RPC Detector Control System: towards the final system

Slides:



Advertisements
Similar presentations
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting HV-LV-DCS Status DCS barrel:G. Polese and P. Paolucci DCS endcap:A. Cimmino and.
Advertisements

Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007.
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#
Detector Control System at the GIF++ A. Polini, M. Romano (AIDA+INFN Bologna) on behalf of WP group Gif++ User Meeting 11/07/2014 Outline Status.
Giovanni Polese 1 HV cabling multiconductor connettorization (600 ch) : pretest and fixing: 1 month * 2 people connectorization: 2 months * 2 people HV.
MDT PS DCS for ATLAS Eleni Mountricha
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
P. Paolucci - I.N.F.N. di Napoli 1 MTCC meeting May 06 HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV) 6/40  15% A3512N (HV) 10/10 
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
DCS workshop July 2007 Overview Installed detectors Installed detectors FMD3 commissioning FMD3 commissioning FSM Hierarchy FSM Hierarchy LV+HV FSMs LV+HV.
Controls EN-ICE Finite States Machines An introduction Marco Boccioli FSM model(s) of detector control 26 th April 2011.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
ECAL Prototype DCS system using PVSS Günther Dissertori (for Alison Lister) ETHZ
1 Status and Outlook of the RPC Commissioning Marcello Maggi/INFN-Bari.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
MoA and M & O-B Pigi Paolucci. Introduction The RPC endcap and barrel project were merged in an unique project in the 2009 and so we don’t have a long.
CMS ECAL DCS 10.Oct S.Zelepoukine ICALEPCS CMS ECAL DCS 1 The Detector Control System for the Electromagnetic Calorimeter of the CMS Experiment.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
Detector Control System
FPix DCS Subgroup Report
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
ATLAS MDT HV – LV Detector Control System (DCS)
Controlling a large CPU farm using industrial tools
RPC Barrel HV & LV system Lappeenranta University
T1 Electronic status Conclusions Electronics Cards:
Electronics for RPC Upscope
Cosmic Ray Tracker and Detector Control System at the GIF++
HV & LV status LV system in W+1 and W+2 is OK
RPC Configuration DataBase Pierluigi Paolucci - I.N.F.N. of Naples.
Pierluigi Paolucci - I.N.F.N. Naples
Pierluigi Paolucci - I.N.F.N. Naples
RPC Manufacturing Review - Pierluigi Paolucci - I.N.F.N. Napoli
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
RPC Detector Control System
23 Barrel chambers and 12 Endcap chambers
HV Imon in 1th MTCC period
RPC Detector Control System
RPC Detector Control System
RPC Detector Control System
Dr. Pierluigi Paolucci - INFN di Napoli
RPC Detector Control System
HV-LV-DCS Status NEWS DCS Endcap Integration
RPC Detector Control System
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System
RPC HV-LV project Introduction System requirements and description
RPC HV-LV project Introduction RPC description Requirements
RPC Detector Control System
HV & LV status LV system in W+1 and W+2 is OK
RPC Detector Control System
Experiment Control System
HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV)
RPC HV-LV project Introduction System requirements and description
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System
RPC Configuration DataBase Pierluigi Paolucci - I.N.F.N. of Naples.
23 Barrel chambers and 12 Endcap chambers
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

RPC Detector Control System: towards the final system Workshop on CMS RPC commissioning and upgrade Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University Giovanni Polese

New feature for final system Improved Hardware description from Hardware tree, more detailed features for all components (boards, temperature, MAO, rack and BCs), easier management of all kind of problem happened during the MTCC . Positive performance tests in 904 using the final hardware for one wheel regarding configuring, starting up and db access operations. Additional feature for each wheel, possibility to plot simultaneously the worst six chamber. Additional information about the status of cooling, cavern environmental conditions and magnet status. RPC DCS is developed as a hierarchy where every object is represented as a node of the tree, following the CMS structure. Control Unit performs as logical decision unit, they can take decisions and act on their children, sending comands, based on their states. The logical behavior of a Control Units is expressed in terms of Finite State Machines States transitions can be triggered by: Command reception, either from its parent or from the operator State changes of its child Each single element of the structure, in the FSM approach, is a different parts of the detectors, structured as logical software units, arranged in a tree-like structure. Each logical unit is characterized by a set of well defined states. Giovanni Polese

