SST skill 1 mnth Heat Content skill 3 mnth 3 mnth 6 mnth 6 mnth 9 mnth

Slides:



Advertisements
Similar presentations
Data assimilation in the ocean
Advertisements

Normal Conditions. The Walker Circulation El Niño Conditions.
Slide 1 Magdalena A. Balmaseda, OSE Workshop, Paris 5-7 November 2007 Observing System experiments with ECWMF operational ocean analysis (ORA-S3) The new.
Consolidated Seasonal Rainfall Guidance for Africa, November 2013 Initial Conditions Issued 7 November 2013 Forecast maps Forecast Background – ENSO update.
CFSv2 monthly mean forecast skill December, 2010.
Assessment of CFSv2 hindcast (seasonal mean) CPC/NCEP/NOAA Jan 2011.
Validation of the NCEP CFS forecasts Suranjana Saha Environmental Modeling Center NCEP/NWS/NOAA/DOC.
UCSB Climate Research Meeting Dept. of Geography ICESS- UCSB October 16, 2009 Earth Space Research Group Climate Variations and Impacts: Monthly Discussion.
ENSO Cycle: Recent Evolution, Current Status and Predictions Update prepared by Climate Prediction Center / NCEP 19 November 2012.
OceanObs 09, Venice September THE ECMWF Seasonal Forecasting system.
Indian Ocean Forecast System (INDOFOS) Francis P. A. Earth System Sciences Organisation (ESSO) Indian National Centre for Ocean Information Services (INCOIS)
Ocean buoys collect data over many years – changes in the atmosphere and ocean over many years provide clues to climate variability. We need to look at.
(Mt/Ag/EnSc/EnSt 404/504 - Global Change) Observed Surface & Atmosphere (from IPCC WG-I, Chapter 3) Observed Changes in Surface and Atmosphere Climate.
The Centre for Australian Weather and Climate Research A partnership between CSIRO and the Bureau of Meteorology Oscar Alves, Yonghong Yin, Robin Wedd,
Report of the Tropical Moored Buoy Implementation Panel to the 24 rd Session of the Data Buoy Cooperation Panel October 13-16, 2008 Cape Town, South Africa.
The Centre for Australian Weather and Climate Research A partnership between CSIRO and the Bureau of Meteorology Oscar Alves, Li Shi, Yonghong Yin, Robin.
Belgrad nov SEECOF-10 Forecasts for DJF Christian Viel Météo-France.
Available products for Seasonal forecasting J.P. Céron – Direction de la Climatologie.
Current status of TRITON buoy array and Past, Present, and Future Collaborations Ken Ando and Yasu Ishihara, JAMSTEC.
The Centre for Australian Weather and Climate Research A partnership between CSIRO and the Bureau of Meteorology Summary/Future Re-anal.
Inter-annual to decadal climate prediction Mojib Latif, Leibniz Institute of Marine Sciences at Kiel University.
The Centre for Australian Weather and Climate Research A partnership between CSIRO and the Bureau of Meteorology Red - ECMWF Green - Sintex Navy - POAMA-2.0.
Monsoon Intraseasonal-Interannual Variability and Prediction Harry Hendon BMRC (also CLIVAR AAMP) Acknowledge contributions: Oscar Alves, Eunpa Lim, Guomin.
EUROBRISA WORKSHOP, Paraty March 2008, ECMWF System 3 1 The ECMWF Seasonal Forecast System-3 Magdalena A. Balmaseda Franco Molteni,Tim Stockdale.
Improved ensemble-mean forecast skills of ENSO events by a zero-mean stochastic model-error model of an intermediate coupled model Jiang Zhu and Fei Zheng.
ENSO Variability in SODA: SULAGNA RAY BENJAMIN GIESE TEXAS A&M UNIVERSITY WCRP 2010, Paris, Nov
The Global Tropical Moored Buoy Array: Status & Plans Mike McPhaden OCO Review 3-5 Sept 2008 RAMA PIRATA TAO/TRITON.
Report of the Tropical Moored Buoy Implementation Panel to the 23 rd Session of the Data Buoy Cooperation Panel October 15-19, 2007 Jeju, Korea.
Ben Kirtman University of Miami-RSMAS Disentangling the Link Between Weather and Climate.
Report of the Tropical Moored Buoy Implementation Panel to the 20 th Session of the Data Buoy Cooperation Panel October 18-22, 2004 Chennai, India Nuku.
Y. Fujii 1, S. Matsumoto 1, T. Yasuda 1, M. Kamachi 1, K. Ando 2 ( 1 MRI/JMA, 2 JAMSTEC ) OSE Experiments Using the JMA-MRI ENSO Forecasting System 2nd.
1 Arun Kumar Climate Prediction Center 27 October 2010 Ocean Observations and Seasonal-to-Interannual Prediction Arun Kumar Climate Prediction Center NCEP.
1 Comparative Analysis of Upper Ocean Heat Content Variability from an Ensemble of Operational Ocean Analyses Yan Xue (1), Magdalena A. Balmaseda (2),
