General Approach On How To Use The Basic Tools Of Quality Improvement

Slides:



Advertisements
Similar presentations
Quality control tools
Advertisements

P D S A REVIEW ACT PLAN STUDY DO Plan Continuous Improvement
Agenda For Today! Professional Learning Communities (Self Audit) Professional Learning Communities (Self Audit) School Improvement Snapshot School Improvement.
WAREHOUSING MANAGEMENT
WAREHOUSING MANAGEMENT
Lean Six Sigma Green Belt Training
East Central Regional Hospital
Project leaders will keep track of team progress using an A3 Report.
Describing Process Specifications and Structured Decisions Systems Analysis and Design, 7e Kendall & Kendall 9 © 2008 Pearson Prentice Hall.
Accounting Information Systems 9th Edition
Seven Quality Tools The Seven Tools
IE673Session 5 - Process Management1 Process Management.
©2003 Prentice Hall Business Publishing, Accounting Information Systems, 9/e, Romney/Steinbart 6-1 Systems Development and Documentation Techniques.
Problem Solving. Objective of Problem Solving OODA Loop Problem Solving Process – Types of “problems” – 8 StepsOverview.
Grace Gorenflo Jack Moran. Goal: To provide a foundation for COP-PHI awardees’ quality improvement efforts Learning Objectives: - Understand the distinction.
Community Health Board Name Health Departments within CHB.
Degree and Graduation Seminar Scope Management
Dr. Ron Lembke SCM 462.  Financial return  Impact on customers and organizational effectiveness  Probability of success  Impact on employees  Fit.
Chapter 15 Work Flows Focus: This chapter describes the basic tools and techniques for analysis.
ISHIKAWA’S BASIC SEVEN TOOLS OF QUALITY
1 Employability skills (a) Employers value people who: fit well into their team and workplace use initiative to solve routine problems work productively.
CONSTRUCTION OF A FLOW CHART DR OKUNOWO BOLANLE EDM UNIT.
Quality Improvement: Problem Solving
Scott D. Duncan, MD, MHA, FAAP. Science of Safety We cannot improve quality and safety of healthcare until we view the everyday delivery of healthcare.
Performance Management and Quality Improvement 101 Jack Moran, PhD Public Health Foundation.
A Tool For Continuous Improvement
The Software Development Cycle Defining and understanding the problem.
SUBJECT  Industrial facility design. GROUP MEMBERS H.Hammad Ali 11-IE-32 S.Hammad shah 11-IE-21 Hammad Hassan 11-IE-41.
Partnering and Collaborative Working An Introduction Dr Neil Jarrett.
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited Introduction to 5C TOTAL QUALITY MANAGEMENT 5C.
Overview of Total Quality Tools
Everyone Has A Role and Responsibility
Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin.
Healthcare Performance and Measurement Tools Tom Knoebber Mission Hospitals Asheville, North Carolina.
Design. Stages of Design i.Nature of the solution 1.Agreed set of objectives 2.Output design 3.Input design 4.Data Flow Diagram 5.System Flowchart 6.Data.
Black Belt Project Storyboard Template
STEP 1: DEFINE THE PROBLEM Problem Statement: What is the problem? A problem is a discrepancy between a standard and the current situation. The ‘standard’
“Without the Cost of Waste …”
Seven Quality Tools The Seven Tools –Histograms, Pareto Charts, Cause and Effect Diagrams, Run Charts, Scatter Diagrams, Flow Charts, Control Charts.
1 Presentation Template: Instructor Comments u The following template presents a guideline for preparing a Six Sigma presentation. An effective presentation.
Test and Review chapter State the differences between archive and back-up data. Answer: Archive data is a copy of data which is no longer in regular.
9. Applying scientific tools & techniques for improving customer satisfaction.
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
© 1998 by Prentice-Hall Inc Russell/Taylor Oper Mgt 2/e Chapter 15 Lean Operations in Services.
QI Tools to Diagnose HPV Vaccine Delivery Concerns in Your Practice
Traditional Economic Model of Quality of Conformance
Data Collection & Analysis ETI 6134 Dr. Karla Moore.
Central Massachusetts Regional Library System Libraries and Lean Thinking An Overview / Workshop May 11, 2009.
[Title of QI Project] Resident name: Faculty Advisor: Start date: End date:
BE-TL1-001-DRAFT-5S 5S Business Excellence DRAFT October 5, 2007.
Last Updated: MONTH, YEAR Team: M. W. (Team Leader)R. F. T. D.M.G. T. L.D. J. (Sponsor) Green Belt Project Objective: TITLE Green Belt Project Objective:
Principle of ongoing improvement
Performance Management and Quality Improvement 101
Six Sigma DMAIC Improvement Story
Buffalo Trace District Health Department
SYSTEMS ANALYSIS Chapter-2.
OPS/571 Operations Management
Lean Operations in Services
Title: Owner: Ver: Date:
Quality Improvement: Problem Solving
Title: Owner: Ver: Date:
Title: Owner: Ver: Date:
© 2013 American College of Cardiology
Quiz 3.
Quiz 3.
and its applications to improve animal welfare during transportation
LEAN IMPLEMENTATION Training SUMMARY OF RESULTS
SDLC Phases Systems Design.
Site (e.g., LARC Embakasi)
Presentation transcript:

