Changing Environment (CE) Road Map & Costs JPICH Coordination Office

Slides:



Advertisements
Similar presentations
CO-REACH Social Science Research Presentation on CO-REACH pilot call for ILN Meeting Brussels 24 September 2009 Anouk Tso Royal Netherlands Academy of.
Advertisements

TEN-T Info Day for AP and MAP Calls 2012 EVALUATION PROCESS AND AWARD CRITERIA Anna Livieratou-Toll TEN-T Executive Agency Senior Policy & Programme Coordinator.
1 Joint Programming Initiative (JPI) on Cultural Heritage and Global Change Heritage Plus Call Launched 3 rd March 2014.
NEW CoEs STRATEGY. CoE CoEs Network Why? Changing sector environment New capacity building responses When? WTDC-10 Resolution 73 What? New CoEs strategy.
Anglia Ruskin University European Preparatory Visits Grants Scheme.
Culture Programme - Selection procedure Katharina Riediger Infoday Praha 10/06/2010.
Info Day on New Calls and Partner Café Brussels, 10 February 2011 How to apply: Legal Framework – Beneficiaries – Application and Selection Procedure.
APRE Agency for the Promotion of European Research Lifecycle of an FP 7 project Caterina Buonocore Riga, 13th September, 2007.
STSM guide COST Action FP Fibre suspension flow modelling... 1 COST Action FP1005 Fibre suspension flow modelling - a key for innovation & competitiveness.
Hosting EPOS components Executive & Coordination Office and Integrated Core Services Elisabeth Kohler, CNRS-INSU France EPOS IAPC 19/09/ Rome.
Hans INGVARSSON, edited by Martin Steward for CEDR TGR 22 Jan 09 ERA-NET ROAD CEDR TGR meeting 22 nd of January 2009, Brussels ENR Work Package 6 - Progress.
1 THE CITY OF TOMORROW AND CULTURAL HERITAGE Thierry PROST EUROPEAN COMMISSION - DG RTD Directorate I - Preserving the Ecosystem Tel: +32/2/ Fax:
3rd WG meeting, Brussels Proposed Plan for Governance of the Washington Group Prepared by: Jennifer Madans, Barbara Altman, Beth Rasch (USA); Renée Langlois.
Dr. Marion Tobler, NCP Environment Evaluation Criteria and Procedure.
2nd Meeting Rome, 22nd March JHEP Coordination Action in support of the implementation of a Joint Programming Initiative.
ACTIONS AT NATIONAL LEVEL Proposal on criteria to choose ERFP activities/projects on national (sub-regional) level Elżbieta Martyniuk on behalf of the.
Information session first joint ERANID call (Task 5 DOW) Belgian Science Policy Office 30 September 2015.
Example of real co-funded call: JPND Rainer Girgenrath DLR-PT (Germany)
Structural Funds Managing Authority – Ministry of Finance 1 Technical Assistance Ilze Aleksandroviča Head of Control and Development Division EU Funds.
© Enterprise Europe Network South West 2009 The Eurostars Programme Kenny Legg R&D Funding for the Environmental Sector – 29 June 2010 European Commission.
Cultural Heritage and Global Change: a new challenge for Europe Working for strengthening the European Research Area Towards Joint Programming in Research.
STSM guide COST Action FP Fibre suspension flow modelling... 1 COST Action FP1005 Fibre suspension flow modelling - a key for innovation & competitiveness.
Status of the first joint call “Extended Working Life and its Interaction with Health, Wellbeing and beyond” WP 2 of J-Age II Wenke Apt 13th General Assembly.
Two intense and fruitful years... Paolo Maria Rossini 15th General Assembly Meeting of JPIMYBL, 21, 22 January 2016 BELSPO, Brussels.
WP6 – Monitoring and Evaluation 17th November 2014 Rome.
Work Package 2 „Implementation of the SRA” Call secretariat Annette Angermann & Wenke Apt Rome, 11 June 2015.
Interreg Europe Elena Ferrario
WP8 Project management Milan Gocić University of Niš
National Science Centre funding schemes
WP3 - Evaluation and proposal selection
Janusz Sierosławski, Jacek Moskalewicz
Overall guidelines for partners By Silvia Celani
Call for Transfer networks September 2017
PRAG PRACTICAL GUIDE TO CONTRACT PROCEDURES FOR EXTERNAL ACTIONS
United Nations Development Programme
PRAG PRACTICAL GUIDE FOR CONTRACT PROCEDURES
The Eurostars Programme
Infravation Consensus Meeting Sept 2014
eMENTHE – Developing Master’s level eLearnig Material in mental health
Sustainable and Liveable Cities and Urban Areas
Sustainable and Liveable Cities and Urban Areas
Sustainable and Liveable Cities and Urban Areas
Infravation Consensus Meeting March 2015
KNPS Korea National Parks Service South Korea
XIV PA7 Steering Group Meeting June 13, 2018 Bratislava WG 3 DFCN MULTILATERAL SCIENTIFIC AND TECHNOLOGICAL COOPERATION IN THE DANUBE REGION MSTC_DR.
SOCIAL DIALOGUE WITHIN EUPAN
Passenger Mobility Statistics 21 May 2015
TOP6 – WP4 Coordination and Management JPICH Coordination Office
Interreg IPA CBC Programme "Greece - Albania "
HERITAGE PLUS – Management Group Meeting
Governing Board Meeting Anabel de la Peña
TOP 3: The JPI CH future strategy within the GPC Working Group
TOP 4: WP 2 - Implementation of joint activities including joint calls
Dr. Katja Šnuderl, Contract manager
JHEP 2 WP 2, Rome (Italy), November 2017
WP2. ARIMNet2 2nd call ARIMNet2 Governing Board Meeting
Heritage in Changing Environments - CE JPICH Coordination Office
JHEP 2 WP 2, Rome (Italy), November 2017
SOCIAL DIALOGUE WITHIN THE SCOPE OF EUPAN
REPORTING ON DELIVERY OF EU BIODIVERSITY ACTION PLAN
Steering Committee, Eurostat, Luxembourg, 4 February 2011
Current state & Prospects of implementation
Collecting methodological information on regional statistics
WP 1 Management and Coordination
EU legislation on noise emission in the environment by equipment for use outdoors: latest developments September 2018 European.
TOP6 – WP4 Coordination and Management JPICH Coordination Office
Introduction of “Sustainable and Liveable Cities and Urban Areas” Programs Co-Sponsored by NSFC and JPI UE Yang Liexun Management Sciences Department(DMS)
11th Steering Group Meeting 28th October, Ulm
Item 11 Preliminary results of the second phase of the Cost analysis of European Statistics (by products) in the ESS Walter Sura, A.2 – Strategy and.
Jella Kandziora, JUELICH Oslo, January 29th, 2019
Presentation transcript:

Changing Environment (CE) Road Map & Costs JPICH Coordination Office JHEP2 Steering Committee meeting JHEP2 Fifth Meeting Rome, 13rd June 2018 JHEP2 TOP4 – WP2 Implementation of other joint activities including joint calls Changing Environment (CE) Road Map & Costs Task 2.1 call Task 2.3 other joint action Patrizia Bianconi JPICH Coordination Office

JPICH call on: Heritage in Changing Environments Part. Countries: 11 Countries (Belarus, Cyprus, Czech Republic, Ireland , Italy, Latvia, Lithuania, Norway, Poland, The Netherlands and United Kingdom) Call Budget : 4.6 M€ (National Funding) Funding Schema : Virtual common pot Topics: 1. Changing physical environments 2. Changing social and economic environments 3. Changing political and cultural environments JHEP2 Fifth Meeting Rome, 13rd June 2018

CALL TIME TABLE Procedure Schedule Launch of the JPICH Call “Heritage in Changing Environments” 04 September 2017 Deadline for submission of proposals 30 November 2017, 14:00 CEST General Eligibility check 04 – 14 December 2017 National Eligibility checks 18 December 2017 – 14 January 2018 Evaluation of proposals by independent external peer reviewers January – March 2018 Independent International Assessment Panel meeting 3nd week April 2018 Funding decision Middle May 2018 JPICH Heritage in Changing Environments projects start June – November 2018

PRE LAUNCH CALL ACTIVITIES Collect all the National eligibility requirements Circulate the Heritage in Changing Environments call MoU Collect eventually MoU comments/integration Sign the MoU by all participants - End of November 2017 JHEP2 Fifth Meeting Rome, 13rd June 2018

