Software integration aspects for the commissioning of Atlas m spectrometer S. Miscetti et al. (INFN-LNF) LNF –Atlas sw meeting LNF 17-Oct-2005.

Slides:



Advertisements
Similar presentations
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Advertisements

Athena on Cosmic Ray Data March 31, 2005 LNF Maura Barone.
June 19, 2002 A Software Skeleton for the Full Front-End Crate Test at BNL Goal: to provide a working data acquisition (DAQ) system for the coming full.
RPC Trigger Software ESR, July Tasks subsystem DCS subsystem Run Control online monitoring of the subsystem provide tools needed to perform on-
DSP online algorithms for the ATLAS TileCal Read Out Drivers Cristobal Cuenca Almenar IFIC (University of Valencia-CSIC)
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
26 February 2002ATLAS Muon Electronics Meeting1 MROD: the MDT Read Out Driver Status of MROD-1 Prototype Adriaan König University of Nijmegen.
Octal ASD Certification Tests at Michigan J. Chapman, Tiesheng Dai, & Tuan Bui August 30, CERN.
Data Acquisition Software for CMS HCAL Testbeams Jeremiah Mans Princeton University CHEP2003 San Diego, CA.
1 Raw Event : ByteStream implementation Muon Workshop, April 2002 A. Nisati, for the Muon Trigger group.
5 March DCS Final Design Review: RPC detector The DCS system of the Atlas RPC detector V.Bocci, G.Chiodi, E. Petrolo, R.Vari, S.Veneziano INFN Roma.
BOE/BME – MDT: DCS For the 2 BOE, DCS needs to handle 2 x 2 HV (1 ch/multilayer) 2x LV 2x JTAG, associated 2 MDMs/ELMBs Monitoring of T, B and CSM sensors.
Vladimir Frolov for Torino group. Experimental activities: The system for testing the MRPC in the Torino INFN laboratory has been fully mounted and checked;
Status of Data Exchange Implementation in ALICE David Evans LEADE 26 th March 2007.
RPC PAC Trigger system installation and commissioning How we make it working… On-line software Resistive Plate Chambers Link Boxes Optical Links Synchronization.
1 A ROOT Tool for 3D Event Visualization in ATLAS Calorimeters Luciano Andrade José de Seixas Federal University of Rio de Janeiro/COPPE.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
Recent Software Issues L3 Review of SM Software, 28 Oct Recent Software Issues Occasional runs had large numbers of single-event files. INIT message.
Gnam Monitoring Overview M. Della Pietra, D. della Volpe (Napoli), A. Di Girolamo (Roma1), R. Ferrari, G. Gaudio, W. Vandelli (Pavia) D. Salvatore, P.
17-Aug-00 L.RistoriCDF Trigger Workshop1 SVT: current hardware status CRNowFinal Hit Finders64242 Mergers31616 Sequencers2312 AMboards4624 Hit Buffers21212.
Mobile DAQ Testbench ‘Mobi DAQ’ Paulo Vitor da Silva, Gerolf Schlager.
Multistep Runs with ROD Crate DAQ Murrough Landon, QMUL Outline: Overview Implementation Comparison with existing setup Readout Status ModuleServices API.
Overview of DAQ at CERN experiments E.Radicioni, INFN MICE Daq and Controls Workshop.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
TRT Offline Software DOE Visit, August 21 st 2008 Outline: oTRT Commissioning oTRT Offline Software Activities oTRT Alignment oTRT Efficiency and Noise.
News on GEM Readout with the SRS, DATE & AMORE
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule.
2/4/2001Ludovico Pontecorvo INFN Roma1 Plans for the H8 system test: 2001/2002 Goals for the 2001/2002 Test beam Beam layout Chamber Supports 2001 Schedule.
Activity related CMS RPC Hyunchul Kim Korea university Hyunchul Kim Korea university 26th. Sep th Korea-CMS collaboration meeting.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
S t a t u s a n d u pd a t e s Gabriella Cataldi (INFN Lecce) & the group Moore … in the H8 test-beam … in the HLT(Pesa environment) … work in progress.
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
Upgrade Software University and INFN Catania Upgrade Software Alessia Tricomi University and INFN Catania CMS Trigger Workshop CERN, 23 July 2009.
MUON DAQ WORKSHOP Muon Week, CERN February 2014 Nicoletta Garelli (SLAC)
15/6/2006Gaia Lanfranchi - LNF-INFN1 Why do we have to measure efficiencies in the Muon Detector? Muon Software Meeting, June 15th G. Lanfranchi LNF-INFN.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
1 4 July 2006 Alan Barr - SCT DAQ Experience and plans from running the (SCT) DAQ at SR1 HEP Cosmics setup Running modes Problems Future.
Siena, May A.Tonazzo –Performance of ATLAS MDT chambers /1 Performance of BIL tracking chambers for the ATLAS muon spectrometer A.Baroncelli,
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
ATLAS The ConditionDB is accessed by the offline reconstruction framework (ATHENA). COOLCOnditions Objects for LHC The interface is provided by COOL (COnditions.
R. Fantechi 2/09/2014. Milestone table (7/2014) Week 23/6: L0TP/Torino test at least 2 primitive sources, writing to LTU, choke/error test Week.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
Sergio Vergara Limon, Guy Fest, September Electronics for High Energy Physics Experiments.
Off-Detector Processing for Phase II Track Trigger Ulrich Heintz (Brown University) for U.H., M. Narain (Brown U) M. Johnson, R. Lipton (Fermilab) E. Hazen,
GUIDO VOLPI – UNIVERSITY DI PISA FTK-IAPP Mid-Term Review 07/10/ Brussels.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
THIS MORNING (Start an) informal discussion to -Clearly identify all open issues, categorize them and build an action plan -Possibly identify (new) contributing.
Results with the RPC system of OPERA and perspectives
Online Database Work Overview Work needed for OKS database
CLAS12 DAQ & Trigger Status
Enrico Gamberini for the GTK WG TDAQ WG Meeting June 01, 2016
Risultati del run di integrazione M4
LHC experiments Requirements and Concepts ALICE
DAQ for ATLAS SCT macro-assembly
Controlling a large CPU farm using industrial tools
TOF CALIBRATION DATABASE
PADME L0 Trigger Processor
Commissioning of the ALICE HLT, TPC and PHOS systems
Online Software Status
ProtoDUNE SP DAQ assumptions, interfaces & constraints
Barrel RPC Conditions Database
Example of DAQ Trigger issues for the SoLID experiment
Tracker Software Status
MOORE (Muon Object Oriented REconstruction) MuonIdentification
Bringing the ATLAS Muon Spectrometer to Life with Cosmic Rays
RoD set-up for the TileCal testbeam, 2003 period.
Pierluigi Paolucci & Giovanni Polese
ZDD status BESIII Collaboration Meeting, September 2012
Presentation transcript:

