Company production strategy Company production strategy Production system Production system Good manufacturing practice Good manufacturing practice Machinery.

Slides:



Advertisements
Similar presentations
1,000, , , ,000 64,000 32,000 16,000 8,000 4,000 2,000 1,
Advertisements

Welcome to Who Wants to be a Millionaire
Dic 121 Productos no férricos de Mungia S.L. COFUNDI Aluminum Casting Quality Procedures December 2012.
Shanghai Kaiquan Pump (Group) Co., LTD.
George Spyrou, Financial Manager Navigo Shipmanagers, Limassol, Cyprus
Slide 1 Insert your own content. Slide 2 Insert your own content.
Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
Testing of an integrated wood-fired cooking stove and thermo-acoustic engine-generator unit Ron Dennis Paul RileyProf Keith Pullen City UniversityUniversity.
Welcome to Who Wants to be a Millionaire
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
Welcome to Who Wants to be a Millionaire
Company Profile Location Goeppinger Str Pforzheim Germany
ACTIVE LEARNING PROCESS
Chapter 11 Refrigeration Cycles Study Guide in PowerPoint to accompany Thermodynamics: An Engineering Approach, 5th edition by Yunus A. Çengel.
Beer equipment Beer equipment Other equipment Other equipment Inox tubes Inox tubes Production program – Oprema Intercom Production program – Oprema Intercom.
The IP Revolution. Page 2 The IP Revolution IP Revolution Why now? The 3 Pillars of the IP Revolution How IP changes everything.
Welcome ! Products for: Enclosures • Electronics & Communication •
2014 Level II Prep Class Personal Property Training 1.
MAO Flow Meters Sales Deck | Presentation Title What is the MAO Flow Meter? The MAO flow meter is an instrument used for monitoring or measuring.
Chapter 1 Introduction to the Programmable Logic Controllers.
Gilbert Noussitou NUTRITION L3 COOK & CHILL and COOK & FREEZE SYSTEMS.
Replacement Condensers Charge Level Adjustment May be Necessary.
Welcome to EUROLUM GmbH Product Information Eurolum GmbH | Kirschallee. 90 | Potsdam | Tel. +49 (0) 331/ | Fax. +49 (0) 331/
LED light fixtures Warehouse, Commercial, Industrial, Freezer and Cooler applications Before After.
© 2004 by Prentice Hall, Inc., Upper Saddle River, N.J S 7-1 Operations Management Capacity Planning Supplement 7.
1 Martin Zralý: ENTERPRISE MANAGEMENT CONTROL Department of Enterprise Management and Economics Faculty of Mechanical Engineering, Czech Technical University.
1 Production Account Goods and Services Account Training Workshop on System of National Accounts for ECO Member Countries October 2012, Tehran, Islamic.
10 Operations Decisions 1. How the 10 operations decisions below are applied in Mango? Goods & service design Quality Process & capacity design Location.
Huiswerkoplossings.  1) As x = -1 dan is y = -2(-1) – 8 = 2 – 8 = -6 As x = -2 dan is y = -2(-2) – 8 = 4 – 8 = -4 As x = -3 dan is y = -2(-3) – 8 = 6.
Company Profile Heinrich Müller Maschinenfabrik GmbH Location
Pressure = force area = 12 N 25 cm 2 = 0.48 N/cm 2.
Handouts 11 ME 330 Introduction Instructor: Chris Zhang Class Times: M, W, F 1:30 to 2:20 pm Room: 2C02 Office hours: M, W,
10 Year Old Topic 2 9 Year Old Topic 4 8 Year Old Topic 5 8 Year Old Topic 6 7 Year Old Topic 7 7 Year Old Topic 8 6 Year Old Topic 9 6 Year Old Topic.
Are You Smarter Than a 5 th Grader? 1,000,000 5th Grade Topic 1 5th Grade Topic 2 4th Grade Topic 3 4th Grade Topic 4 3rd Grade Topic 5 3rd Grade Topic.
WP3: Fixing RES-H/C targets Lukas Kranzl, Andreas Müller RES-H Policy Kick-off, October 2008.
In this section: Operations are the activities a company engages in to produce its goods or services. This section discusses: The Role of the Operations.
10 CHAPTER Refrigeration Cycles.
Riga ; Latvia Vehicle “Off-Line” GPS and Fuel Monitoring System (post trip vehicle monitoring system)
Partial Products. Category 1 1 x 3-digit problems.
Hydrological information systems Svein Taksdal Head of section, Section for Hydroinformatics Hydrology department Norwegian Water Resources and Energy.
Application samples All rights reserved, property and © CAD Computer GmbH & Co. KG 2009.
Respected business partners, employees, friends, I feel great pride and honor to be a witnesses of what Oprema has become, both in Croatia and in the.
2. Computer Aided Design and Production Process Assoc.Prof.Dr. Ahmet Zafer Şenalp Mechanical Engineering.
Ta-Te Lin, Yi-Chung Chang
ENERGY CONVERSION ES 832a Eric Savory Lecture 11 – A small-scale power plant worked example Department of Mechanical.
Advanced Manufacturing Laboratory Department of Industrial Engineering Sharif University of Technology Session # 12.
Computer Integrated Manufacturing CIM
Ken Youssefi Introduction to Engineering – E10 1 Design Process Concurrent Engineering.
Stable Running Result of the Refrigerator FB41 Digital Controller in PLC S7-300 The Research of PID Control in a Large Scale Helium Refrigerator Objectives.
Part 3 Managing for Quality and Competitiveness © 2015 McGraw-Hill Education.
Ken Youssefi Mechanical Engineering department 1 Design Process Concurrent Engineering.
Coal Market In India, New Delhi, 2013 Total Coal Quality Management Systems Viktor Valenta Enelex, Czech Republic.
Location Estonia Population 1,3 mln Area km²
Ken Youssefi Mechanical Engineering department 1 Introduction to Concurrent Engineering Computer Aided Design (CAD) Computer Aided Manufacturing (CAM)
M. Battistin – 1 st September 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 1 st September 2009 ATLAS Working Group Thermo-siphon review - Low temperature condensation.
Energy Consumption Calculations Group 4a. Contents 1.Introduction 2.Methods 3.Tools 4.Country specific variations a.Finland b.Other Nordic countries c.Italy.
Chapter 9 Management Information Systems. Chapter 9IS for Management2 Management Information Systems (MIS)  Provide managers with information & support.
BY SAM.  Computer-aided design [CAD]  Computer-aided manufacture [CAM]  CAD/CAM systems  Computer-aided engineering (CAE) 1/17/2012 ICT on Engineering.
.AIR COMPRESSOR.  Single Stage Air Compressor.  Two Stage Air Compressor.  Multi Stage Air Compressor. PRESENATION ON…. Contact us :
Page 1.
AAVID’S NEW ONLINE THERMAL DESIGN TOOL
Design Process Concurrent Engineering
Page 1.
Page 1.
flow process control trainer
Advantages And Disadvantages
BUS 201: Introduction to Business
Operations Manager- the person responsible for supervising the production of goods and services for the company. 7 activities of the operations manager.
ENERGY CONVERSION ES 832a Eric Savory
Presentation transcript:

