Background Exit Reform Modification expected to be implemented 01 April 2009 But, decision has not yet been received Number of procedures/documents need.

Slides:



Advertisements
Similar presentations
NTS Exit Capacity - Amending the DN Adjustment Window Transmission Workstream, 1 July 2010.
Advertisements

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
The Treatment of “Spare / Sterilised” Capacity – follow up Draft for discussion purposes only.
1 CODE MODIFICATION PROPOSAL No 0243 Amendments to the process for initialisation of Enduring NTS Exit (Flat) Capacity at the Moffat NTS Exit Point Presentation.
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Entry and Exit Investment Process Outline Transmission Planning Code Workshop 3 5 th June.
Mod 214 – Reservation of firm NTS Exit Capacity at new NTS Exit Points in the transitional period Steve Rose.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
UNC0376A - Increased Choice when applying for NTS Exit Capacity – User Pays initial thoughts Review Group August 2010 Transmission Workstream 01.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod 376: Increased Choice when Applying for Enduring NTS Exit Capacity Jeff Chandler - 5 th May 2011 Transmission Workgroup - Elexon 1.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
Transitional Exit Capacity Proposals -Update Transmission Workstream, 1 Dec Nov 05.
Transitional offtake arrangements – Ofgem Initial Proposals on transitional incentives 6 October 2005.
Interactions with the implementation of RIIO-T1
SGN Modification Proposal Amendments to UNC TPD OCS Process Long Term Allocation of Capacity for the Transitional Period.
Exit Capacity Release Methodology Statement
Exit Capacity User Commitment – Transmission Workstream update
Transmission Planning Code
Transmission Workgroup 4th October 2012
Transmission Workstream, 6 August
Removal of a Users ability to allow Quarterly NTS Entry Capacity to lapse Chris Shanley.
UNC Trader User – Licence obligations
Transmission Workgroup – 1st December 2011
NPA 306/639 (Area Code) Relief in Saskatchewan
Capacity Methodology Statements: Impact of Mod 452
Capacity Methodology Statements
NPA 450/579 (Area Code) Relief in Quebec
Mod 0452 (PARCA) – Further thoughts
Exit Capacity Substitution and Revision
7th July 2011 Transmission Workgroup - Elexon
Publication of Zonal Flex Data
COR1360 NTS Exit Reform (Mod 0195AV) UK-Link Committee 11th June 2009
Update on Exit Capacity Substitution and Revision
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Enduring NTS Exit Capacity Arrangements - Update
NPA 403/587/780/825 (Area Code) Relief in Alberta
Simon Trivella –5th May 2011 Transmission Workgroup - Elexon
Transmission Planning Code Review
Flow Swaps at NTS / LDZ offtakes
UNC0376S – Increased Choice when applying for NTS Exit Capacity
UNC Modification Proposal 0385 Inclusion of DNOs as Users in User Pays Arrangements Phil Lucas 7 June 2011.
PARCA Timeline.
Transmission Workstream – Partial Assignment
Wales & West Utilities Mod 0671 User Commitment
Proposed Transitional Gas Exit Arrangements
Revised Tender Timescale for DN Interruption Arrangements
OCC & Standard Commodity Changes
Gas Customer Forum DN Interruption Update - Introduction
Entry Overrun Calculation
Reinstatement of NTS Interruption
Generic Revenue Driver Methodology
February 2007 Note: Source:.
Information Provision for Transitional Exit Capacity
Open Letter - Summary of Responses
Transmission Workstream 1st February 2007
GRP Progress & Plans The GRP project was established to deliver an updated design utilising fully supported hardware and software for Gemini. GRP is replacing.
Transmission Workgroup July 2012
Gemini Code Contingency Review
Review Group 221: Review of Questions from Session 2
195AV “Future work” – system flexibility
Incremental Entry Capacity Release Methodology Statement
Transmission Workstream 4th December 2008
Revised Tender Timescale for DN Interruption Arrangements
Transmission Workstream 05 November 2009
Gas Customer Forum 28 July 2008
Presentation transcript:

Exit Reform : Delay to Ad-hoc Application Principle until 01 October 2009

Background Exit Reform Modification expected to be implemented 01 April 2009 But, decision has not yet been received Number of procedures/documents need to be in place/completed prior to capacity being applied for e.g. ExCR Initialisation

Proposal NG NTS is working to the assumption that 195AV will be implemented 01 April 2009 which will allow Ad-hoc Applications from 01 April However: Licence requires ExCR to be submitted 01 April Code will require initialised rights to be notified 01 May NG NTS therefore proposes that: The July Annual Application Window in 2009 will be the first opportunity for capacity applications Ad-hoc Applications will be permitted from 1 October 2009 to 30 June 2010 and for the same period each year thereafter NB, ALL CAPACITY CANNOT BE UTILISED UNTIL 01 OCTOBER 2012

Reasoning Believe it is not appropriate to receive capacity applications until the ExCR Methodology Statement has been approved and the rules defined Similarly, this would prevent applications being submitted prior to Users knowing their Initialised rights All booked capacity begins from 01 October 2012 Ad hoc Applications submitted prior to July 2009 could only apply to capacity from 01 Oct 2012, therefore the July 2009 Application Window will provide the same opportunity

Conclusion Imperative that ExCR is in place before Applications received Opportunities to acquire capacity Initial Holdings notified 1 May 2009 July Annual Application window from 2009 and each year thereafter Ad-hoc Applications form October 2009 to June 2010 and for the same period each year thereafter An Ad-hoc application between April and June 09 could not acquire capacity before October 2012 so no disadvantage in waiting for the July window