Software integration aspects for the commissioning of Atlas m spectrometer S. Miscetti et al. (INFN-LNF) LNF –Atlas sw meeting LNF 17-Oct-2005

Commissioning phase with Cosmics in situ In the next months a lot of activity will be devoted not only to the physical installation of the chambers but also to the “not trivial effort” in: - debugging all hardware a.s.a.p. - defining a standard running time and running types for DAQ in USA15 - debugging acquisition with the first set of final MRODs … - defining a first functioning trigger scheme - defining a first proto-calibration scheme - trying a first offline reconstruction on the data It is nice to say that sector 13 will be (it is ) the first place where we can exercize, learn how to do all of this and make a real step forward for the commissioning of the whole detector. I will just describe here few starting comments of what has been done so far and where we can / should collaborate / integrate with other people. S.MISCETTI LNF Atlas sw meeting 18 11 05

RC implementation used today ….. In the following I will recall the different places where we can readout the MDT’s (and/or) the RPC’s (at least so far …) At all times, we used the so called ROD crate DAQ developed by E.Pasqualucci which is able to read out many MRODs adding then the missing ROB, ROS and EB formats. The different places we are working on are: SX1 to debug with noise-pulsing the chambers already tested in BB5 i) MDT CSM readout via GOLA card ii) RPC pulsing test under implementation (no gas flowing here) UX5: at the bottom of ATLAS pit. Now fully dedicated to RPC’s USA15: the place where final RODs will be located. It is at the level of the LHC pipe. Here most of the readout boards should converge. For what I have understood the DCS + HV main readout should also go here. S.MISCETTI LNF Atlas sw meeting 18 11 05