The Centre for Australian Weather and Climate Research A partnership between CSIRO and the Bureau of Meteorology Oscar Alves and the POAMA Team CAWCR (Centre.
GODAE Final Symposium, 12 – 15 November 2008, Nice, France Ocean Initialization for seasonal forecasts ECMWF CAWCR Met Office JMASTEC NCEP MERCATOR-Ocean.
Evaluation of Tropical Pacific Observing Systems Using NCEP and GFDL Ocean Data Assimilation Systems Y. Xue 1, C. Wen 1, X. Yang 2, D. Behringer 1, A.
Ocean Syntheses David Behringer NOAA/NCEP NOAA Ocean Climate Observation 8th Annual PI Meeting June 25-27, 2012 Silver Spring, Maryland.
Tropical Moored Buoy Implementation Panel 25th Session of the Data Buoy Cooperation Panel Report of the Tropical Moored Buoy Implementation Panel to the.
Impact of TAO observations on Impact of TAO observations on Operational Analysis for Tropical Pacific Yan Xue Climate Prediction Center NCEP Ocean Climate.
Population by Eleanor Joyce City of Salem Schools.
Real-time Ocean Reanalyses Intercomparison Project for Quantifying Impacts of Tropical Pacific Observing Systems on Constraining Ocean Reanalyses for ENSO.
Tropical Moored Buoy Arrays in Support of Climate Research and Forecasting Contributions to the Global Ocean Observing System Nuku Hiva, Marquesas Islands.
ECMWF NEMOVAR update, NEMOVAR meeting Jan ECMWF update : NEMOVAR ORA-S4 (Ocean Re-Analysis System 4) implemented operationally  Based.
Understanding Forecast Skill What is the Overall Limit of Predictability? What Limits Predictability? –Uncertainty in Initial Conditions: Chaos within.
Press conference on The state of global climate in 2015 M. Jarraud Secretary-General World Meteorological Organization Palais des Nations 25.
1 A review of CFS forecast skill for Wanqiu Wang, Arun Kumar and Yan Xue CPC/NCEP/NOAA.
Real-time Ocean Reanalyses Intercomparison: Ocean/Climate Monitoring Using Ensemble Ocean Reanalysis Products Y. Xue1, M. Balmaseda2, Y. Fujii3, G. Vecchi4,
LONG RANGE FORECAST SW MONSOON
T. Lee9, I. Ascione7, R. Gudgel4, I. Ishikawa10
Current State of the Pacific and Indian Oceans
JMA Seasonal Prediction of South Asian Climate for OND 2017
ENSO Frequency Cascade and Implications for Predictability
LONG RANGE FORECAST SW MONSOON
Local Ensemble Transform Kalman Filter for ROMS in Indian Ocean
LONG RANGE FORECAST SW MONSOON
Seasonal prediction of South Asian summer monsoon 2010: Met Office
Ocean Sub-Surface Observing Network
A coupled ensemble data assimilation system for seasonal prediction
Y. Xue1, C. Wen1, X. Yang2 , D. Behringer1, A. Kumar1,
Streamflow Measurement
Streamflow Measurement
Predictability assessment of climate predictions within the context
Silvana Buarque, Marie Drévillon, Charles Desportes, Charly Régnier
Potential Temperature (K)
T. Ose, T. Yasuda (MRI/JMA), Y. Takaya, S. Maeda, C. Kobayashi
El Niño and the Southern Oscillation (“ENSO”)
Real-time Ocean Reanalyses Intercomparison: Ocean/Climate Monitoring Using Ensemble Ocean Reanalysis Products Y. Xue1, M. Balmaseda2, Y. Fujii3, G. Vecchi4,
Joint Proposal to WGOMD for a community ocean model experiment
Directions: Label the following countries on the political map of Asia. China North Korea India South Korea Indonesia Vietnam Japan.
Headband In this figure, red and blue lines are closely correlated, means suspect has knowledge of crime. In this figure, red and blue lines.
Presentation transcript:

SST skill 1 mnth Heat Content skill 3 mnth 3 mnth 6 mnth 6 mnth 9 mnth 9 mnth

Correlation Nino34 RMSE IOD

Nino-4 Anomaly Correlation Red - Old system Navy - PEODAS Blue - ECMWF Navy - PEODAS Pink - No Assim

Temperature error - comparison with TAO and ECMWF Temperature Comparison with TAO Mooring at 140W

IOD Anomaly Correlation Red - Old system Navy - PEODAS Blue - ECMWF Navy - PEODAS Pink - No Assim

ECMWF Better due to Altimeter ? Surface currents in the Indian Ocean Correlation of surface U with OSCAR (www.oscar.noaa.gov) PEODAS ECMWF ECMWF Better due to Altimeter ?

At present, RAMA is 39% complete, with 18 of the 46 total mooring sites occupied (Figure 2). Nations that have provided mooring equipment, ship time, personnel, and/or logistic support so far include Japan, India, the United States, Indonesia, China, and France.