The role of CDM in technical change in refrigeration - current CDM regulations - successful CDM projects and methodologies - failed projects and methodologies.

Slides:



Advertisements
Similar presentations
Ongoing discussions on the formulation of National Appropriate Mitigation Actions (NAMAs) and their possible inclusion as market mechanisms in a post-2012.
Advertisements

Paulo Manso CDM EB September, 2011 Proceeder for Submission & Approval Standardized Baselines.
Technology Transfer in the CDM DUAN Maosheng Tsinghua University Linking Climate Mitigation Policy and Modeling in China Workshop February 18, 2006 Beijing.
1 KYOTO PROTOCOL: UPDATE ON ACTIVITIES OF THE AD HOC WORKING GROUP ON FURTHER COMMITMENTS FOR ANNEX I PARTIES UNDER THE KP. PRESENTED BY SETH OSAFO AMCEN.
Hamid Dom Reg WS March 04 1 INTRODUCTION THE GATS and DOMESTIC REGULATION.
EUROPEAN COMMISSION Objective 3 Territorial Co-operation Workshop 1: Cross-border co-operation DG Regional Policy Brussels, 21 February 2005.
European Union Cohesion Policy
Panel discussion Low Carbon Generation Technology
T HE W ORLD B ANK C ARBON F INANCE U NIT I MPROVING SMALL SCALE TRANSPORTATION METHODOLOGIES : L ESSONS FROM E GYPTIAN VEHICLE SCRAPPING P O A. P RESENTATION.
BASELINE STANDARD UNFCCC secretariat workshop
1 Kai-Uwe Barani Schmidt Secretary CDM Executive Board Clean Development Mechanism Carbon Forum America 26 February 2008.
Durban Decisions on the Clean Development Mechanism DUAN Maosheng Chair of the CDM Executive Board First SDM Joint Coordination Workshop Bonn,
Regional Distribution
UNFCCC secretariat, Sustainable Development Mechanisms Verónica Colerio, Standard Setting Unit Standardized Baselines in the CDM: Decisions and Way Forward.
UNFCCC secretariat, Sustainable Development Mechanisms Programme Conor BARRY Improving and demonstrating efficiency in CDM processes 7 th Joint Coordination.
CDM Regional Distribution Ensuring Broader Participation in the CDM Presented by: Albert Altarejos MAGALANG DNA Forum Chairing Committee.
Defining Standardized Baseline: The role of DNAs Malin Ahlberg Co-Chair of the DNA Forum 13 March 2011, Bonn.
Implementation of the Suppressed Demand Guidelines in New and Existing SSC Methodologies Carolyn Luce, Small Scale Working Group Member FIRST SDM JOINT.
Cape Town, May 2010 Luz Aurora ORTIZ SALGADO Ministry of Energy MÉXICO Energy efficiency in Mexico A Program for the Replacement of Home Appliances.
1 Development and Transfer of Technologies under the UNFCCC The Marrakech Accords & Beyond Wanna Tanunchaiwatana Manager, Technology Climate Change Secretariat.
JCF March, 2006 Issues on and Requests for Joint Implementation ( “JI” ) Projects Institutional Framework on Joint Implementation ( “JI” ) Projects Yusuke.
Development and Prospects for JI UNFCCC Side Event November 30, 2005 Hiroshi YAMAGATA Ministry of Economy, Trade and Industry JAPAN.
1 Sustainable Development Assessment of CDM projects in Georgia Mariam Ubilava Istanbul, Turkey January, 2008.
CDM Basics Marcos Castro, World Bank Institute CFCB Sao Paulo Workshop São Paulo City Hall, 4 May 2010.
1 Workshop on inventories of greenhouse gas emissions from aviation and navigation May 2004, Copenhagen EU greenhouse gas emission trends and projections.
CDM – LULUCF Project Cycle Winrock International Sandra Brown Training Seminar for BioCarbon Fund Projects.
Fundamentals of PDD Analysis Recap of Theory and presentation of an illustrative PDD by Steve Thorne Maputo second SSA regional workshop 17 August 2004.
Capacity Development for CDM - National Workshop on PDD, Cairo, June Capacity Development for CDM Fourth National Workshop Cairo, June.
Yuji MIZUNO Institute for Global Environmental Strategies Baseline for Waste Management Project Regional Workshop in Asia on Capacity Development for the.
ww.neprisoe.org CDM Methodologies Carbon Markets – CDM project development 8. August 2011 Jørgen Fenhann.
SDM programme UNFCCC secretariat Session 2: The CDM project cycle Monitoring, Verification and CER issuance Training-Workshop to support the “Uganda Municipal.
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth COP 9 5 th December 2003.
Richard Hosier Global Environment Coordination Unit World Bank.