Noise and pulsing tests Noise runs are easily implemented by 10 kHz free-pulsing with a NIM oscillator. Pulse tests for MDT have been implemented in July 2005 by sending a 3-5 V, 20 ns wide pulse in the HV chain. (1) Best performance seen at 3 V. When using 5 V a lot of x-talk present. (2) Other pulse tests tried at ROMA3 (3) Other pulse tests possible by manipulation of TTC directly at the TDC level. SX1 pulse of kind (1) needed only to check MDT status However tests of dependence on T vs Q possible together with a check of the scale calibration of the TDC. For above reasons and for the possibility of being used in the final setting .. the pulse technique number (3) much more promising to check T0 stability (TO BE TRIED! Implementation possible in SX1, USA15) S.MISCETTI LNF Atlas sw meeting 18 11 05

Noise and pulsing tests From P.Branchini presentation at Roma3 …. In Atlas sara’ possibile utilizzando il sistema TTC e programmando opportunamente lo stream di jtag. In laboratorio a Roma non abbiamo il sistema presente al CERN ed abbiamo un csm0 che consente di programmare i mezzanini utilizzando Jtag ma non distribuisce impulsi ai mezzanini. Di conseguenza a prima vista non sembrerebbe possibile mettere su un sistema di impulsaggio con il daq che c’e’ a Roma3. Quindi lo abbiamo fatto. S.MISCETTI LNF Atlas sw meeting 18 11 05

Reading out more than a CSM link … There is a lot of confusions when accessing data for the terminology used. The CSM is the Service Module of the MDT where a TTC fibers goes in input to provide the trigger and an optical fiber of readout transfer the data over threshold from the TDCs. However in the MDT partitioning scheme (ATLAS-DAQ-2003-023) there is continuous reference to CSM link number indicating the position in the MROD where the optical readout link of a given CSM is inserted. The MROD itself is identified by the SourceId word. The SourceID in Hexadecimal is divided in 4 fields Reserved Word ModuleType SubDetector ModuleId ModuleType: 0,1,2 identify the ROD, ROB, ROS fragment SubDetector : define Barrel or others (eg 61 = MDT barrel) ModuleID is two (three) bytes ex. 09, 0A .. Identifying the crate and the board Position in the crate. For the moment being we just use the slot position S.MISCETTI LNF Atlas sw meeting 18 11 05

Reading out more than a CSM link … In USA 15 we have readout 3 chambers connected to the same MROD board in three different MROD inputs. By dumping the data we find MRODtype x 6109 The words readout from the different readout links from the CSM are collected as a list with a BOL (Beginning of link) and EOL (end of link) header and trailers. In this way a single CSM (ie an MDT) is selected. For each CSM the TDC words are then stored as a timing list connected to a given TdcId and ChanId. For a given MROD there are from 6 to 8 CSM optical links. For a given CSM link the number of TDC is related to the number of mezzanine cards. In USA 15 we have 2 MRODs with 6 CSM links per board. In total we can read out (at the moment) up to 12 csm links or 12 MDT chambers S.MISCETTI LNF Atlas sw meeting 18 11 05

Cosmic running with Scintillators While the RPC system is still not gas-flushable we have organized a first readout in USA15 by setting a simple coincidence of two scintillators. S1, S2 each of dimensions 0.2x3 m2 Each scintillator is readout by two PMs (A,B). We plateau the PMs in SX1. We make them light-tight and we test the Rates of (S1a * S1b) , (S2a * S2b) and of the 4-fold coincidence when overlapping them along the longitudinal dimension. We measure 100 HZ , 30 HZ for the two-fold , 4-fold coincidence as expected. When in UX5 we measured 30 HZ , 1 HZ for the same configuration. We then set a 125 m long RG58 cable to bring the trigger from UX5 to USA15. We finally correct for the delay by setting the correct timing in the pipeline readout in the mezzanine cards. We took data with cosmics both in the pit or from USA 15 reading out BML1(2)(3)A13. S.MISCETTI LNF Atlas sw meeting 18 11 05

