Module IV: CMGC Pre-Construction Phase Joe Elsen, Region 3 Benjamin Acimovic, Region 1.

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

CM/CG Contracting Tom Ravn, Mn/DOT Director, Office of Construction and Innovative Contracting.
Organization of Primary Entities
Bob Smith, P.E. Region 1 Benjamin Acimovic, P.E., Region 1
Project Procurement Management
Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
RFP AND CONTRACT PHASE Jeff Wassenaar, P.E., HQ Project Development Benjamin Acimovic, P.E., Region 1.
AACEI Contingency Forum Contingency Management
CMGC Contracting at UDOT Program, Projects & Lessons Learned
Guidebook for Risk Analysis Tools and Management Practices to Control Transportation Project Costs Keith R. Molenaar, PhD Stuart D. Anderson, PhD, PE Transportation.
Ensure Vendor/Engineer of Choice Product Quality
Alternative Project Delivery
Facilities Institute July , 2012 Houston, Texas Click to edit Master title style
Project Cost Management Estimation Budget Cost Control
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
Delivery Methods  The Players from Handbook of Architectural Practice, Chapter 9.1 by Phillip Bernstein FAIA  Variables from Handbook of Architectural.
PROCEDURES FOR SELECTING THE CONTRACTOR
Performance Monitoring All All Contracts require basic monitoring once awarded. The Goal of contract monitoring is to ensure that the contract is satisfactorily.
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
Other Planning Processes: Final Planning Touches
Report Tile Training & Management Assistance Branch UNITED STATES OFFICE OF PERSONNEL MANAGEMENT Project Kick-Off Meeting for with Project Manager Name,
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
PM/CAM Training H. Jeff Moore May 11, AGENDA Overview CM at Risk Design (Completion) / Build Lunch Break / Discussion – 11:30 AM – 12:30 PM CM Agency.
Managing Fast – Tracked Projects: A Review of ECI Report Dr
Project Risk Management. The Importance of Project Risk Management Project risk management is the art and science of identifying, analyzing, and responding.
Risk Sanibel Island Bridges &Toll Plaza Case Study Doug Cox, PE.
Module 1 Session 1.1 Visual 1 Managing the Implementation of Development Projects Course Overview and Introduction.
Project Risk and Cost Management. IS the future certain? The future is uncertain, but it is certain that there are two questions will be asked about our.
What is Project Management? How does it affect how you do your job?
Design–Build Contracts G. Hardy Acree Director of Airports Sacramento County Airport System Advantages of of During Turbulent Times.
Construction Contracts and Project Delivery Methods
A New Paradigm for Utility Coordination Kenny Franklin INDOT Director of Utilities and Railroads.
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
Risk Assignment in The Delivery of a Project  RISK! –Construction projects have lot of it –Contractors manage it –Owners pay for it.
January 24, …a delivery method which entails a commitment by the Construction Manager to deliver the project within a Guaranteed Maximum Price (GMP).
SacProNet An Overview of Project Management Techniques.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
TYPES OF CONTRACTS.
Subcommittee on Design New Strategies for Cost Estimating Research on Cost Estimating and Management NCHRP Project 8-49 Annual Meeting Orlando, Florida.
Presented By: Jeffrey T. Folden, P.E. Assistant Chief, Innovative Contracting Division.
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
Project Delivery Methods Part I. What is A Project Delivery Method? The owner’s selection of the organizational structure of the project. Three popular.
Project Procurement Management
Contractor Alternate Design Serving the Public’s Best Interest.
You passed the Bond or secured some funds What do we do now? 2014.
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
Module 5 Session 5.2 Visual 1 Module 5 Refining Objectives, Scope, and Other Project Parameters Session 5.2 Reviewing the PAR and refining key project.
LACCD Building the Future THOMAS HALL Director Facilities Planning and Development.
Degree and Graduation Seminar Integration Management
IT PROJECT MANAGEMENT B U D I L U H U R U N I V E R S I T Y POST GRADUATE PROGRAM OF INFORMATION TECHNOLOGY.
Project Delivery Performance Improvement Report to the Oregon Transportation Commission Hal Gard, Technical Services, Geo-Environmental Dee Jones, Technical.
Chapter 3: Purchasing Research and Planning Strategic Planning for Purchasing Strategic planning for purchasing involves the identification of critical.
1 1 Effective Administration of Commercial Contracts Breakout Session # Session D06 Name: Holly Walker, CPCM Corporate Learning Solutions and Contract.
Office of Major Project Development (OMPD) Overview November 2015.
Copyright 2012 John Wiley & Sons, Inc. Part II Project Planning.
Construction Management At Risk Process
The purpose of the US 53 project is to address the termination of the 1960 easement agreement that affects the current highway location in order to continue.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Project Stakeholder Integration in Off-Site Construction May 24, 2016 Partners in Progress.
CHANGE ORDER/CLAIMS MANAGEMENT MODULE 9. Change Order Management.
Security Development Lifecycle (SDL) Overview
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
ITPD ISSUE MANAGEMENT PROCESS SEPTEMBER 5, 2008
Part II Project Planning © 2012 John Wiley & Sons Inc.
PMI North Area PMP Exam Study Group
Project Overview.
Second Avenue Subway Project Execution Strategy
Presentation transcript:

Module IV: CMGC Pre-Construction Phase Joe Elsen, Region 3 Benjamin Acimovic, Region 1

Topics Importance of the Preconstruction Phase Partnering Active Project Management Risk Assessment and Risk Register Constructability and Written Reviews The Open Cost Model Environmental Clearances Independent Cost Estimator GMP Process and the D-B-B option

Importance of the Preconstruction Phase The Preconstruction phase is where the ground work for the relationships, negotiations, models, and risk register that will make the project successful is performed. The Preconstruction phase is where the partnering and communication is critical to the success of the project. The contractor gets to fully understand the site constraints The contractor gets several months of project exposure There is an opportunity to shorten the project critical path Managing scope, schedule, and budget is enhanced. Managing relationships, people, and personalities

Partnering Critical to the success of the project: Establish organizational roles and responsibilities. Establish lines of communication between all team members. Set the culture that will continue throughout Pre-con and Construction Phases No blame, only solutions (quote from FHWA Peer Exchange on CM/GC) Builds the relationship foundation for: Understanding schedules and assumptions Creating an atmosphere where effective problem solving is rewarding Minimizing disputes and fast tracking dispute resolution Adding to overall success of the project.

Active Project Management The role of the CDOT Project Manager and CDOT Team Trust is vital CDOT PM needs to lead the meetings and manages all communications, roles, and responsibilities. Plays key role as facilitator and mediator for the team. Empowered to manage and lead the project. Project management team must be very involved in the project knowing design and construction aspects so that quick decisions can be made. CDOT management team needs to have the resources and time

Active Project Management The role of CDOT HQ and Region Specialty Groups Backup the project management team. Typical design-bid-build responsibilities Design input and Review with team and the ICE Attend Meetings and participate actively Understand roles and responsibilities Similar to D/B/B, with added collaboration Engage in Risk Assessment and Mitigation

Active Project Management The role of the contractor in design Contractor acts as an advisory or subject matter expert in the area of construction, constructability, construction estimating, schedule, material choices, risk assessment. The role of the designer (consultant or CDOT) in design To design all aspects of the project – traffic, roadway, bridge, geotech, walls, hydraulics, etc. Responsible for stamping the plans Both are required to communicate and collaborate!

Active Project Management What happens when:

Active Project Management Its up to the CDOT project manager to lead, mediate, and make the decisions if the team has collaboration issues. Keep the partnering strong and document everything with s and memos. Know the project scope, budget, and schedule as well as anyone on the project.

Risk Assessment and Risk Register Risk Assessment CM/GC allows the team to jointly identify, discuss, and analyze risks Assign that risk to the party best-suited to mitigate the cost or schedule impact During preconstruction, risk can often be eliminated through design changes Risk Register Many risks are identified during Project Delivery Selection process Contractors assess risk on virtually every job – contingency $ added Joint use of the Risk Register allows good decisions to be made and limit contingencies Allows the contractor to track and communicate the risk it sees as high, medium, and low.