General Approach On How To Use The Basic Tools Of Quality Improvement “AIM” Issue To Consider Brainstorm & Consolidate Data Flow Chart Existing Process Cause & Effect Diagram – Greatest Concern Brainstorming Force and Effect “As Is” State Use 5 Whys To Drill Down To Root Causes Monitor New Process & Hold The Gains Run Charts Control Charts Flow Chart New Process Analyze Information and Develop Solutions Translate Data Into Information Gather Data On Pain Points Solution and Effect Diagram Pie Charts Pareto Charts Histograms Scatter Plots, etc. Data Management Strategy – Ch. 14 “As Is” State to “Should Be” State Source: The Public Health Quality Improvement Handbook, R. Bialek, G. Duffy, J. Moran, Editors, Quality Press, © 2009, p.160

The ABC’s of PDCA, G. Gorenflo and J. Moran Plan Check/ Study Identify and Prioritize Opportunities 7. Develop Improvement Theory 1. Reflect on the Analysis 2. Develop AIM Statement 8. Develop Action Plan 2. Document Problems, Observation, and Lessons learned 3. Describe the Current Process Do Implement the Improvement 4. Collect Data on Current Process Act 2. Collect and Document The data Adopt Standardize 5. Identify All Possible Causes Adapt Do 3. Document Problems, Observations, and Lessons Learned 6. Identify Potential Improvements Abandon Plan

Some Tools To Help Create AIM Statements Current and Future State Model AIM Work Sheet Force Field Diagram Force and Effect Diagram

What is the current state? Driving Forces: Future State: Why is this important? What is it costing us time/dollars/staff/etc? What is the impact on our customer/clients? What is the impact on our division/agency? Driving Forces: Future State: What are the important aspects of the future state? What is driving us to this future state? What might be the consequences of not moving to the future state? What might change? What is the proposed timeline? Pathway Consequences Benefits

(what will it improve and for whom?) AIM or Opportunity Statement An opportunity exists to improve the ________________________________________________________________________ (name process, or area to work on) beginning with ___________________________________________________________ (beginning boundary, starting point) and ending with __________________________________________________________. (ending boundary, finish point) This effort should improve _______________________________________________________________________ _____ __________________________________________________________________ (key characteristics of area the team is working on) for the _________________________________________________________________ ______________ _________________________________________________________. (customers, staff or those affected by the process under improvement) This process is important to work on now because ____ ___________________________________________________________________ (what will it improve and for whom?)