GNAM vs MDT2ntu … When trying to analyze these data we found that the offline tools existing at BB5 were not sufficient. Indeed also at SX1 we were able to analize with MDThistos by S.Zimmerman only one chamber at the time. We discussed with Fabio/Ludo and all other LNF people how to improve this. The first available and “easy” solution was to use GNAM GNAM is able to read data from memory when RodDaqCRate runs and also to read them from a file using a file_server … The connected MDT-library is already well developed and able to treat everything in the correct way also for the whole detector. However to modify it or add any kind of specific selection is a little bit too complicated and expert oriented. As a first step, we therefore modified the code of MDThistos S.MISCETTI LNF Atlas sw meeting 18 11 05

MDT2ntu format S.MISCETTI LNF Atlas sw meeting 18 11 05

GNAM spectrum S.MISCETTI LNF Atlas sw meeting 18 11 05

MDT2ntu fast analysis… S.MISCETTI LNF Atlas sw meeting 18 11 05

MDT2ntu fast analysis… S.MISCETTI LNF Atlas sw meeting 18 11 05

MDT2ntu display S.MISCETTI LNF Atlas sw meeting 18 11 05

StorageReader implementation The first scheleton of data interpretation in a stable way w/o the usage of the whole Athena framework has been done by M.Barone by implementing the Storage Reader for MDT. Its advantage will be evident for the debugging period on the whole detector since: 1) It is as flexible as GNAM and can analyze different chambers at the same time. 2) It can be used by simple modification of Root Macros 3) It reads directly the file w/o any need of a file server. Discussion is in progress with Roma 1 people to include in the same way also the routines for the RPC decoding and for monitoring L1 trigger. S.MISCETTI LNF Atlas sw meeting 18 11 05

Towards athena … It is obvious that an important point will be that of reading out everything with Athena and to be able to create the same Root Tree/Ntuple in this framework. The real advantages will be: - To start working on the calibration algorithms - Look also at tracking (Moore) - Ev.Display S.MISCETTI LNF Atlas sw meeting 18 11 05

Towards Athena + calibration 1 ) The cosmics rate we observe now is not great (0.2 – 2 Hz/m2) but it will be enough to start looking at least to T0,Tmax stability and to get a first rough estimate of the R-T relations. 2 ) Illumination of the whole chamber has to wait for the RPC trigger. 3 ) Discussion with Roma3 people started. - I am trying to organize a meeting during the muon-week of 28-30 November to start collaborating on this. - I have sent an e-mail yesterday to D.Orestano to discuss how to use Calib on these data . The “response” seems to be very positive. Any volounteers? 4 ) Insertion of T0 calibration via pulsing is relevant to decide how much effort needed for the partial event reconstruction on ROI selection at L2 (E.Pasqualucci). S.MISCETTI LNF Atlas sw meeting 18 11 05

Tracking ? MOORE tracking with cosmics is slightly problematic since the TDC stops (ie the trigger) is not phased-locked with the machine clock (25 ns of additional jitter). This should be an interesting effect to analyze when the final trigger will be in place. A good review of the tracking status with cosmics has been done by C.Guyot at the software meeting. The Timing-effect will be tested with real data vs simulation in the coming months. The effect of this and of the rough calibration on HLT triggering has to be evaluated. We are in contact with HLT people to organize a strategy to DEFINE how to use TrigMoore for the cosmics muon trigger for data taking of the whole spectrometer. S.MISCETTI LNF Atlas sw meeting 18 11 05

Overall readout and software scheme ?? links L1 trigger MDT HV RODS L2trigger Fee + Mezzaninemapping StorageReader EVB Emulator Or Final Partial EB At L2 Calibration Geometry Mapping HLT Athena Calibration Stream S.MISCETTI LNF Atlas sw meeting 18 11 05