Risk Assessment and Risk Register Shared Risk Contingency Pool Think of this as a Minor Contract Revisions (MCR) pool that is for risks that occur. The Contractors pricing has the risk removed from unit prices. Creates an incentive to avoid use of the Pool since it will be split 50/50 at the end Range of approx 3 to 10% and will be negotiated on a project by project basis.

Constructability and Written Reviews Constructability Reviews Focus on project means and methods to build the work. Are these plans and specifications able to be constructed effectively? Example – determination of crane type and quantity to erect a bridge Need to consider many factors including Context Sensitive Solutions (CSS) Having the contractor at the table to give real costs is invaluable during this phase. Crane charts for pad location and swing requirements are analyzed to predict time and cost. Written Reviews Critical to document decision-making process. Able to track changes efficiently Less reinvention of the wheel

ROLE OF THE CONTRACTOR Dotsero Preconstruction – Value Added

Input from Kraemer on Early Design Work : o Beam Erection Analysis / Selection of Girders

2400V – Value Added Input from Sturgeon Electric: o A one word mistake discovered by Sturgeon saved CDOT $1.4 million. Two Starter Two Winding Two Starter One Winding o Identified high risk in 35 year old cables and wires falling part during removal of cabinets. Replacement of cables was added to the project. o Long Lead Time Cabinet Switchgear ordered before construction phase began. Allowed teams to continue design and begin construction ahead of cabinet delivery.

The Open Cost Model How much is this project really going to cost? Costs can change from Scoping to FIR to FOR to Construction to Final Payment How sure are you? With D/B/B we mainly focus on historical numbers and market conditions. Looking at Labor, Materials and Equipment CM/GC allows actual contractor bidding info to be examined prior to finalizing design. Transparency and documentation is critical. Very important to reach agreement on quantities, units, assumptions, and specifications. Importance of locking down the CM/GC Management Fee Using Best Value we obtain this number during the procurement of CM/GC services. Transparency is Key - be respectful of the Confidentiality Agreement!

Environmental Clearances D-B-B Process Very similar to D/B/B and processes that CDOT already has established. The recently revised Design Bulletin offers greater latitude, pending FHWA approval, to advance design past preliminary stages prior to decision documents or top part 128 clearances. Multiple Phases The multiple GMP approach is beyond the scope of this training. Each phase or bid package must be severable and able to advertise and complete without any other part of the project. Each Package is cleared and taken to construction separately. Examples are construction of a key haul road, detour, or bridge work, etc

Independent Cost Estimator Role of the ICE The ICE is an independent check for construction cost estimating They are contracted directly by CDOT and cannot be contracted directly by the project design consultants or contractors. They need to understand the assumptions that go into pricing the work. When does an ICE come into play? Typically at 30%, 60% & 90% plan reviews, to compare to the Contractors Opinion of Probable Construction Cost or OPCC When an LLTP GMP proposal is submitted. When a construction GMP is submitted. How do we bring an ICE onboard? By Task Order - CDOT will have a statewide NPS contract available in February (also appropriate to procure a Project Specific contract)

GMP Process and the D-B-B option What is a GMP? A Guaranteed Maximum Price, or GMP, is submitted by the Contractor as a proposal to CDOT. It is created from two parts: Direct costs of completing the construction work in bid form Construction Management Price Percentage – Margin (Overhead, Profit, and General & Administrative costs) It is essentially their bid for the work without Risk Contingency which is handled through negotiated F/A items and a shared risk contingency pool.

GMP Process and the D-B-B option What happens if a GMP proposal is not accepted? The GMP needs to be within 10% of ICE and EEMA estimates. GMP proposals can fail. Our guidance is that GMP proposals can be submitted three times and the open cost model renegotiated in order to reach agreement. If no agreement can be met, CDOT reserves the right to advertise the bid package to solicit low bids. The CM/GC firm can NOT bid on the project as the general contractor.

CM/GC Preconstruction Questions?