Examining the project.

Slides:



Advertisements
Similar presentations
Estimating, scheduling and budgeting
Advertisements

Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
BSBPMG503A Manage Project Time 6.5 Develop Schedule The process of analysing activity sequences, durations, resource requirements and schedule constraints.
Project Time Management
Planning the project Project Management (lecture).
1 L U N D S U N I V E R S I T E T P rojektledning och Projektmetodik.
Lecture 6. Review of Lecture 5 Company strategic planning: mission and objective statements and competitive strategy. Planning Methods: Top-down, Bottom-up.
Examining the project ( seminar ). What is this chapter about? Gathering and analysing information for decision making in projects: – What has happened.
Objectives 4 Understand the basic concepts of project planning and control 4 Explain PERT and Timeline (Gantt) charts.
Chapter 3 Project Management Chapter 3 Project Management Organising, planning and scheduling software projects.
Resource analysis Project management (lecture + seminar)
12/2/2015 2:45 AM 1 PROJECT TIME PLANNING Process and Bar Chart Technique.
Resource analysis 1 Project management (seminar).
SOFTWARE PROJECT MANAGEMENT
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Project management. Software project management ■It is the discipline of planning, organizing and managing resources to bring about the successful completion.
© 2008 Prentice Hall6-1 Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and.
COMP201 Project Management.
A Brief intro to Project Management What can it do for you
Part II Project Planning.
Critical Path Analysis (CPA)
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Chapter 3: Cost Estimation Techniques
Implementation Plan I want to plan a project
Examining the project (lecture).
Plan Schedule Management
Project Planning & Scheduling
Software Project Management
Business System Development
Project Integration Management
Project Management and Information Security
TechStambha PMP Certification Training
Project Planning & Scheduling
2nd Task of Your Project „All you have to decide, is what to do with the time that is given to you.“ J.R.R. Tollkin Prof. Dr. Christian Bleis 1 Interaktionskompetenz.
The value of a project-oriented approach to IT and how we do it in IBM
CHAPTER 6 PROJECT TIME MANAGEMENT
Analysing the AoA network
INF 342 Enthusiastic Study/snaptutorial.com
PMIS Initiating a Project Application of Project Management Processes Project Charter Stakeholder Analysis and Stakeholder Register 2. Planning.
Software Project Management
Where We Are Now. Where We Are Now Defining the Project (100) Step 1: Defining the Project Scope Step 2: Establishing Project Priorities Step 3: Creating.
Part II Project Planning © 2012 John Wiley & Sons Inc.
Project Theory and Application
Controlling cost.
Analysing the AoA network
Project management Lecture 9
Lecture 6: Time-Cost Trade-Offs
Project Management Process Groups
CIS 210 Systems Analysis and Development
Project Management (lecture)
Project management (seminar)
Planning the project Project Management.
Resource Planning, Cost Estimation and Budgeting
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Controlling time.
Examining the project (seminar).
Teaching slides Chapter 13
SD5953 Successful Project Management Predecessors and Successors
Controlling time (seminar).
Setting up a project file
Project Management (lecture)
Importance of Project Schedules
Chapter 5 Architectural Design.
ENGINEERING MANAGEMENT (GE 404)
University of Debrecen Mongolian University of Life Sciences
CHAPTER 6 PROJECT TIME MANAGEMENT
Planning for Design Project
CHAPTER ONE: RESOURCE ALLOCATION AND SCHEDULING
Chapter 2: Building a System
Presentation transcript:

Examining the project

What is this chapter about? Gathering and analysing information for decision making in (and about) running projects: What has happened What is happening What should have happened What should be happening Process of gathering information: monitoring & controlling

Processes can be… Time related Cost related Or related to both

Time related processes Concerned with the activities in the project plan: Determination of logical interactions Estimation of durations Schedules and key event schedules (with identification of critical activities) Focus of control is on the future. If not, it will degenerates into a recording system Consistent unit of time throughout the plan (with the exemption of different levels of detail).

Cost related processes Goal: to complete the project within the financial budget, including forecasting and managing costs. Estimation of activity costs for the budget-plan are based on: Labor-hours (man-hours) Labor-rates (wage etc.) Material costs Service costs Set-up charges Rental charges Overheads Cost control is based on the budget Cost control is the principal means of control (esp. for the customer)

Resource related processes Aim: to plan the use and control of resources. Resources: anything (any input) that is required. Availability of resources means constraints for the project. Resource planning: Summation (aggregation) for each period Scheduling activities with resource needs Coming only after the scheduling of activities by logical interactions Resource control: monitor the usage of resources and report any deviations to the plan Lack of information on future resource needs can severely hamper a project. If a firm’s usual business is not planned with sufficient detail, it can lead to shortages if the project needs them.

Planning project duration Network techniques: a formal and explicit statement of policy, and also a communication tool Statement of Work (SoW) Work Breakdown Structure (WBS) Logical sequencing of the project More than one logic can be appropriate (depending on the project-context): Physical Functional Cost-centre etc. Assign the durations to the tasks and task groups Use iterative refining of the duration estimations Examination of the plan: ‘there is always a better way’ Project network techniques identifies the critical activities to focus the examinations on. Duration reduction always costs resources.

Reducing total project time (TPT) Systematic approach: Critical activities subjected to the questioning technique (if there is a quicker way) Can we modify the network logic to overlap or parallel activities? Is it acceptably possible to increase the risk taken? Can any resources moved or can the costs of increased resources be tolerated?

The questioning method Its backround is work-study Systematic questioning: the same questions on the same (rigid) way Two kinds of activities: ‘do’ activities: tasks advancing the project in themselves ‘ancillary’ activities: supporting ‘do’ activities

Questions to be asked when reducing the project time ? Purpose Place Sequence Person Means Overlapping Risk Trade-off Cost

Reduction by overlapping activities Activities following each other, depending on the interrelationships can be overlapped or paralleled. actvity name 1st day 2nd day 3rd day 4th day 5th day actvity ‘A’ actvity ‘A’ Original sequence actvity ‘B’ actvity ‘B’ actvity ‘A’ actvity ‘A’ Overlapping activities actvity ‘B’ actvity ‘B’ actvity ‘A’ actvity ‘A’ Parallel activities actvity ‘B’ actvity ‘B’

Reduction by increased risk Reducing (sub-)activities like: Testing Checking Proving Risk of failure will increase

Reduction of time by the transference of resources Trading-off resources: moving resources from non-critical activities to critical ones (to speed them up).

Reduction of time by increased cost („cost slope concept” or „crashing”) Increasing activity cost to reduce its duration. Cost-slope: cost of reducing duration time by unit time. We need network diagrams to do crashing.

Dangers of the 'cost-slope concept' It is difficult to find reliable figures for the changes in cost resulting from changes in duration times. Cost/time relations are frequently neither constant nor simple Not all resources are freely convertible to cost (problem of availability)

Reducing cost by increasing time Non-critical activities can be increased in time without extending the duration of the whole project (they have float time). In this case cost savings are the only effect.

Relationship between time and labour employed There is a minimum time below it is impossible to reduce duration.

The final network The network after reduction will be different than the one before: Logic and connections changed between activities Duration times altered New critical path or paths A test is needed to uncover illogicalities and to match the new activity schedule to the resource availabilities

Reading Textbook chapter 8

Thank you for listening