TGr Closing Report January 2005

Slides:



Advertisements
Similar presentations
LB84 General AdHoc Group Sept. Closing TGn Motions
Advertisements

[ Interim Meetings 2006] Date: Authors: July 2005
Resource Request/Response Discussion
March 2013 Opening Report Date: Authors: March 2013
Motions Date: Authors: January 2006
London TGu Motions Authors: January 2007 Date: Month Year
LB73 Noise and Location Categories
LB73 Noise and Location Categories
Waveform Generator Source Code
March 2014 Election Results
TGr Closing Report March 2005
TGp Closing Report Date: Authors: July 2005 Month Year
TGp Closing Report Date: Authors: July 2007 Month Year
Attendance and Documentation for the March 2007 Plenary
Attendance and Documentation for the March 2007 Plenary
[ Policies and Procedure Summary]
Motion to accept Draft p 2.0
November 2013 Opening Report
[place presentation subject title text here]
Motions Date: Authors: January 2006
TGp Motions Date: Authors: November 2005 Month Year
TGp Closing Report Date: Authors: March 2006 Month Year
TGu-changes-from-d0-02-to-d0-03
TGp Closing Report Date: Authors: May 2007 Month Year
TGu Timeline Date: Authors: March 2006 March 2006
TGr Closing Report March 2005
TGp Closing Report Date: Authors: March 2006 Month Year
Reflector Tutorial Date: Authors: July 2006 Month Year
TGv Redline D0.07 Insert and Deletion
TGu Timeline Date: Authors: January 2005 January 2005
TGv Redline D0.06 Insert and Deletion
ADS Study Group Mid-week Report
TGu Timeline Date: Authors: July 2005 July 2005
Selection Procedure Recommendation
TGu Timeline Date: Authors: July 2006 July 2006
TGu Timeline Date: Authors: November 2006 November 2006
IEEE P Wireless RANs Date:
TGu-changes-from-d0-01-to-d0-02
TGu Timeline Date: Authors: May 2006 May 2006
LB73 Noise and Location Categories
EC Summary of PAR Development
March 2012 Opening Report Date: Authors: March 2012
TGy draft 2.0 with changebars from draft 1.0
TGv Redline D0.10 Insert and Deletion
IEEE WG Opening Report – July 2007
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
Redline of draft P802.11w D2.2 Date: Authors:
November Opening Report
TGr Proposed Draft Revision Notice
TGr Closing Report May 2007 Date: Authors: July 2005
TGu-changes-from-d0-02-to-d0-03
[ Policies and Procedure Summary]
Liaison Report From Date: Authors: Month Year
Questions to the Contention-based Protocol (CBP) Study Group
January Opening Report
TGu Timeline Date: Authors: May 2006 May 2006
Motion to go to Letter Ballot
TGu-changes-from-d0-04-to-d0-05
Transition Nowhere Date: Authors: Sept 2005 Sept 2005
TGu-changes-from-d0-03-to-d0-04
TGu Timeline Date: Authors: January 2005 January 2005
TGu Motions Date: Authors: May 2006 May 2006
TGu Timeline Date: Authors: May 2005 May 2005
TGu Timeline Date: Authors: July 2005 July 2005
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
Use of KCK for TGr Management Frame Protection
TGu Timeline Date: Authors: July 2005 July 2005
TGr Proposed Draft Revision Notice
Selection Procedure Recommendation
TGp Motions Date: Authors: January 2006 Month Year
Presentation transcript:

TGr Closing Report January 2005 doc.: IEEE 802.11-02/xxxr0 January 2005 TGr Closing Report January 2005 Date: 2005-01-20 Authors: Notice: This document has been prepared to assist IEEE 802.11. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.11. Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures <http:// ieee802.org/guides/bylaws/sb-bylaws.pdf>, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair <stuart.kerry@philips.com> as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE 802.11 Working Group. If you have questions, contact the IEEE Patent Committee Administrator at <patcom@ieee.org>. Clint Chaplin, TGr Chair John Doe, His Company

Abstract TGr Closing Report January 2005 January 2002 doc.: IEEE 802.11-02/xxxr0 January 2005 Abstract TGr Closing Report January 2005 Clint Chaplin, TGr Chair John Doe, His Company

January 2002 doc.: IEEE 802.11-02/xxxr0 January 2005 Voting Results Written Ballot: The TG will eliminate this proposal from further consideration. Ballot Ballot Ballot Ballot Presentation Yes No Abstain Yes % TAP (Transition Acceleration Protocol) 21 87 12 19.44% AP Scanning 79 24 15 76.70% Multiple Concurrent Associations 77 26 15 74.76% Seamless BSS Transition Protocol 62 36 19 63.27% Proposal for Fast Inter-BBS Transitions 75 26 16 74.26% Fast BSS-Transition Tunnel 77 26 16 74.76% PEKM 59 47 12 55.66% Just-In-Time 2 Phase Association 13 102 4 11.30% Clint Chaplin, TGr Chair John Doe, His Company

Proposal Schedule and Down-Select Process (04-1121-02) January 2002 doc.: IEEE 802.11-02/xxxr0 January 2005 Proposal Schedule and Down-Select Process (04-1121-02) February 12th: Have final draft text and slides available on server. It is permissible to modify presentations and draft text, and that the modified presentations and modified draft text can be presented as long as the modified presentation and the modified draft text meet the four hour rule. March 14: give final proposals (final draft text and slides); carry out third step in selection process. Clint Chaplin, TGr Chair John Doe, His Company

Presentations No Packet Left Behind: 11-05-1646-00: Chris Durand January 2005 Presentations No Packet Left Behind: 11-05-1646-00: Chris Durand Proposal for a Consolidation Process: 11-05-0073-00: Michael Montemurro Clint Chaplin, TGr Chair

January 2005 Output Minutes (05/1620) Clint Chaplin, TGr Chair

January 2005 Goals for March for TGr Give presentations (complete draft text), with feedback from group; carry out third step in selection procedure Clint Chaplin, TGr Chair