November 4, 2015 Elke Ursin, PMP, CPM

Slides:



Advertisements
Similar presentations
Detail actions necessary to implement the interim housing mission in the post-disaster environment Identify command and control structures at all levels.
Advertisements

PD-Sw205w 1 1 FOSNRS 2: Passive, 2-Stage Biofilter Treatment Systems for Reduction of Nitrogen from OWS – Pilot Study Results April 7, 2014 Josefin Hirst,
BITHLO COMMUNITY WATER Utilities Department Orange County Board of County Commissioners January 8, 2013.
Metropolitan Council Environmental Services A Clean Water Agency Presented to the Environment Committee November 9, 2010 Information Item Master Water.
1 Wastewater Capital Improvement Program (CIP) Large Users Meeting March 15, 2010.
Springs Protection Options Septic System Evaluation Program Board of County Commissioners Meeting November 13 th 2012.
Clean Water Act Integrated Planning Framework Sewer Smart Summit October 23, 2012.
California’s New Onsite Wastewater Treatment System Policy Richard Sanchez, REHS, MPH President California Conference of Directors of Environmental Health.
Wekiwa Springs Septic Tank Retrofit – Project Update Utilities Department March 10,
Citrus County Planning Division Evaluation and Appraisal Report Citrus County Comprehensive Plan.
Feasibility Study of Constructed Wetlands for Wastewater Treatment and Wildlife Habitat Luna County, NM Public Meeting November 10, :00 am Presented.
Connecticut Department of Energy and Environmental Protection.
1 Risk Assessment Develop Objectives And Goals Develop and Screen Cleanup Alternatives Select Final Cleanup Alternative Communicate Decisions to the Public.
Decentralized Sewage System (DSS) Management Robert W. Scully, PE Department of Public Health.
1 Innovative Use of Administrative Order Authority Management, Operation and Maintenance (MOM) Program.
WEKIVA BASIN ONSITE SEWAGE TREATMENT AND DISPOSAL SYSTEM STUDY Bureau of Onsite Sewage Programs Division of Environmental Health Florida Department of.
Massachusetts Public Health Inspector Training Wastewater Certificate Program (MA PHIT WW) Session 5: Design and Plan Review— Non-Conventional Systems.
The New Mexico Experience Practice Model Peer Network Webinar September 10, 2012.
Alternative Onsite Sewage Systems: New Regulations & Issues for Localities Potomac Watershed Roundtable January 7, 2011 Thomas E. Crow, Director Division.
WASTEWATER FACILITIES PLANNING Public Information Session August 29, 2013 Town of Clinton, CT Water Pollution Control Commission.
Water Supply Planning Initiative State Water Commission November 22, 2004.
1 Onsite Systems, Nutrients, and the Wakulla Springshed By Eberhard Roeder, Ph.D., P.E. Bureau of Onsite Sewage Programs FL Dept. of Health, Division of.
Orange Creek Basin Management Action Plan Alachua County Commission December 11, 2007 Fred Calder, FL DEP (850)
Water Quality Program Financial Assistance Progress and Plans for Meeting RCW Requirements (Joint Legislative Audit and Review Committee)
1 Questions Addressed What are the options for reducing pollutant inputs to Lake Tahoe? Pollutant Reduction Opportunities.
Stationary and Area Source Committee Update OTC Committee Meeting September 13, 2012 Washington, D.C. Hall of the States 1.
