Operationalizing Export Certification and Regionalization Programmes

Slides:



Advertisements
Similar presentations
WTO, Trade and Environment Division
Advertisements

ISPM 6: Guidelines for Surveillance
ESTABLISHMENT OF AREAS OF LOW PEST PREVALENCE FOR FRUIT FLIES (TEPHRITIDAE) Country Consultation 2006 DRAFT ISPM: ESTABLISHMENT OF AREAS OF LOW PEST PREVALENCE.
Considerations for Developing a Phytosanitary Capacity Building (PCB) Strategy for Developing Countries by IPPC Secretariat 1.Background 2.Lessons learnt.
EMS Checklist (ISO model)
AN INTRODUCTION TO RISK MANAGEMENT GRAEME EVANS. RISK ANALYSIS –Initiating the process –RISK ASSESSMENT –RISK MANAGEMENT –Risk communication.
Checking & Corrective Action
Eradication, Containment and Contingency Planning
[Organisation’s Title] Environmental Management System
STRATEGIC PLANNING FOR Post-Clearance Audit (PCA)
Ensuring Better Services and Fair Value “Introduction and roadmap to implementation of ISO in Zambia’s water utilities” Kasenga Hara March 2015.
Environmental Management System (EMS)
EPA EMS General Awareness Training Presented by David Guest, Esq. U.S. EPA Washington, D.C.
IAEA International Atomic Energy Agency Responsibility for Radiation Safety Day 8 – Lecture 4.
Module 6 | Slide 1 of 14 January 2006 Contract Production and Analysis Section 7 Basic Principles of GMP.
The ISO 9002 Quality Assurance Management System
Obligations of the Company
Regulatory Body MODIFIED Day 8 – Lecture 3.
1.2.1 > ISPS Module ISPS Code Responsibilities
ISO 9000 Certification ISO 9001 and ISO
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
S3: Module D Physikalisch-Technische Bundesanstalt Session 3: Conformity Assessment Module D Peter Ulbig, Harry Stolz Belgrade, 31 October.
Ship Recycling Facility Management System IMO Guideline A.962
Occupational Health and Safety
Company duties under the ISM Code
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
Important informations
ISO / IEC : 2012 Conformity assessment – Requirements for the operation of various types of bodies performing inspection.
Prime Responsibility for Radiation Safety
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Regulatory Authority.
QUALITY MANAGEMENT STATEMENT
Biosafety Clearing House Training Workshop date place.
Milestones for Nuclear Power Infrastructure Development Establishment of A Regulatory Framework Gustavo Caruso, Section Head, Regulatory Activities Section.
ISM Code 2010: Part A - Implementation Malcolm Maclachlan.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
1 DIRECTORATE-GENERAL FOR ENERGY AND TRANSPORT Digital Tachograph : Information Seminar Budapest, 25-26/02/20009 Digitac.
CLAUDIA PANAIT TAIEX Expert – European Commission Legal Adviser Ministry of Health, ROMANIA.
The International Plant Protection Convention (IPPC) ISPMs adopted in 2008 and draft ISPMs proposed for adoption in 2009 Julie Aliaga, International Standards.
INFORMATION SESSION ON PHYTOSANITARY REGULATIONS IN GRAIN IMPORTS.
1 The WTO Agreement on Technical Barriers to Trade Basic Concepts and Member Obligations.
Technology Services – National Institute of Standards and Technology Conformity Assessment ANSI-HSSP Workshop Emergency Communications December 2, 2004.
Oversight “The NPPO of the exporting country has the responsibility for ensuring that systems for exports meet the requirements …”
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 6 CH 5 ISO MANAGEMENT RESPONSIBILITY Philippe Bauwin Medical.
Responsibilities of Test Facility Management, Study Director, Principal Investigator and Study Personnel G. Jacobs Belgian GLP Monitorate Zagreb, 17 December.
Systems Approach Concept and Application 24º Technical Consultation among ORPF, August 2012 Maria Inés Ares President of Directive Committee.
National Food Control Systems
ISO/IEC
The International Plant Protection Convention
Overview of the WTO SPS Agreement and the role of
UNIT V QUALITY SYSTEMS.
ISPM 8: Pest Status of on Area
Establishing the Infrastructure for Radiation Safety Preparatory Actions and Initial Regulatory Activities.
DNV experiences and viewpoints
The International Plant Protection Convention
International Standards on Phytosanitary Measures (ISPMs)
IPPC first consultation 1 July to 30 September 2018
Communication and Consultation with Interested Parties by the RB
GHANA’S EXPERIENCE IN PREPARING FOR THE ePHYTO SYSTEM
Regional Seminar for OIE National Focal Points on Animal Production Food Safety Importance of collaboration between the Veterinary Services and industry.
Regulatory Infrastructure and Transport Safety Section
EMS Checklist (ISO model)
The Role and Relationship of Scientific and Official Information
Role of Industry Self-regulation in Phytosanitary Compliance
Module 5 Liaison and Managing Relationships with Stakeholders
How to conduct Effective Stage-1 Audit
Basic information on NROs 7-8 September 2018, Moscow, Russia
EU Food Safety Requirements: - Hygiene of Foodstuffs -
Module 9 Staff Training and Capacity Development
Draft revision of ISPM 6: National surveillance systems ( )
Aerodrome Certification Workshop
Presentation transcript:

Operationalizing Export Certification and Regionalization Programmes NPPO Operations Module 4 Operationalizing Export Certification and Regionalization Programmes

Module 4 What will I learn? The obligations of the NPPO regarding the core activities of export certification and regionalization programmes, including: Legal authority Administrative and operational responsibilities Resources and infrastructure Document and record-keeping Communication Establishment of PFAs and ALPPs

Export Certification IPPC Article V.1 states each contracting party shall make arrangements for phytosanitary certification, with the objective of ensuring that exported plants, plant products and other regulated articles and consignments thereof are in conformity with the certifying statement in the model phytosanitary certificate of the IPPC.

Export Certification Certifying Statement (ISPM 12, 2015): This is to certify that the plants, plant products or other regulated articles described herein have been inspected and/or tested according to appropriate official procedures and are considered to be free from the quarantine pests specified by the importing contracting party and to conform with the current phytosanitary requirements of the importing contracting party, including those for regulated non- quarantine pests.

Export Certification The system includes several components Legal authority Administrative and operational responsibilities Information on phytosanitary import requirements Resources and infrastructure Documentation and record keeping Communication Review

Export Certification Legal authority Phytosanitary legislation clearly provide this authority. No other authority is responsible for export certification. Responsibilities are as indicated in Article IV .2 (a) of the IPPC.

Export Certification Administrative and operational responsibilities Non-governmental personnel may be authorized by the NPPO to perform specified certification functions, with the exception of issuing phytosanitary certificates. Such personnel should be qualified and skilled.

Export Certification Administrative and operational responsibilities Identify and register users (producers, exporters and re- exporters). Establish a close working relationship with users. Put into place a management system that ensures that all legislative and administrative requirements for phytosanitary certification are satisfied.

Export Certification Requirements for a certification system A person or office is responsible for the system. Duties and communication channels of all personnel involved are clear. Sufficient personnel with appropriate qualifications, skills and resources are available. Adequate and sustained training is provided.

Export Certification Actions required for a certification system Identify, approve and establish legally binding relationships with third party service providers. Make customs and handlers aware of their roles in maintaining the phytosanitary integrity and security of consignments in the exporting country.

Export Certification Information on phytosanitary import requirements Check phytosanitary import requirements on export documentation to verify that they are valid and current. All personnel involved in certification should have adequate technical information on regulated pests in the importing countries. Control over the certification process and who issues certificates.

Export Certification Information on phytosanitary import requirements Documented procedures are in place for phytosanitary certification. Adequate equipment, materials and facilities are available to carry out sampling, inspection, testing, treatment and other phytosanitary certification procedures.