Desired State Current State Force Field Diagram - Basic Positive Forces Negative Forces Desired State Current State

High Level S I P O C+CM Collection Form Constraints: Ends With: Begins With: Process/Activities: Measures Outputs: Inputs: Suppliers: Customers: 8

SIPOC+CM

Flow Chart Symbols Flow Lines Manual Operation Start/End Bookends A Connector Data Base Comment Collector Activity: Operation/Inspection Wait/Delay Decision Display Storage Input/ Output Data Transport Manual Input These symbols are in Microsoft Power Point Document Input Preparation Forms Output Unfamiliar/ Research 10

Flow Chart Summary Matrix PHF E-News, March 2, 2010, http://www.phf.org/pmqi/Flow-Chart-Summary-Matrix.pdf Actual Proposed 1 2 3 4 5 6 7 8 Flow Chart Step Number Type of Step Delta +/- ∑ ∑ P D P T W P D S Touch Point (√) Cost FTEs/Person Hrs. Supplies Required Equipment Required Space Required Time Cost of Quality Partnerships Needed Etc. Value added Type of Step: P – process, D – decision, T – transport, W – wait, S – storage Delta = Proposed – Actual – the more negative the subtraction the better – more savings

LSS 5S is a visual method of setting the workplace in order. It is a system for workplace organization and standardization. The five steps that go into this technique: Seiri – sort – essential items Seiton – set in order – promote work flow Seison – shine – clean workplace Seiketsu – standardize - consistency shitsuke)- sustain – hold the gains

Definition of 8 Types of Waste: Description Public Health Example Overproduction Items being produced in excess quantity and products being made before the customer needs them Insurance filing or immunization record opened before all required information is received Waiting Periods of inactivity in a downstream process that occurs because an upstream activity does not produce or deliver on time. Paperwork waiting for management signature or review Unnecessary Motion Extra steps taken by employees and equipment to accommodate inefficient process layouts. Immunology testing equipment stored in cabinets far from specialist work area. Transportation Handling Unnecessary movement of materials or double handling Department vehicles stored in central facility, requiring constant movement of vehicles to and from other high traffic locations Over-processing Spending more time than necessary to produce the product or service Combining client survey instruments into one form rather than develop specific instruments for each program Unnecessary Inventory Any excess inventory that is not directly required for the current client’s order Over estimating vaccination support materials requiring additional locked storage cages, inventory counting and reconciliation Defects Errors produced during a service transaction or while developing a product. Ineffective scripts for initial intake applications. Unclear directions for filling out required forms Duplication Having to re-enter data or repeat details on forms. Poorly designed client intake computer screens or services checklists

Cause and Effect Diagrams - Construction Generate ideas as to what are the main causes of the effect Label these as the main branch headers Organizes group knowledge about causes of a problem and display the information graphically Header Header Effect Header Header

Root Cause Analysis Rating Form Impact on the Problem Potential Root Cause Improved Customer Satisfaction Improved Quality Reduced Costs Others Total Score Ranking Impact Scoring Scale: Low = 1, Medium = 3, High = 5

Cause and Effect Diagram

Solution and Effect Diagrams - Construction Generate ideas as to what are the main Solutions of the effect Label these as the main branch headers Solution Solution Effect Solution Solution

Root Cause Analysis Solution Impact Analysis Potential Solutions Corrective Action Type Verification Method Cost To Fix Benefit Of Fix Cost Benefit Ratio Selected? Y/N Corrective Action Type: Immediate but Interim – II, Short-term Temporary - ST, Permanent – Short Term – PST, and Permanent – Long Term - PLT

Solution and Effect Diagram

Intervention and Impact Form AIM Statement Description: 1. 2. 3. 4. 5. 6. 7. 8. Intervention Number Date What Was The Change? How Did It Impact The AIM? How Did Your Thinking Change? How Did It Impact Your Procedures? How Did It Impact Your Customer? How Do You Know? Measures  

The following columns can be added to the Intervention and Impact Form when needed to track the impact of unintended consequences. 9 10 11 12 13 14 15 Unintended Consequence Letter Unintended Consequence Description Date It Happened Impact To Aim Statement Need a Sub AIM Statement? Impact to Customer Modifications Made   Intervention and Impact Form when needed to track the impact of unintended consequences.