Company production strategy Company production strategy Production system Production system Good manufacturing practice Good manufacturing practice Machinery manufacturing Machinery manufacturing Oprema Intercom production Oprema Intercom production Production capacity Production capacity 2 CONTENT

COMPANY PRODUCTION STRATEGY 3

PRODUCTION SYSTEM 4

GMP (Good Manufacturing Practice) Its position on the market company OPREMA UREĐAJI d.d. has achieved with quality products and strict respect of delivery time and customer requests. Complete process from idea to the final product has to be controlled in each segment. Our marketing department collects information from the market and structures the product. R & D department researches and developes products, and makes a detailed testing in laboratory. Production supported by modern software CAD CAM produces the product, and the whole process is accompanied by intermediate stage and final control. Quality Control System is integrated into entire process. 5

6 EQUIPMENT FOR METAL SHEET PROCESING

7 EQUIPMENT FOR METAL TUBE PROCESSING

CHARGING EQUIPMENT FOR REFRIGERANT GASES 8

9 OTHER EQUIPMENT

10 Thermodynamic laboratory consists of 3 chambers. Two of them are equipped so that ambient temperature can be held at any temperature between 0-40ºC with tolerance +/-0,5ºC. One of them is equipped so that humidity could be held between 30 – 100%. Laboratory is equipped with water line, controlled temperature (0-40ºC) which is used for thermal load simulation or as inlet water for draw simulation. Data acquisition system is controlled by OMRON PLC C200 Series with analog and digital inputs and digital outputs. All parameters: temperatures, pressures, current, power, power consumption are analyzed by PLC and by SCAD Omron CX-Supervisor tool stored in computer. Furthermore, system has a possibility of managing with tested equipment on the base of input data and previous recorded software. THERMODYNAMIC LABORATORY

11 Oprema Intercom PRODUCTION

PRODUCTION CAPACITY units ( instaled capacity) Production capacity per product : UNITS Beer coolers and dispensers Postmix dispensers Wine coolers and dispensers Water coolers and dispensers Demo bars1.000 – Cooling cabinets Towers Tubes m units ( instaled capacity) Production capacity per product : UNITS Beer coolers and dispensers Postmix dispensers Wine coolers and dispensers Water coolers and dispensers Demo bars1.000 – Cooling cabinets Towers Tubes m

Thank You. 13