Export Certification Documentation A system for recording the relevant procedures and maintaining records to: Trace phytosanitary certificates and the related consignments and their parts Verify compliance with the phytosanitary import requirements

Export Certification Documentation Procedures and guidelines are needed for specific activities including: Inspection, sampling, testing, treatment and verification of the identity and integrity of consignments Maintaining security over official seals and marks Ensuring trace-back of consignments, including their identification and phytosanitary security (as appropriate) through all stages of production, handling and transport prior to export

Export Certification Documentation Procedures and guidelines are needed for specific activities including: Investigating notifications of non-compliance Investigating invalid or fraudulent phytosanitary certificates

Export Certification Record-keeping For each consignment requiring phytosanitary certificates: Inspection, testing, treatment and verification are carried out. Samples are taken. Names of the personnel who undertook these tasks are recorded. The date of the inspection is recorded.

Export Certification Record-keeping All results are recorded. Information is recorded in non-compliant consignments for which phytosanitary certificates were not issued. Copies of phytosanitary certificates are kept for validation and trace-back for at least one year.

Export Certification Communication Pest status, import requirements of importing countries and operational procedures are communicated to all relevant stakeholders. When necessary, official communication will take place between contact points or alternative designated contacts. The NPPO of the importing country is informed as soon as possible of a consignment that may not have complied with phytosanitary requirements.

Exercise 4.1 Does your NPPO have the necessary, legal, administrative, operational and technical elements in place for an effective export certification system? Identify the areas in your export certification system where improvements can be made.

Regionalization The status of regulated pests in an area can be changed through the combined result of a number of measures, creating opportunities for a country to negotiate market access.

Regionalization Regionalization measures include: Establishment, maintenance and surveillance of pest free areas (PFAs), pest free production sites (PFPS) and pest free places of production (PFPP) Pest eradication Establishment of areas of low pest prevalence (ALPP)

Regionalization: Important considerations Financial feasibility Undertake a cost-benefit analysis to assess the cost of systems and activities: Establishing pest freedom Maintaining pest freedom Managing the maintenance of product identity and phytosanitary security of the consignment

Regionalization: Important considerations Technical feasibility Type of pest to be regulated Type of crops Cropping pattern, host plants and the spread of pests in the targeted area Possible physical and other barriers that may affect the establishment of pest free status

Regionalization: Important considerations Technical feasibility Measures to establish and maintain pest freedom Legal and administrative requirements for establishing and maintaining pest freedom Availability of inputs to carry out the PFA programme and reliability of supply

Regionalization: Important considerations Environmental impact assessment Determines the potential environmental effects of a PFA or an ALPP with regard to: The physical environment Natural enemies and other species Removal of host species and their impact

Regionalization: Establishing a PFA or ALPP To establish a PFA or ALPP, the NPPO: Identifies the crops to be protected Determines the pest(s) to be regulated Determines the area to be regulated Identifies the stakeholders that will be affected by regulating the pest(s)

Regionalization: Establishing a PFA or ALPP To establish a PFA or ALPP, the NPPO: Determines a sustainable funding mechanism Determines the technical requirements of the programme Procures the necessary equipment and supplies Considers the logistics of the operation

Regionalization: Establishing a PFA or ALPP To establish a PFA or ALPP, the NPPO: Establishes an implementation plan Ensures necessary legislation is in place to support all regulatory aspects of the programme Provides a robust documentation system to support the declaration and recognition of the PFA or ALPP once established

Regionalization: Establishing a PFA or ALPP On establishment of the programme, the NPPO: Designates a point of contact for the recognition process Requests recognition by the importing country of the PFA or ALPP Provides appropriate information to the importing country in support of the programme Provides additional information if necessary for recognition Helps organize on-site verification visits, if requested by the importing country.

Regionalization: Establishing a PFA or ALPP Maintenance Establish a programme to maintain or suppress pest freedom. Develop a protocol to respond rapidly and decisively to any re-introduction. Record keeping All actions undertaken in support of a PFA, PFPP, PFPS or ALPP programme should be well documented for review and audit purposes.

Regionalization: Establishing a PFA or ALPP Review and audit Have a system in place for performing internal audits or performance reviews of the programme.

Exercise 4.2 What crops and pests are likely candidates for a PFA/PFPP/PFPS/ALPP programme in your country? Describe the steps you would take to establish such a programme.