Capacity Development for Clean Development Mechanism Project Idea Note (PIN) Preparation by Kofi Asante.
1 Andrew Howard Climate Change Secretariat Emissions trading and project-based mechanisms 1-3 April 2008 Bangkok, Thailand AWG-KP 5 In-session workshop.
World Bank Experience with Power Sector Baselines Workshop on CDM Methodologies for Grid-Connected Power Projects Buenos Aires, 8 December 2004 Fernando.
Development Alternatives Baselines & Additionality Methodologies Workshop on Clean Development Mechanism: Opportunities in Rajasthan January 28-29, 2005.
Creating the Carbon Asset: PCF Approaches to Baselines and Additionality Sao Paulo, Brazil November 20-22, 2002.
Beyond offsetting: Ambitious SBL as a national contribution to combat climate change Malin Ahlberg „Designated Focal Point/Designated National Authority“
Simplified Financial Analysis for Landfill Gas Capture Projects Presented By: Dr. M. K. Elewa TIMS - Egypt Approved Baseline and Monitoring Methodology.
LULUCF Concepts Training Seminar for BioCarbon Fund Projects February 8 th 2008 Timothy Pearson and Sarah Walker Winrock International.
The African CDM Training Workshop and Preparatory UNFCCC COP9 Meeting Addis Ababa, Ethiopia, October 20 – 21, 2003 INSTITUTIONAL SET-UP FOR CDM Dr Youba.
CDM Project Developers Workshop.  Baselines – what, types of baselines, baseline scenarios, baseline emissions.  Additionality – what, why, how  Establishing.
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
Practical Experience with Small-scale Projects: Issues and Suggestions Johannes Heister, Lasse Ringius Carbon Finance Unit, World Bank Bonn, 9-10 March.
Case Study2: Reforestation Project Using Native Species Around AES-Tiete Reservoirs ARNM0002 Comments on Baseline Methodology Fourth Regional Workshop.
AIT Baselines and Additionality Sudhir Sharma Asian Institute of Technology Bangkok, Thailand 24 th March 2004.
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth Accra, Ghana 7 th and 8 th November 2005.
1 Basics of CDM Development Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
Where is the CDM’s future? Some critical observations and reform proposals Oxford, September 19 th 2005.
Does project reduce, prevent or mitigate the release of 1 or more of the Kyoto gases [See appendix 3]? Does the project remove CO2 or other GHGs from the.
UNEP Collaborating Centre on Energy and Environment Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, January 2004.
1 PDD and PIN preparation Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
Regional perspectives under the Clean Development Mechanism Jose Domingos Gonzalez Miguez, Ministry of Science and Technology, Brazil.
Salvador Da Bahia Landfill Gas Project: Baseline Methodology 1 of the 1 st 2 methodologies recommended for approval by the Meth Panel, July 2003.
CD4CDM Philippines Salvador da Bahia Landfillgas Project (PDD Presentation)
E:\The Carbon Market and Small Producers.ppt The Carbon Market and Small Producers 18 July, 2007 STRICTLY PRIVATE & CONFIDENTIAL.
Seite Hier steht ein thematisches Foto Demand side perspective on JI UNFCCC Side event on Joint Implementation Gertraud Wollansky Federal Ministry.
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, Capacity Development for CDM Cairo, March 31 & April 1,
Session 4.2. Criteria for baseline setting and monitoring Dealing with methodological matters in the ERUPT programme Zsolt Lengyel SenterNovem Carboncredits.nl.
UNEP Collaborating Centre on Energy and Environment Use and Conceptualization of Power Sector Baselines: Methodology and Case Study from El Salvador Lasse.
JISC work on Small Scale JI Projects UNFCCC Technical Workshop on Joint Implementation Bonn 9 th March 2006 By: Fatou Ndeye Gaye and Evgeny Sokolov.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
Baseline approaches and methodologies: interpretation of Para 48(a)-(c) M&P Buenos Aires, – December 5 th, 2004 Johannes Heister – World Bank, Carbon Finance.
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide
German Emissions Trading Authority (DEHSt)
JISC work regarding criteria for baseline setting and monitoring
Small-Scale Projects Under JI
Chiller Energy Efficiency Project
Presentation transcript:

The role of CDM in technical change in refrigeration - current CDM regulations - successful CDM projects and methodologies - failed projects and methodologies - Conclusion 1

Modalities and Procedures FCCC/KP/CMP/2005/8/Add.1 p A baseline shall be established: (a)By project participants in accordance with provisions for the use of approved and new methodologies; (b) In a transparent and conservative manner, and taking into account uncertainty; (c) On a project-specific basis; (d) In the case of small-scale CDM in accordance with simplified procedures developed for such activities; (e) Taking into account relevant national and/or sectoral policies 46. The baseline may include a scenario where future anthropogenic emissions by sources are projected to rise above current levels, due to the specific circumstances of the host Party. 47. The baseline shall be defined in a way that CERs cannot be earned for decreases in activity levels outside the project activity or due to force majeure. 48. In choosing a baseline methodology for a project activity, project participants shall select from among: (a) Existing actual or historical emissions, as applicable, or (b) Emissions from a technology that represents an economically attractive course of action, taking into account barriers to investment, or (c) The average emissions of similar project activities undertaken in the previous five years, in similar social, economic, environmental and technological circumstances, and whose performance is among the top 20 per cent of their category. Current regulations in CDM 2

- Bottom-up mode led to 4 selective methodologies - no general guidance on refrigeration has emerged from KP secretariat - HFC-134a accounting decisions are not coherent Carbon accounting resembles EIA in the complexity of boundaries the EB struggles to follow boundary definitions but doesnt escape their variability as in EIA, the results are hard-wired in the boundary definition and so EB decisions are circular, reaffirming and changing boundaries few attempted to make refrigeration boundaries explicit Current regulations in CDM 3

AM 60 replacing 531 CFC chillers with any non-CFC chiller CER pa AMS III.X household refrigerators replacement low-income AM 70/71 manufacture of higher efficiency refrigerators, switch to cyclopentane AMS III.AB Ice-cream cabinets 0.2 kg < 134 < 6 kg ITC Sonar Hotel 0686 reg. 11/06 chiller mod., AMS II.E 355 of 1996 CER in 2008 EIH hotels 5 vapour compression chillers – 0.64 kW/TR, AMS II.E, 10,178 CER pa BKC chiller + building mod 1.17 – 0.7 kW/TR AMS II.E CER pa Kloof Mine replace cold water with ice 134a+NH 3 chiller AMS II.D 1.8 mio 53,624 CER pa Ecospace Kolkata new chiller baseline DOE4.1 AMS II.E 2.1 mio 14,542 CER pa Mindspace Bldg Serene Prop kW/TR AMS II.E 15,063 CER pa Successful CDM projects and methodologies 4

AM60 1st CDM methodology for refrigeration approved 11/2007 accelerated replacement of old CFC chillers financial intermediary ICICI is offering carbon finance + commercial loans GEF, MLF as seed funding for first chiller generation then CDM revenues only CO 2 emission reductions out of power savings are claimed (CFC not) expected number of chiller replacements : > 500 Total investment 91 mio US$ CER revenues 14 mio US$ expected volume of CO 2 ERs up to 2012: > 2.3 m t CO 2 Successful CDM projects and methodologies 5

