FB improvements winter

Slides:



Advertisements
Similar presentations
1 Intraday in the CWE region NWE and Bilateral initiatives Common RCC CSE - CWE 28 September 2010.
Advertisements

Data assimilation Preliminary remarks Tony O’Hagan.
1 page 1 C O U P L E D NWE TSO Day Ahead Project NRA – TSO – PX meeting, 15 June 2011 ENTSO-E Regional Group Northwest Europe C O U P L E D.
1/03/09 De 89 à 98. 1/03/09 De 89 à 98 1/03/09 De 89 à 98.
Recent ERCOT Events Lessons Learned
Jacques Rousseau & Dr David Lavoué
By K atherine I E buoh ( M sc ) Information Technology Implementation Of Technical Analysis Stock Trading Application For The Nigerian Stock Exchange.
NATIONAL GRID Market Evolution in Ireland APEX 2004 Annual Conference Ann Scully Manager, Market Operations ESB National Grid.
Reliable Power Reliable Markets Reliable People Rule 6.6 Recommendation Update January 29, 2009.
IceWind project TFI Annual Conference September 2010 Niels-Erik Clausen Wind Energy Division, Risø DTU.
Winter’s Exponential smoothing
Smart transmission system Marián Belyuš18. April 2012 R&D Conference ČEZ Měření ČEPS, a.s.
The Market Coupling Experience in Europe Jean-François CONIL-LACOSTE CEO Powernext SA CEO EPEX Spot SE APEX 2008 Conference Session 1 - Part 3: European.
Debris flow warning system for public use CRHNet October 2010.
Directorate-General for Energy Security of electricity supply Dutch approach Investors and European perspective Safety net mechanism IEA/NEA-workshop.
©2004 PJMwww.pjm.com 1 PJM's Perspective on Reliability – Summer 2004 and Beyond Karl Pfirrmann President -- PJM Western Region FERC Summer Reliability.
SPP Wind Integration Holly Starling Project Manager July 3, 2008.
Transparency in the Central West Electricity Regional Energy Market Office of Energy Regulation (DTe) MINI FORUM Paul Giesbertz.
CWE TSOs clarification document related to the “new DE/AT GSK” October
Achievements and next steps in the Central-South Region Central-South Region 3rd SG meeting Milan, November 16 th 2010.
1 RPRS Market the issue of capacity inadequacy solved by the Local Congestion procurements ERCOT Feb 19, 2004.
efficient capacity allocation method
Single Auction Office 1 Mini-Forum of Central Western Europe Brussels, 20th June 2006 Dr. Frank-Peter Hansen Federal Network Agency.
12 January 2006 Conference Day 1 Development Multilateral market coupling (MMC) integrating: NorNed market coupling between APX and Nord Pool spot Trilateral.
Consider the function: Now, interchange the x- and y- coordinates in the set of ordered pairs above. This new set of ordered pairs is called the inverse.
1 Market coupling Commission de Régulation de l’Electricité et du Gaz Fonctionnement Technique des Marchés September 2010 Common CSE – CWE RCC Meeting.
Wind Production intermittency Cross border compensation: what to expect in Western Europe? Analysis of Winter 2010/2011 Hubert Flocard and Jean-Pierre.
FUI Stakeholder Meeting BritNed presentation Jan-Paul Dijckmans & Jonathan Maughan 4 November 2009.
Equations of Straight Line Graphs. Graphs parallel to the y -axis All graphs of the form x = c, where c is any number, will be parallel to the y -axis.
PRR 503 Coordination of Resources Due to TSP Section Management of Transmission Forced Outage or Maintenance Outages.
。 33 投资环境 3 开阔视野 提升竞争力 。 3 嘉峪关市概况 。 3 。 3 嘉峪关是一座新兴的工业旅游城市,因关得名,因企设市,是长城文化与丝路文化交 汇点,是全国唯一一座以长城关隘命名的城市。嘉峪关关城位于祁连山、黑山之间。 1965 年建市,下辖雄关区、镜铁区、长城区, 全市总面积 2935.
Vivi Mathiesen Florence Forum, Florence 13 Dec 2010 Third Compliance Monitoring Report.
1 page 1 C O U P L E D NWE Day Ahead Project Update FUI IG Mtg – London 13 th September 2010 ENTSO-E Regional Group Northwest Europe C O U P L E D.
MKT 441 Week 3 Individual Market Research Implementation Plan Phase 2 Prepare a 800 to 1050 word paper in which you differentiate among the research tools.
Joint Proposal for a Day Ahead Market Coupling Initiative between GB and Mainland by National Grid, RTE, ELIA and TENNET   Results of a joint study on.
Overview and breakdown of the KPI results
CWE NRA transparency request CWE TSOs transparency proposal
Plotting Points Jessica Tate.
Starter Questions.
IFA Market Coupling Update
ETSO main 2006 Issues for West-Central Europe Market Development
EVALUATION OF BUSINESS TRANSFORMATION
example 4 Minimizing Cost
ENTSO-E Winter outlook 17-18
Monetary Policy in Peru
WG1: RELIABLE, ECONOMIC AND EFFICIENT SMART GRID SYSTEM
Demand Response in the 7th Power Plan
Linking of regional markets
What is the average rate of change of the function f (x) = 8 x - 7 between x = 6 and x = 7? Select the correct answer:
Please consider our Earth environment before printing
MS 6012 Enthusiastic Studysnaptutorial.com
Context Corporate presentation Elia Group | 2015.
Since H is 4 units to the left of the y-axis,
Regional poverty statistics – state of play
efficient capacity allocation method
Day-ahead market coupling
أنماط الإدارة المدرسية وتفويض السلطة الدكتور أشرف الصايغ
Jose GONZALEZ PASTOR Economic & Adequacy Analyst - Elia
SBSTA Research Dialogue: Perspectives from the United States
Additional Example 2: Graphing Ordered Pairs Graph and label each point on a coordinate grid. A. L (3, 5) Start at (0, 0)
Regional Association II (Asia) WG on Hydrological Services
Forecasting and Operations CAISO Case
Overview of the Cross-border initiatives 2018
A is trace equivalent to B
Question 12.
WG European Market Design
Line Graphs.
SUMMER OUTLOOKS 2019 Lea Dehaudt, Moderator ENTSO-E
Scheme of the Algorithm for the Acceptance and Settlement of Bids in the TSO-TSO Model of AT-BE-CH-DE-FR-NL.
Looking to the power system future An ENTSO-E perspective
Presentation transcript:

FB improvements winter 2017-2018 Arbeitsstand FB improvements winter 2017-2018 Context: FB capacities issues since go-live FB Market Coupling Short-term measures taken for winter 2017-2018 KPI’s

Short-term measures taken for winter 2017-2018 CWE TSO’s acknowledged in 2017 some issues when looking at the FB capacities and implemented several measures before winter 2017-2018: Additional coordination for existing preventive and curative remedial actions (RA) in the DA process Go-live of RACT (remedial action coordination tool) Improved market forecast using centralized tool Improved coordination of RAs Extension of the list of non-costly RAs for coordination in the DA process New preventive RAs for TenneT NL & TenneT DE Preventive PST RA for Elia to guaranty a minimal reduction of BE loopflows Use / extension of dynamic line rating (based on weather forecast) within Amprion / Tennet grids Extension of DLR (based on Ampacity forecast technology) within Elia

KPI’s winter 2017-2018 In below graph the max. import capacity for BE + FR are compared between winter 16/17 and 17/18 where one can observe that on average this important indicator has increased with +/- 1800MW.