DCS news We are migrating the entire structure to the DCS final PCs in P5. All DCS PCs have been put in place, configured and ready for working. From HV/LV point of view, the first step for W+2 test was deeply focused on the hardware setup of the entire system. All chain components has been configured and tested successfully. The HV Mainframe has been installed, configured and now works properly in USC55. This mainframe is temporarily shared with LV to allow testing. The Next step, after creating all the right links and setting the right configuration for HV,LV and T boards, is to upload the setup configuration into Db. Only after this, PVSS is able to retrieve the config from db and start to control the entire system. RPC DCS is developed as a hierarchy where every object is represented as a node of the tree, following the CMS structure. Control Unit performs as logical decision unit, they can take decisions and act on their children, sending comands, based on their states. The logical behavior of a Control Units is expressed in terms of Finite State Machines States transitions can be triggered by: Command reception, either from its parent or from the operator State changes of its child Each single element of the structure, in the FSM approach, is a different parts of the detectors, structured as logical software units, arranged in a tree-like structure. Each logical unit is characterized by a set of well defined states. Giovanni Polese

Databases Configuration DB: A version of Configuration PVSS db with all hardware structure and working parameter has been created on devdb for W+2. Next step is to move on OMDS db. Condition DB: More hardware information added on db from hw point of view, optimized thresholds for main channels parameter (Vmon, Imon, I0,V0,status,temp) and from hardware component (Board temperature, FSM status, HW status) Regarding OMDS db resources, the idea is to use a common db only for PVSS data, both for configuration and condition. Additional table and view to simplify and speed up the communication with external software. RPC DCS is developed as a hierarchy where every object is represented as a node of the tree, following the CMS structure. Control Unit performs as logical decision unit, they can take decisions and act on their children, sending comands, based on their states. The logical behavior of a Control Units is expressed in terms of Finite State Machines States transitions can be triggered by: Command reception, either from its parent or from the operator State changes of its child Each single element of the structure, in the FSM approach, is a different parts of the detectors, structured as logical software units, arranged in a tree-like structure. Each logical unit is characterized by a set of well defined states. Giovanni Polese

Conclusion The entire system fully responses to the last version of the official CMS DCS guidelines, required for the integration to the Central DCS. First PVSS DCS application version for W+2 available when the final hardware configuration will be ready (after cabling T sensor ~ 1 week). Ready to be used from not expert from the second half of May. Global DCS commissioning is foreseen from the half of Jun. Regarding Endcap, no upgrade has been done from the MTCC for qualified manpower missing. RPC DCS is developed as a hierarchy where every object is represented as a node of the tree, following the CMS structure. Control Unit performs as logical decision unit, they can take decisions and act on their children, sending comands, based on their states. The logical behavior of a Control Units is expressed in terms of Finite State Machines States transitions can be triggered by: Command reception, either from its parent or from the operator State changes of its child Each single element of the structure, in the FSM approach, is a different parts of the detectors, structured as logical software units, arranged in a tree-like structure. Each logical unit is characterized by a set of well defined states. Giovanni Polese

HV cabling multiconductor connettorization (600 ch): pretest and fixing: 1 month * 2 people  8 K€ connectorization: 2 months * 2 people  20 K€ HV cable-distrib: 1 month * 2 people  8 K€ people involved up to now: G. Passeggio, F. Cassese, A. Vanzanella A. Cimmino and P. Noli HV Patch Panel connection: 2 weeks * 2 people Giovanni Polese

Giovanni Polese

Giovanni Polese

Giovanni Polese

LV cabling tower and tower-tower cabling installation: (1 week * 2 people)/wh  5 weeks LV test: (1 week * 2 people)/tw  10 weeks temp test: (1 week * 2 people)/wh.  5 weeks Infrastructure cabling and test (1 week * 2 people)/wheel  5 weeks Giovanni Polese

HV & LV components status Log scale Giovanni Polese

Components - numbers modello ordinati consegnati mancanti SY1525 2 A3485 - MACISTE 3 1 A3512N - HV 80 47 33 BC A1676 7 A3000 - CRATE 34 A3000FB - FAN 14 A3486S - MAO 5 A3009 - LV 60 57 Late delivery To modify Late delivery Giovanni Polese