2015 AOUC committee Phil Perillat

Slides:



Advertisements
Similar presentations
AOUC committee 03APR14 Telescope status & RFI 2014 AOUC committee Phil Perillat.
Advertisements

RFI in the alpha band pass Murray Lewis N A T I O N A L A S T R O N O M Y A N D I O N O S P H E R E C E N T E R Senior Research Associate Radio Astronomy.
LIGO-G D 1 S3 expectations, S2 calibration M. Landry LHO CW Search Group F2F Milwaukee, Jun
AUSAC Meeting · March 17&18, 2008 FPGA SPECTROMETER COMMISSIONING Spectrometer description How it will be used Where we are at. What needs to be done More.
Puerto Rican Spectrum Users Group Sept 23, 2010 Living with RFI at AO (aka rfi snooping) Puerto Rican Spectrum Users Group 23sep10 meeting Phil Perillat.
ALFA Surveys Workshop: december 2009 CIMA STATUS Rfi update 2009 ALFA Surveys Workshop Phil Perillat.
NAIC AUSAC Committee Meeting · March Telescope Performance and Datataking 2009 AUSAC Committee Meeting Phil Perillat.
APRPP review committee 24oct13 Telescope status 2013 APRPP review committee Phil Perillat.
NAIC Visiting Committee Meeting · April Telescope Performance and Datataking 2009 Visiting Committee Meeting Phil Perillat.
Pulsar surveys at Arecibo and Green Bank David Champion Gravity Wave Meeting, Marsfield, Dec 2007.
AUSAC Meeting 9-10 March 2009 RFI & Spectrum Management Murray Lewis.
AOUC committee 30apr15 RFI issues at AO 2015 AOUC committee Phil Perillat.
RFI in the alpha band pass Murray Lewis N A T I O N A L A S T R O N O M Y A N D I O N O S P H E R E C E N T E R Senior Research Associate Radio Astronomy.
Windows Server 2008 R2 Oct 2009 Windows Server 2003
Jan 2016 Solar Lunar Data.
IT Strategy Roadmap Template
Monthly Report For January 2017
MWA “burst mode”: Nov 2008 Solar 32 T Observations
Sine Equation on TI.
2015 NanoGrav meeting Phil Perillat
Q1 Jan Feb Mar ENTER TEXT HERE Notes
MAIN 220 Equipment Installation
Erin W Gunner H Anna D Shane C Carly L Shane S. Mentor: Sean

Average Monthly Temperature and Rainfall
ABT & Frequency.
2018 Flag Calendar Online Registration is open




2017 Jan Sun Mon Tue Wed Thu Fri Sat


Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Telescope Performance and Datataking
Proposed Strategic Planning Process for FY 2013/14 thru FY 2015/16

Calendar Year 2009 Insure Oklahoma Total & Projected Enrollment
2018 Flag Calendar Online Registration is open
Jan Sun Mon Tue Wed Thu Fri Sat
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March



©G Dear 2008 – Not to be sold/Free to use

Electricity Cost and Use – FY 2016 and FY 2017
Center for Vision (CVN) on Block 33 Move Planning & Logistics Timeline


©G Dear 2010 – Not to be sold/Free to use
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE


Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Midnight calibration errors on MTSAT-2

2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Presentation transcript:

2015 AOUC committee Phil Perillat RFI issues at AO 2015 AOUC committee Phil Perillat

Talk Outline Lband radars Sband rfi Online: http://www.naic.edu/~phil/talks/talks.html apr15 aouc

Lband radars seen by AO Radar Info FAA radar Old 1330,1350 – no blanking New:1252.1258,1344,1350 (CARSR) blanks 4 degs in AO direction Punta Borinquen radar Old : 1270 or 1290 New:1269,1276,1327,1333 (CARSR) Blanks 4 degs in AO direction Punta Salinas radar Frequency agile radar Old:1232,1247,1242,1256 (ModeA) New:1228,1243,1279,1294 blanks 30 deg in AO direction Aerostat radar balloon 1246,1261 line of site to dish makes it extremely strong. They blank +/-21 degrees in AO direction

Radar changes/problems The FAA and PuntaBorinqen radars were replaced by CARSR (Common Air Route Surveillance Radar) Punta Borinquen upgraded: Apr 2013 FAA upgraded: Aug 2013 Run by FAA but only used by DOD,DHS. They are blanking the radars +/- 2 degrees toward AO. We needed a memo from DoD,DHS to get the blanking. The Aerostat radar was off the air Dec 2011 to Apr 2014 ( the support cable broke, balloon crashed). It’s now back up. Radar Freq Bandwd Duty cycle Sector Blanking Dist nmi Old FAA 1330,1350 .2 Mhz .5% no 57 CARSR FAA 1252.4,1257.6 1344.4,1349.6 1 Mhz chirped 9% Yes (01nov14) +/-2 deg Old Punta Borinquen 1270 or 1290 24 CARSR PuntaBor. 1269.4,1274.6 1327.4,1332.6 Chirped Yes (01oct13) +/- 2 deg

Punta Salinas radar Punta Salinas is a freq. Agile phased array radar Apr 15 upgrading from 18 to 100 dual freq channels. They will no longer xmit freq close to other radars on the island MOU: when AO uses lband, they use 2 dual freq channels (called modeA). We’ve had some trouble with this, especially during upgrades.

Hilltop rfi monitoring:Lband 1 min. peak hold spectra.. Spectrum analyzer on hilltop. Compare radar frequency usage: Top: 29may09: Bottom:27apr15 Dynamic spectra shows Punta Salinas in modeA Dec 2014: mode A when AO uses lband July 2014: not going to modeA Had trouble with their radar. Jul,Aug14

Pulsar searching with radars Vicki and Patrick provided me with the zaplists from the palfa search. The lists count the number of times interfering periodicities appear in the pulsar search analysis (by day). I modelled the periods that the various radars should create and then overlaid them on plots of the zaplists. The first set shows 2011 (before the CARSR) The 2nd set is jan-jun 2014 (with the CARSR) Note: The zaplists also helped us find a problem in the bias monitoring of alfa. It was generating 20ms periods.

Sband rfi Hilltop plots:average spectra for 1 day 2010,2011,2012,2013,2015 This is only a single day so rfi can change. A more detailed look at AWS plan. 2110-2155 Mhz notched filter on order. Sbw band showing AWS and intermods Sbw band with projected filter overlayed Should receive filter in a week or two.

Summary 1 lband radars ideas to explore with radar owners Don’t ignore AO agreements during upgrades/repairs. Officially contact AO ahead of upgrades Punta Salinas. If they can’t go to modeA for any reason, could they shutdown for that period? Radars run by:DoD,DHS,FAA Each with a different mission. Need more sharing of data between them. They interfere with us and with each other. When Punta Salinas and FAA point at each other, they are blinded. If one would blank, the other could distribute the data. But they don’t….

Summary 2 Radars run by:DoD,DHS,FAA AO blanker: If better sharing of data, could we reduce the number of radars??? (and save the gov $ running so many). This would require meetings at a higher level AO blanker: Looking into feasibility of blanking some of these radars. At first look seems hard. CARSR’s drop 5 ipps every about 300 secs.

Summary 3 Sband rfi Get notched filter installed. Questions?