Data Coordination Working Group (DCWG) Status Report

Slides:



Advertisements
Similar presentations
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Advertisements

1 IEEE Power Engineering Society IEEE Standard 762: Standard Definitions for Use in Reporting Electric Generating Unit Reliability, Availability, and Productivity.
Standards Review Subcommittee Update February 1, 2011.
1 Report of the Planning Coordination Committee Report to the WECC Annual Meeting April 20, 2006 Robert Jenkins, PCC Chair.
WECC TEPPC – March 14, 2008 PCC – TEPPC Coordination Roles & Responsibilities – RE Kondziolka 1 PCC – TEPPC Coordinating Roles and Responsibilities WECC.
0 NERC PC Issues Update WECC PCC Meeting NERC PC Issues Update WECC PCC Meeting John Simpson, Reliant Energy Planning Coordination Committee Spokane, WA.
0 NERC PC Issues Update WECC PCC Meeting NERC PC Issues Update WECC PCC Meeting John Simpson, Reliant Energy Planning Coordination Committee Albuquerque,
NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
1 PER-005 Update Impact on Operators System Operator Conference April and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services.
Why TADS Is Needed No systematic transmission outage data collection effort exists for all of North America Energy Information Administration data (Schedule.
Data Coordination Working Group (DCWG) Status Report Chuck Chakravarthi Chair, DCWG April 2008.
Compliance Performance Measure Proposals and Preliminary Trends Greg Pierce – Chair, Performance Measures Task Force Compliance and Certification Committee.
LTRA Data Collection and Analysis Process. Data Collection Process  ERO-LTRA2008.xls workbook is sent as an attachment to the Data Request letter  Workbook.
July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE.
Data Coordination Working Group (DCWG) Meeting September 18 th & 19 th Energy Information Administration (EIA) Washington, DC Room 2E-069.
Integration of Variable Generation Task Force (IVGTF) & Emerging Issues Mark Lauby Manager, Reliability Assessments
Bill Lewis, Compliance Team Lead NERC Reliability Working Group May 16, 2013 Texas RE Update Talk with Texas RE April 25, 2013.
Standards Review Subcommittee Update August 17, 2010.
DCWG Meeting Action Items. DCWG Action Items 12/03/07 ● Conference Call for DCWG on 12/19 ● Periodic Conference Call to Inform ● NERC Staff to send along.
WECC Standards Update Steve Rueckert – Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Data Coordination Working Group (DCWG). 2  Met with EIA  Discussed DCWG Scope  Reviewed Action Items from the Last Meeting  Discussed DCWG Work Plan.
George Zhou, VGITF Chair October 14, 2015 Salt Lake City, Utah Variable Generation Interconnection Task Force Update to PCC.
RAWG Agenda Item LAR Data WECC Staff. Data Elements Generator information – Existing – Changes Monthly Peak Demand and Energy (actual year and.
CCC Administrative Tasks November 19, General Tasks Schedule, organize and facilitate 4-5 CCC meetings/year Develop agenda, materials and minutes.
Section 4.9 Work Group Members Kris Hafner, Chair, Board Member Rob Kondziolka, MAC Chair Maury Galbraith, WIRAB Shelley Longmuir, Governance Committee.
Path Operator Implementation Task Force Vic Howell, Vice Chair Report to OC March 22, 2016.
TEPPC Review Task Force Ian McKay, Chair, TEPPC W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
ME 3.0 to ME 5.0 ME3.0 review scheduled during the Joint NDSWG/NATF meeting in July. There were approximately 180 comments on the ME3.0 paper. Deadline.
Reliability Standard TPL Transmission System Planned Performance for Geomagnetic Disturbance Events September 28, 2016 TPL Standard Status.
Kenneth Silver Los Angeles Department of Water & Power
Risk Assessments: Guidelines for Completing
PLWG Review 6.9 and the Interconnection process
Planning Geomagnetic Disturbance Task Force (PGDTF) Update to the ROS
WECC Regional Standards Update
Commercial Operations Sub-Committee Update to TAC
Path Operator Implementation Task Force
Business Practices Subcommittee Update
Implementation Strategy July 2002
Global Youth Tobacco Survey (GYTS): Proposal Development
Safety Responsibilities
Kenneth Silver Los Angeles Department of Water & Power
Reliability Assessment Guidebook (RAG): Status Report
Merrill Brimhall – Engineer, Staff
Compliance Performance Measure Proposals and Preliminary Trends
Reliability Assessment Guidebook (RAG): Status Report
Rates & Regulatory Updates
Integration of Variable Generation Task Force (IVGTF) & Emerging Issues Mark Lauby Manager, Reliability Assessments
Cold Snap Task Force Update
Chapter Elections: Incorporated & Unincorporated
Impacts and Actions Resulting from the August 14, 2003 Blackout
CIPC Executive Committee Update-1
Joint Working Group 2009 Meeting in Suffolk APR VTC 16 MAY VTC 16 JUNE
Mark S. Orloff, MD Regional Councillor
Integration of Variable Generation Task Force (IVGTF)
Workshop Session 1: Overview
NERC Critical Infrastructure Protection Committee (CIPC) Executive Committee Public Release 29 September 2005.
ICIS-NPDES Expanded Steering Committee Meeting EPA Opening Remarks
Workshop Session 1: Overview
NERC Reliability Standards Development Plan
Integration of Variable Generation Task Force (IVGTF)
LTRA Data Collection and Analysis Process
Randy Spacek AvistaCorp, RWG chair
Data Coordination Working Group (DCWG) Status Report
Grace Anderson Chair, Budget Work Group May 16, 2018
NERC Reliability Standards Development Plan
Data Coordination Working Group (DCWG)
Elizabeth A. Pomfret, MD, PhD Regional Councillor
Region 8 Meeting Harvey Solomon, MD
Grace Anderson Chair, Budget Work Group May 16, 2018
MAC Input on Section 4.9 Review
Presentation transcript:

Data Coordination Working Group (DCWG) Status Report Chuck Chakravarthi Chair, DCWG April 2008

DCWG Meeting April 9-10, 2008 (Washington, DC) Met with EIA Discussed: EIA’s data needs DCWG Scope Action Items from the Last Meeting and status DCWG Work Plan Confidence Levels for Capacity margins reported by the regions Regional Feedback on Summer/LTRA data collection. NERC’s current & future data analysis approach

Work Status: Joint Meeting with EIA (Task 6 of DCWG Work Plan) Meeting held on April 9, 2008 in Washington D.C. EIA to write letter to NERC outlining (Task 7 of DCWG work plan): Needed Improvements to Current EIA 411 Data Collection Future Areas of Collaboration NERC will work with EIA on forth coming changes related to Presidential Permitting for Canadian/Mexico Interconnections NERC will work with EIA to Update NERC/EIA MOU NERC to send letter to EIA thanking them (Bob Schnapp) for support on Schedule 7 (Transmission Outage Data) & Schedule 3. DCWG formed a task force, headed by Mark Lauby of NERC, to re-design Schedule 2 (Unified Generator Database): To Support NERC’s LTRA effort To closely match EIA 860 to meet EIA needs EIA desires Spring/Fall Meetings with DCWG Fall meeting to be held prior to the release of NERC’s LTRA NERC will stay abreast of EIA’s work with FERC on DSM document

Work Status: DCWG Meeting Meeting held on April 9-10, 2008 in Washington D.C. Discussed Posting of Meeting Materials Formed a task force defining confidence levels for capacity data reported by regions (Fedora, Simons & Molesky along with a representative from SERC and NERC) Will seek EIA feedback on findings SERC to summarize data submittal recommendations based on regional feedback on the Summer/LTRA data collection Will be presented at April RAS meeting Request RAS move the LTRA due date to May 1 corresponding to EIA’s new due data of July 15, 2008 NPCC Representative (Fedora) will perform a trial run to demonstrate risk assessment approaches to capacity margin analysis (Supporting Task 4 of the DCWG Work plan) Next DCWG conference call scheduled for 6/18/08 Seasonal and LTRA questionnaire to be modified based on feedback from DCWG members