs $500 per mile Vault installation $1,000 per mile FISPALIVE 2014

ShelbyBB FTTH Project Fiber splicing and preparation $1000 per mile Project management and planning $1,000 per mile Miscellaneous costs $1,000 per mile Total cost per mile estimated at $17,600 per mile No costs were included for machines or maintenance, but we did include diesel In this project, we had approximately $5,000 in repairs due to bad/old equipment, but newer equipment had $800 in repairs. FISPALIVE 2014

ShelbyBB FTTH Project Served by High Capacity 24GHz AirFiber (750Mbit Full Duplex) 2 miles from our facility Actual cost of infrastructure $58k Planet Technology Metro-E Switch $800 RouterBoard 2011 for CPE $100 Average cost of install $500 Installation revenue $300 Expected yearly net revenue of $22k Break-even point approximately 3-4 years FISPALIVE 2014

ShelbyBB FTTH Project The 1st with Fiber WINS! FISPALIVE 2014

Questions?