Orange County Board of County Commissioners Update on USEPA Rulemaking for Numeric Nutrient Criteria Utilities Department January 26, 2010 Utilities Department.
Lake Jesup BMAP Adoption Environmental Protection Division February 23, 2010.
Wisconsin’s Nutrient Reduction Strategy for Water Quality Wisconsin Crop Management Conference January 16, 2014 Ken Genskow, PhD Associate Professor, Department.
KWWOA Annual Conference April 2014 Development of a Kentucky Nutrient Strategy Paulette Akers Kentucky Division of Water Frankfort, KY.
Florida Enterprise GIS Workgroup Collaborating and sharing to empower and enhance GIS services and resources statewide Sara Wander, GISP
Ordinance Amending Chapter 37 Orange County Code Utilities Department October 21,
1 Community-Based Care Readiness Assessment and Peer Review Overview Department of Children and Families And Florida Mental Health Institute.
St. Johns River Water Management District Central Florida Water Initiative Water Supply Plan Mike Register, P.E., Director Division of Water Supply Planning.
Indian & Northern Affairs Canada March 10, 2010 On-Site Water and Wastewater Systems - First Nations Water Symposium Matthew Hough, P.Eng. Infrastructure.
Santa Rosa Plain Groundwater Management Planning Update Fall 2013.
BMAP Forward & Septic Tanks 2012 Environmental Symposium John P. Pappas, P.E. Department of Public Works.
1 Staff Public Workshops Fall 2011 Policy for Siting, Design, Operation and Management of Onsite Wastewater Treatment Systems San Luis Obispo: October.
TTWG Report & Technical Topics SRRTTF Meeting Dave Dilks March 16, 2016.
Planning & Community Development Department General Plan Implementation Strategy City Council February 29, 2016.
S ACRAMENTO W ATER R ECYCLING C OALITION SRCSD Goethe Rd 9-11 am Slide 1 May 4, 2011.
Biosolids Public Workshop March 22, 2016
Chromium 6 Regulation Corrective Action Plan October 6, 2015
Multi-state Corridor Pooled Fund Program
Drought Research and Outreach at CIG
Homeowner Responsibility
SEPTIC TO SEWER Guidance Tool
Utilities Department Wedgefield Water November 28, 2017.
Building a Phase III WIP for Wastewater, Stormwater & Septic Systems
Sacramento County Stormwater Quality Program
Drww general membership meeting
Mulberry Watershed Management Plan
A Training Design Tool for Stakeholders Tasked with Evaluating New and Innovative Treatment Technologies for Small Drinking Water Systems Be sure to type.
Anne Arundel County Maryland
Environmental Management Commission Information Item January 8, 2015
Klamath Tracking and Accounting Program
Water Quality Trading Advisory Committee MDA Headquarters
AIF Florida Water Forum
INDOT Storm Water Management
Water Quality Trading Advisory Committee MDA Headquarters
County Water Resources Programs in the Santa Margarita Basin
Homeowner Responsibility
BAT Work Group.
Contract Award for the Colorado Street Bridge Suicide Mitigation Enhancements Project City Council May 20, 2019 Item # 7.
Sacramento County Stormwater Quality Program
DEVELOPMENT IMPACT FEES AB 1600 UPDATE
Space Coast TPO State Road (S.R.) 528 Update
THE STATE OF SEPTIC What Are We Going To Do With All The Septic Tanks?
Indiana Finance Authority (IFA)
SHOAL CREEK WATERSHED ACTION PLAN
Presentation transcript:

2015 Onsite Wastewater Mega-Conference Florida’s Innovative Approach to Nitrogen Reduction November 4, 2015 Elke Ursin, PMP, CPM Environmental Health Program Consultant Florida Department of Health Division of Disease Control and Health Protection Bureau of Environmental Health

Background In 2008, the Florida Legislature directed the Department of Health to develop cost-effective nitrogen reduction strategies for onsite sewage treatment and disposal systems (OSTDS). In January 2009, the Department awarded a 6-year, $5 million contract to a project team made up of nationally recognized experts led by Hazen and Sawyer, P.C. The Department and its Research Review and Advisory Committee (RRAC) oversee the project, with input from the Department of Environmental Protection. The contractual portion of the project is complete, with a total contract spending of approximately $4.7-million Dock and diving platform on Santa Fe River O'Leno State Park, Florida, 1940 Photo Credit: State Archives of Florida, Florida Memory, https://floridamemory.com/items/show/152931

Nitrogen Reduction Options for Septic Systems

Image Credit: Hazen and Sawyer Primary Study Areas Objectives Develop cost-effective, passive strategies for nitrogen reduction from onsite sewage Characterize nitrogen removal in the soil and shallow groundwater Develop simple models on fate and transport of nitrogen in soil and groundwater Task A - Prioritize technologies for testing at existing home sites and perform controlled tests at a test facility to develop design criteria for new passive nitrogen reduction systems. Task B - Install top-priority nitrogen reduction technologies at existing homes, with documentation of performance and cost. Task C - Perform field evaluations of nitrogen reduction in Florida soils and shallow groundwater, and provide data for calibration of a simple planning model (see Task D). Task D - Develop a simple fate and transport model of nitrogen from OSTDS for use in assessment, planning, and system siting. Image Credit: Hazen and Sawyer

“Passive” Nitrogen Reduction Systems Reduce effluent N using reactive media for denitrification and a single liquid pump, if necessary.  Wastewater from home Dispersal Stage 1 (nitrification) Stage 2 (denitrification) nitrification media: sand & expanded clay denitrification media: lignocellulosics & elemental sulfur

Image Credit: Hazen and Sawyer Test Facility Accomplishments: Facility constructed at the University of Florida Gulf Coast Research and Education Center in Wimauma, to evaluate pilot-scale configurations for full-scale systems, resulting in options that consistently reduced nitrogen by 95% or more. Image Credit: Hazen and Sawyer

Nitrogen Reduction at Field Sites Accomplishments:   Seven full-scale systems installed at existing homes throughout the state with multiple configurations; sampling completed for two systems with the remaining systems to complete in February 2015; preliminary results indicate about 90-95% nitrogen reduction prior to the drainfield. Full Scale Concepts Complement Existing Septic Systems

In-Tank Passive Nitrogen System In-tank two stage biofilter with recirculation stage 1, dual media stage 2 lignocellulosic (2a) followed by elemental sulfur (2b) Media longevity: 33 years (wood chips) and 47 years (sulfur) System performance: 98% nitrogen reduction (75 mg/L to 1.8 mg/L) Energy costs: $3 monthly / $36 annually Standardized costs*: $12,794 new / $15,269 retrofit existing * 300 gallon per day system with $4,000 estimated conventional system cost (tank and drainfield)

In-Ground Passive Nitrogen System In-ground stacked biofilter, single pass stage 1 over stage 2 lignocellulosic Media longevity: 135 years (wood chips) System performance: 64% nitrogen reduction**(55 mg/L to 20 mg/L) Energy costs: $0.71 monthly / $8.55 annually Standardized costs*: $12,794 new / $15,269 retrofit existing * 300 gallon per day system with $2,250 estimated conventional tank cost ** Performance may have been significantly improved with design and construction revisions based on lessons learned in this study.

System cost estimates and cost comparisons to existing approved systems Shows how much the system costs AND how much it costs over lifetime Present worth=current worth of a future sum of money or stream of cash flows given a specified rate of return Capital Cost= total cost needed to bring a project to a commercially operable status 10

Image Credit: Hazen and Sawyer Case Study: Groundwater Monitoring BEFORE AFTER Four detailed soil and groundwater assessments were completed at existing home sites throughout Florida to evaluate existing septic systems over a 12-month period. One of these sites coincided with the test site for one of the experimental treatment systems. At this home site a marked improvement in groundwater nitrogen concentrations occurred after installing the passive system. In Figure 5, sampling point B08 (red dashed circle) showed a Total Nitrogen concentration of over 35 mg/L before installation of a passive nitrogen reduction system and at background levels (0-5 mg/L) within a few months after installation. The nitrogen plume under the drainfield disappeared. Image Credit: Hazen and Sawyer

Image Credit: Colorado School of Mines Nitrogen Model Image Credit: Colorado School of Mines

floridahealth.gov/FLWMI To help facilitate the wastewater infrastructure management paradigm, we need to first understand where the wastewater goes. The data is fragmented between state agencies and public and private utilities. Florida DOH decided to create a centralized tool, using a data map, linking each built property in the state to information about the corresponding drinking water source (Public Water or Private Well) and the wastewater treatment method (Central Sewer or Onsite Septic). Visit the project website to learn more about what we are doing and where we are with this project. GOAL: Map the drinking water source and wastewater treatment method for every built property in Florida

