SCAFFOLDING CUBE CHALLENGE

Slides:



Advertisements
Similar presentations
Fixed and mobile scaffolds
Advertisements

Safe working on or near roofs
Click your mouse once to begin. STEP-BY-STEP CONSTRUCTION In this presentation You will learn how to safely erect and dismantle a tower scaffold Consider.
A Free Resource From The presentation is from Mark Sutton For SAFEHANDS Health & Safety Consultants Ltd A Free Resource From
Working at Height - Ladders. Legislation The Work at Height Regulations 2005 Ladders can be used for short duration work when: the risk assessment shows.
Introducing TG20:13 Terry Roberts, CADS
Note: Lists provided by the Conference Board of Canada
PowerPoint presentation
Pasta Towers. The Challenge Teams of up to 2 will design and build the lightest pasta tower with the highest structural efficiency, capable of supporting.
Lesson 1/4 Lesson Objective: To explore a design brief and develop a plan for professional design. To explore existing products and establish design features.
Hull History Center INFORMATION PACK
Working at Height Learning Lite Module. Why do we need to understand the risks? In 2008/09 there were 35 fatalities, 4654 major injuries and a further.
Rectangular framed structures
SHE Code 4: Safety and Safe Use of Work Equipment
Design and Technology – Anemometer Project
Outcome 5 Safety requirements for using access equipment Unit 201: Health and safety in building services engineering.
Unit 1001 Safe working practices in construction © Pearson Education 2010 Printing and photocopying permitted Learning Outcome 6 Know about basic working.
Level 2 Unit 6 Application of Manufacturing Techniques in Engineering Engineering Diploma Level 2 Unit 6 Application of Manufacturing Techniques in Engineering.
Structural Engineering
© Pearson Education Limited, Copying permitted for the purchasing institution only. This material is not copyright free. Painting and Decorating.
Considering Workplace Exposure Initial findings from the Construction CIP.
Modelling and Prototyping Aims: To be able to DESCRIBE the process of SKETCH MODELLING and BLOCK MODELLING. To be able to EXPLAIN the reasons for using.
Click Here to Begin. Click on to move forward Click on to move back to Previous screen Click on to go Home Next Back Next.
Procedure for erection and use of mobile tower scaffolds (Revision 1 – 5 th April 2011) Toolbox talk.
Procedure for use of Zarges ZAP scaffold (Revision 0 – 5 th April 2011) Toolbox talk.
Starter To complement our notes and learning from last lesson (Topic 10 Introducing Large ICT Systems: Features of Large ICT Systems), fold your piece.
1 Name___________________ Start Date_____________ PLUMPTON COLLEGE.
New Aerial Lift Standards Getting Close To Completion
Working at Height How to comply with the new Regulations.
Module Three Lifting with 60 inch Pry Bars and Cribbing.
Index Temporary Works: No.Subject 1Timber Trenches 2Timber Scaffolding.
2.3 People and ICT. Home learning Choose one of the following jobs: – Systems analyst – Software developer – Web designer – Web administrator – Help desk.
Flow: a framework for discussing teaching
Project Overview Introduction to Factory Automation Numerical Control
Building a Skyscraper Strong Enough to Withstand an Earthquake Task
Scaffolding By Scott Santon
Basic Communication Skills
Researching a newspaper article
Flow: a framework for discussing teaching
Sharepoint Call Log Job Tool
Skills and Techniques Lesson Two.
Questions (Please use complete sentences for #4-7.)
World of work How do tasks bring the WoW into the classroom?
Session 1 Ladders Health and safety Book Pages
Yr 7 Key tag.
Click anywhere to get started…
Setting up an online account
BOLTED JOINT ASSEMBLY WIND ENERGY FIELD SERVICE TECHNICIANS
How to Create and Start a Test Session
BOLTED JOINT ASSEMBLY WIND ENERGY FIELD SERVICE TECHNICIANS
Investigating an engineered product
CIDA Mock Project DA203.
Investigating an engineered product
HANDOUT Page for facilitators that lists all the hand outs needed for the workshop and the meanings of icons used on the slides in this workshop. SLIDE.
1.1 The Characteristics of Contemporary Processors, Input, Output and Storage Devices Types of Processors.
Workforce Engagement Survey
Yr 7 Pencil Holder Unit.
Technical Proficiency GAA Award 2 YOUTH ADULT 240 minutes (4 hours)
1) 2) 3) 4) 5) Warm Up/Do Now Evaluate: OBJECTIVE: Try these problems
ACCESS EQUIPMENT.
CQ2 – What are the planning considerations for improving performance?
Scaffolding. Trestle Scaffolding As the name suggests, this type of Scaffolding is supported on tripod type movable ladders. This type of Scaffolding.
AICT5 – eProject Project Planning for ICT
Sustaining Quality Curriculum
Building a Skyscraper Strong Enough to Withstand an Earthquake Task
World of work How do tasks bring the WoW into the classroom?
Need SME in put especially for the video scripts
Assistant Headteacher – St Francis of Assisi Primary School
Isolation Procedure Topic 2, Unit 6.
Presentation transcript:

SCAFFOLDING CUBE CHALLENGE Explain that participants are going to work in small teams to create a ‘scaffold’ cube. Teams will have a chance to work through a set of instructions to create the cube which will then be dismantled and rebuilt in a timed competition. There now follows a series of power point slides which will explain the importance and complexity of scaffold structures and outline some of the Health & Safety regulations regarding Working at Heights. Please see this weblink for more information. http://www.hse.gov.uk/pubns/indg401.pdf

CONSTRUCTION INDUSTRY SCAFFOLDING IS A HUGE PART OF THE CONSTRUCTION INDUSTRY Most participants will be familiar with seeing scaffolding around construction sites. This is possibly the most common use of scaffolding. Ask if they have seen scaffolding used for any other purposes. Examples include: Alongside motorways/roadways when installing/repairing overhead cables To create stage sets at festivals In the building of bridges If there is time participants could research uses of scaffold and gather images

Explain that regulations regarding Working at Heights and Health & Safety have meant that there has been a huge increase in the use of scaffolding and other access methods over recent years. Explain that the reason for scaffolding and other access methods is to provide a safe platform to work from as can be seen on this image. Scaffolding might be erected: To assist with external painting/cleaning of a building To allow replacement of windows or repairs Ask participants if they have ever had a scaffold at home and/or if they can name any other access methods. They might know: Cherry pickers or scissor lifts – often used to replace street light fitments Mobile scaffold towers – also used by painters & decorators and repair companies If there is time participants could research and find images of other access methods It may be appropriate for some participants to research Working at Heights

Each ‘lift’ is a safe working platform formed with scaffold boards This image shows the complexity of a scaffold supporting a suspended platform You might like to explain that every level/storey on a scaffold is called a ‘lift’ Each ‘lift’ is a safe working platform formed with scaffold boards Boards are also placed upright on every lift to form a ‘toe board’ this is a barrier to stop tools and materials being accidentally kicked onto people working below Scaffold design uses a lot of trigonometry (angles) and a scaffold designer has to also understand how to support loads Each scaffold pole has a specific role in supporting the whole structure and is given a label - upright poles are called standards - standards are then held in place by ledgers and transoms which are fixed at right angles to standards - Sway braces are the cross pieces which stabilise the structure - plan braces are additional supports used on bigger structures Denis Kapexhiu / Shutterstock.com

Explain that the load on a scaffold is a mixture of the number of people working on it as well as all the bricks, blocks or other materials that are stored on the platforms ready for people to use. A scaffold structure also has to withstand the weather – especially winds You might like to discuss with participants the skills they consider a scaffolder might need. Include: An ability to work at heights Attention to Health & Safety and regulations Ability to follow instructions/diagrams accurately and in the correct order Physical strength and agility Scaffold is most commonly made of steel and is very heavy (aluminium scaffold is lighter but cannot be used for huge structures as it cannot carry the same load) While assembling the scaffold scaffolders need to be able to climb up and down ‘lifts’ quickly

THE SCAFFOLDING CUBE CHALLENGE Explain that participants are now going to experience building a scaffolding cube. They are not going to use actual scaffolding pole and couplings as are shown here, but are going to use plastic waste pipe and cable ties. Explain that this simulation will give them some idea of how complex a scaffold structure can be. They will need to follow a set of instructional diagrams and work co-operatively in their small teams

Cable ties cannot be undone – they need to be cut. Explain that participants will be expected to follow Health & Safety regulations – exactly as if they were on a construction site. They must not misuse the plastic pipe and most especially must not use the cable ties for anything other than fastening the pieces of pipe together Cable ties cannot be undone – they need to be cut. The Activity Lead should ensure that they monitor closely the use and return of cable ties Mihai-Bogdan Lazar / Shutterstock.com

THE SCAFFOLDING CUBE CHALLENGE EXPLAINED Each team has a set of scaffold tube (plastic waste pipe) cut to lengths. Each length is colour coded to represent a specific piece of scaffold assembly. Each team must work through the instructions in participant brief to create a scaffolding cube. Activity Lead might choose to go through the participant brief assembly instructions with the participants. Assistance given at this stage will depend on the age and ability of the participants

Once each team has correctly assembled their scaffold cube they will be taken apart and re-assembled in a timed competition. Emphasis will be on teamwork, co-operation, following instructions and accuracy. Any Questions? Activity Lead should give a timescale to build the cube initially (suggestion is 20 minutes) Cable ties will need to be cut to disassemble the cube Suggested time for the competitive rebuild is between 10 - 20 minutes (feedback from users)

GO CONSTRUCT! Finish by asking if they have any further questions before they start the task