AMS III.X Efficiency and 134a recovery approved 11/2008 first to use eligibility criteria: EU directive 2002/96 <15 GWP WEEE standard Recycling CER/fridge credits GWP 1,430 Successful CDM projects and methodologies

7 AM 70 Manufacturing refrigerators approved 9/08 10 % annual efficiency increase (600/290 already) 59,915 CER pa 720,000 fridges pa 1.3 mio cost of switch 0.08 CER/fridge 90 % data

Successful CDM projects and methodologies 8 AM 71 HFC-134a to 600a in refrigerators approved 9/08 1 mio annual production 36,072 CER pa 3.3 per DC 7.1 FF 0.03 CER/fridge.

.. Successful CDM projects and methodologies 9

AMS III.AB avoidance of HFC emissions in Commercial Refrigeration Cabinets Avoidance of HFC 134a emissions during the life cycle of refrigeration equipment (0.2kg < HFC usage< 6kg) such as freezer ice cream cabinets. 5,000 pa emissions during manufacture, servicing and disposal is baseline 720 CER pa Project cabinets use refrigerants and foam blowing agents having no ODP and negligible/low GWP propane The cabinets introduced by the project activity are equally efficient or more Retrofit of HFC 134a to use alternative low GWP refrigerants is not eligible PP is using HFC-134a cabinets for at least three years and has not been using refrigerants with a low GWP prior Successful CDM projects and methodologies 10

Refrigerant Assumptions and Impacts AM 60 account for refrigerants only if leakage increases, GWP decrease shortens lifetime AMS III.X only one charge of 134a is saved, excludes maintenance imposes HC AM 70 refrigerant excluded technology leader wants to extend its lead and beats 3.5% ATD AM 71 only refrigerant, and no efficiency changes switch has no quality effects AMS III.AB only refrigerant switch has not quality effects Successful CDM projects and methodologies 11

Refrigeration value chain: components manufacture usage recycling AM 60 AM 70/ AMS III.X AMS III.AB NM0323 Successful CDM projects and methodologies 12

Failed refrigeration CDM Pão de Açúcar supermarket 2007 bundles of 10 stores AMS II.E improved maintenance, replacement of minor system components rejected because baseline used energy data for whole store, changes to store and its operation not documented Automobile AC re-fill with propane NM013 AC Labelling NM0159 Lighting NM0157 Failed CDM projects and methodologies 13

NM0159 Ghana AC Standard enforcement CDM by Ghana Energy Foundation required minimum Energy Efficiency Ratio or EER of 2.8 or higher electricity required per unit of cooling watt/watt or Btu/hr/wat t. any AC units below this standard cannot be sold in the Ghanaian market. a testing laboratory enforces the standard the goal is to stop the dumping in Ghana of inefficient units Reasons for rejection: Ownership of CER, baseline scenario, decisive: signal to noise Failed CDM projects and methodologies 14

NM013 Promotion of natural refrigerants in AC and refrigeration after market for mobile AC, by major national car manufacturer refilled with propane/butane blend HyChill, recovered 134a destroyed 210,000 cars 22,382 CER pa Reasons for rejection: monitoring of converted cars relies on the cars return to the same service station Failed CDM projects and methodologies 15

... Failed CDM projects and methodologies 16

Potential 17 CDM can be designed to support this, build on the Ghana NM159 experience AM70 could be reinforced by labelling

Koizumi 2007 IEA Current LCC at average EER 2.8 Potential 18

Conclusion Ideally new methodologies can: Use operational conditions Replace all F-gases Accelerate replacement periods 19

Potential 20

Payment for fridge & recycling Payment Electricity CO2 Emission Reduction (CERs) 1 yr 2 yr 3 yr 4 yr 5 yr 6 yr 7 yr 8 yr 9 yr 10y r Old refrigerator New refrigerator CDM Utility Exchange Program household Utility manufacturer Recycling Discount CO2 Emission Reduction (CERs) 1 yr 2 yr 3 yr 4 yr 5 yr 6 yr 7 yr 8 yr 9 yr 10y r 21