Final Department Report Due 12/31/2015 Containing: Analysis of field monitoring of performance and cost of technologies Analysis of soil and groundwater sampling to determine how nitrogen moves Analysis to show how nitrogen is affected by treatment in Florida-specific soils Final reporting on all tasks with recommendations for science-based nitrogen reduction options for septic systems

Implementation Plan: Goal: Make tools available to reduce nitrogen contributions from septic systems

1 Implementation Plan Approve baseline conventional septic system enhanced for nitrogen reduction (in-ground system) Requires rule change . Status: Tabled by Technical Review and Advisory Panel on October 22, 2015 for more details Description: Engineer-designed nitrogen-reducing liner beneath a conventional drainfield. Benefit: Low-cost alternative to other performance-based nitrogen-reduction systems. Requires no operating permit or maintenance contract.

2 Implementation Plan Incorporate nitrogen study systems as approved performance-based systems Requires development of system specifications Status: Being developed, with target implementation in December 2015

3 Implementation Plan Develop new nitrogen reducing systems section in Chapter 64 E-6 Florida Administrative Code Requires rule and possibly statute changes Status: Requires multiple public meetings, with target implementation in September 2016

4 Implementation Plan Provide public education and training on nitrogen reduction strategies Requires training development and message standardization Status: Ongoing

5 Implementation Plan Share planning-level tools to assess nitrogen reducing strategies (inventory, model) Requires coordination with local stakeholders Status: Ongoing

6 Implementation Plan Determine funding solutions for nitrogen reduction efforts Requires coordination with Department of Environmental Protection and local stakeholders Status: Pending

Basin Management Action Plan (BMAP) Activities BMAPs with significant septic system contributions are planned to have an advisory committee focused on developing locally appropriate solutions. Three-pronged approach: Projects Research Education FDEP has had several public meetings over the past month for BMAPs in development. The focus of these meetings has been to talk about how they are calculating loading from multiple sources as well as discussing how they plan to move forward with addressing OSTDS contributions.   The OSTDS strategy has a 3 prong approach: finding projects that will make a difference, conducting research to best address unknowns, and provide public education and outreach. FDEP is starting to reach out to county government folks for areas that are pre-BMAP to discuss this strategy: Springs Coast: Citrus, Pasco, Hernando Silver and Rainbow Springs: Marion Volusia Blue Springs: Volusia We have invited Kevin Coyne, the BMAP program administrator to present to our BMAP workgroup, and will specifically invite those pre-BMAP counties once we have a final list from FDEP. We have advertised a position in the Onsite Sewage Program headquarters office that has coordination of FDOH BMAP activities as one of their main job responsibilities. We hope that this position will allow for us to present a unified approach to BMAP activities relating to Environmental Health activities.

Basin Management Action Plan (BMAP) Activities BMAPs with significant septic system contributions are planned to have an advisory committee focused on developing locally appropriate solutions. Results Will Benefit Floridians by Providing… Field tested designs for “passive” systems effective at removing nitrogen and user-friendly System cost estimates and cost comparisons to existing approved systems Nitrogen fate and transport model for estimating nitrogen contribution from onsite systems Options for nitrogen reduction onsite systems in sensitive watersheds where sewers are not feasible Looking for people to help with development of recommendations for science-based nitrogen reduction options for onsite wastewater systems. Having a public online meeting at the end of the month to start discussing the results and conclusions of this project and begin work on a final report to the legislature. Seeing Silver Springs in glass bottom boats Photo Credit: State Archives of Florida, Florida Memory, http://floridamemory.com/items/show/161202

Elke Ursin, PMP, CPM Elke.Ursin@flhealth.gov 850-245-4070 x 2708 Environmental Health Program Consultant Florida Department of Health Division of Disease Control and Health Protection Bureau of Environmental Health