Content of the Heritage in Changing Environments MoU As for the Digital Heritage the maximum JCS and JPS handling costs are calculated at 5% of the final total call costs. Handling costs will be shared by the JPICH CE Parties in a fair way, i.e. the share of costs will be related to the actual share of funds nationally committed to funding JPICH CE project. JHEP2 Fifth Meeting Rome, 13rd June 2018

Content of the Heritage in Changing Environments MoU To cover for these costs Parties are expected to make additional funding available. It is however recognized that some Parties can only contribute to these costs in kind. Parties may offer: to host and pay for the meeting facilities for the JPICH CE CEMG meetings; to provide additional assistance in formulating the JPICH CEMG meeting minutes; to host and pay for the meeting facilities for the JPICH CE International Assessment Panel; JHEP2 Fifth Meeting Rome, 13rd June 2018

Content of the Heritage in Changing Environments MoU to provide additional assistance in carrying out the remote peer review process; to provide additional assistance in running the JPICH International Assessment Panel meeting; to pay for travel and subsistence costs of International Assessment Panel members; to take care of the management of the progress reporting and evaluation of JPICH CE projects (act as the JPS). JHEP2 Fifth Meeting Rome, 13rd June 2018

JPICH Heritage in Changing Environments call Submitted proposals followed the national eligibility check by the funding Partners based on national funding rules. Number of submitted proposals 42 Number of eligible proposals 39 JHEP2 Fifth Meeting Rome, 13rd June 2018

TIME TABLE OF THE CALL General check + National eligibility evaluation Deadline for proposal submission 30 November 2017 General check + National eligibility evaluation 08 December – 14 January 2018 Remote Evaluation of proposals by expert End of January – 30 May 2018 (instead 30 March) JHEP2 Fifth Meeting Rome, 13rd June 2018

Independent expert for remote evaluation The existing JPI CH database of independent international experts was updated. All the Funding Partners were involved in searching for additional independent international experts according to the topics of the Proposals. 88 remote evaluators were used. No fees for their activities To support the remote evaluation process, the following documents were sent: Guidelines for applicants Guidelines for evaluation Evaluation reporting form (including check of conflict of interest) Declaration of Confidentially JHEP2 Fifth Meeting Rome, 13rd June 2018

ROAD MAP FOR EVALUATION PROPOSALS Remote evaluation by independent international peer reviewer experts 8 June 2018 – 30 June 2018 International peer review Panel meeting 02-03 July 2018 Management Group meeting for funding decision July/Sep 2018 ?? JHEP2 Fifth Meeting Rome, 13rd June 2018

Independent Peer Review Panel Members S. Kalevicijus: University of Vilnius, Lithuania - Antropology Andreas Rauber: Vienna University, Austrian-Digital Przemyslaw Urbanczyk: CardinalWyszyński University and Polish Academy of Sciences, Poland - Archeology Sara Van Rompaey: E.ARChitects Energy Efficient Architecture Renovation Conservation, Merelbeke, Belgium - Architecture Matthias Burgei: Swiss Federal Research Institute WSL - Landscape Anthi Kaldeli:  University of Cyprus , Cyprus, - Maritime Heritage Maria Elena Corrado: ISCR, Italy – Architecture, Urban planning Dina D’Ayala: Univerisity College London, UK - Risk management and assestment JHEP2 Fifth Meeting Rome, 13rd June 2018

Independent Peer Review Panel activities The international peer review panel, during the meeting agreed upon a final consensus report and scored each proposal, following which a ranking list was determined. Following EC rules the outcome of the independent international peer review was a report recording, principally: An Evaluation Summary Report (ESR); A list of proposals passing all thresholds, along with a final score for each proposal passing the thresholds and the panel recommendations for priority order. A list of evaluated proposals having failed one or more thresholds; A list of any proposals having been found ineligible during the evaluation by experts; A summary of any deliberations of the panel. JHEP2 Fifth Meeting Rome, 13rd June 2018

Management call – budget for cash costs Items of costs Euro Platform adaptation for submission proposals C&E 4.000 Fees for Independent evaluators (1.000 x 8) 8.000 Travel and accommodation 6.000 2 Meetings facilities (catering ) 2.000 Total 20.000 We will have a precise table of costs in July (after the Independent Panel Meeting). Please send to Handling Partner (MiBACT) by 30 September 2018 JHEP2 Fifth Meeting Rome, 13rd June 2018

THANKS JHEP2 Fifth Meeting Rome, 13rd June 2018