Tuesday Access for RF & QPS (others in the shadow) until ~18:00.

Slides:



Advertisements
Similar presentations
PROFIBUS controller problem (SEU) on cryo valve on DFBMH (600 A circuit RQ6.L7B1/2). Loss of cryo maintain ==> Beam dump. End of fill #1975 after ~2.5.
Advertisements

21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
Summary of Week 30 G. Arduini, J. Wenninger Main aims: “Adiabatically” increase peak luminosity by emittance reduction Luminosity production.
Monday :00 Injection for physics fill # :00 Stable beams fill #1816, luminosity ~1.2x1033 cm-2s-1 11:08 Beams dumped. QPS trigger on detector.
Tuesday 24 th July - morning 10:15 Operator dump of fill 2873  Initial luminosity: 5.83e33 cm-2s-1  12 hours stable beams  151 pb-1 delivered  Initial.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Wed 27/7 – Thu 28/7 09:00 LHC Controls problems
Saturday :12 Stable beams fill 3351 Initial luminosity
Friday 15th June 01:11 Injection.
Summary Friday h38: Ramp down and pre-cycle.
Wed :55 Fill 2653 stable beams 1.40e11 ppb, cm-2s-1peak lumi, 11.6 pb-1 total lumi delivered. 09:31 Dumped by collimator interlock:
Monday fill with 1092 bunches (6 h stable beams)
Monday 11/07: Recovery Plenty of accesses.
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Saturday 12:00 Fill 1992 in stable beams.
Summary of Week 11: 14 – 21 March
LHC Status Su Morning 17-April R. Assmann, B. Holzer et al
Fri 29/7 – Sat 30/7 09:00 End of fill 1990, PC trip RCBXV3.R1 (likely SEU on QPS). Integrated Luminosity: 41 pb-1. Access for MKI2 main switch replacement.
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Note: squeeze in Atlas, CMS, LHCb and Alice on going
Scrubbing progress - 09/12/2012
Friday 31st August & night
Friday day 00:51 Fill #1862 Beams lost to inner triplet skew quad power converter fault. Delivered lumi 33 pb-1 Access required for repair RQSX3.L1 converter.
Thursday 10th May - morning
LHC Morning Meeting - G. Arduini
Sunday morning Recovering from 400 kV disturbance.
Chromaticity can make a difference…
Friday :00 machine setup for luminosity run. Better b-to-b stability from injectors. 01:58 stable run with 228 bunches 11:00 luminosity leveling.
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Finally.... We had to wait a long time.... We had many problems....
Tuesday 22 November 2011.
Friday Morning 7:30 injection for fill 2908
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Tuesday morning 09:30 Beam dump, SIS dump due to lost connections with FCG FECs. Coincides with starting a development SIS server to test new interlocks.
Wednesday 10/5 Cryo recovery until 18:30
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Thursday morning 08:45 Stable beams fill 2855 for ATLAS/CMS VdMs.
Monday 14:00 beam dump Access:
Thursday Fill 1364 (24 bunch) dumped at 07h
Friday 07:00 Fill 1729 dumped. Movement device allowed flag switching to FALSE. From the logs, it seems the energy went to FFFF/7860 GeV. To be confirmed.
Fill 1743 Peak luminosity ~6.7 e32 Integratated lumi ~20 pb-1
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
07/08/2010 Fill #1264 dump at 02:14:38.
Thursday 22 September 2011.
Friday morning 08:00 Stable beams with 840b.
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Sat 15/10 New record bunch population profiting of the scrubbing period on Friday. Nb~1.42x1011p/bunch  110 MJ at 3.5 TeV. Filling slowed down by ZS sparking.
Wednesday 16th May 03:05 beam dump, RF fault crowbar problem on module M1B2 06:09 Another crowbar at injection. Access for RF; problem Beam Imminent Warning.
Wednesday 6th April Injection of 50 ns up to 108 bunches (3 x 36).
Saturday 24 September 2011.
Coordination: Eva Barbara Holzer, Mike Lamont
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Thursday 20th July - morning
Friday h55 Stable beams. Fill #1841. Lumi ~1.2e33.
Tuesday 24/5 Fill # :00 Stable beam fill # bunches
Monday 27th August & night
Wednesday 26 October 2011.
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Tuesday 6th April 8:00 Injection studies 16:00 RF studies
Saturday Luminosity production 1380 bunches
Saturday 26 November 2011.
Tuesday
Thursday 10:00 Fill 1986 in stable beams.
Presentation transcript:

Tuesday Access for RF & QPS (others in the shadow) until ~18:00. Filters installed for crowbar control electronics on 3 out of 4 RF modules (one was already installed) to avoid spurious trips S12 trip: power supply failure on old QPS system (MQ). RCO/RCD/RCS in S56: replacement board in place. RQTL7.R7.B1: 2 attempts with new boards failed. Went back to original board as it seems to be operational. Increased gauge interlocks from 4e-7 mbar to 2 10-6 mbar behind the TCPs (V. Baglin). We have been running within a factor 2 of the interlock limit in the past few days (start of stable beams). When attempting to refill at 18:00, discovered problem on LBDS system – new access. LBDS/Beam2 - Safety fault on generator MKD C (UA67) Siemens PLC board broken - changed successfully. 2/17/2019 LHC 8:30 meeting

RCO/RCD/RCS in S56 problem R. Denz and M. Zerlauth have understood the issue. New sort of ‘X-talk’ among 600 A circuits. Event sequence: Trip of RCO (not beam interlocked by PIC)  triggers trip of RCD by EMC (not beam interlocked by PIC). So far so good… But after 6 minutes, automatic reset of the QPS controller (after trip)  triggers a trip of RCS (part of the same controller) which is beam interlocked by PIC  end of the beam. 2/17/2019 LHC 8:30 meeting

Tuesday evening/night Switch LHCb polarity (to ‘good’ one wrt machine) to increase separation at closest encounters around IP8. A possible issue with the losses correlated to IP8 leveling could be the closest parasitic encounters. 1380 filling scheme has encounters (12b train) at +-3.7 m – not so good. Steering needed on the injection lines (B2) – then clean filling. Emittances at injection ~1.6-2 um, very uniform. Blow-up in the SPS essentially off now. SPS emittances 1.6-1.7 um. 2/17/2019 LHC 8:30 meeting

Finally… 2/17/2019 LHC 8:30 meeting

Lifetimes B1 lifetime still lower than B2. No dips during optimization / leveling. Maybe slightly better than previous fills (factor ~2) – tbc. 2/17/2019 LHC 8:30 meeting

Previous fills lifetime Past few fills (So-Mo) all exhibit a second lifetime dip duration optimization. 2/17/2019 LHC 8:30 meeting

Luminosity driven losses @ 20% of long RS thresholds Vac. activity /losses in IP8 look better for this fill – to be confirmed. Luminosity driven losses @ 20% of long RS thresholds 2/17/2019 LHC 8:30 meeting

Fill lost on electrical glitch at 06:00. 13 pb-1. Same thing again…but at the moment vacuum problem on the SPS injection kicker. 2/17/2019 LHC 8:30 meeting

Losses vs bunch id – few minutes after collisions G. Papotti IP 1 5 8 IP 1 5 IP 8 only IP 1 5 2 IP 1 2 5 8 2/17/2019 LHC 8:30 meeting

Losses vs bunch id (Mo, lost before SB) IP 1 5 8 IP 1 5 IP 8 only IP 1 5 2 IP 1 2 5 8 2/17/2019 LHC 8:30 meeting

Losses vs bunch id (Mo night) IP 1 5 8 IP 1 5 IP 8 only IP 1 5 2 IP 1 2 5 8 2/17/2019 LHC 8:30 meeting