The project´s specifications, and the connection between the contract´s different specifications.

Slides:



Advertisements
Similar presentations
Field Orders on Construction Contracts Guidance Document CLC-8 May 13, 2013.
Advertisements

Submitting an Online Bid with BidCentral Online Bidding for Subcontractors (BOBS) presented in partnership with.
Unbalanced Bids Part – Unbalanced Bids March 1, 2001.
Open Procurement Process Gauteng Provincial Treasury Process Mapping 30 th October 2014.
Presentationby Construction Association of Bhutan.
Chapter 12 Estimate Summaries and Bids. Bid Summaries The format of the summary depends for what the estimate is to be used. –Ordering materials –Calculating.
ITWOcx Tenders Quick overview of current development Version 1.0 May 22nd-2014.
Leo Castillo | May 20, 2014 Introduction to Lighting Incentives & Process for Common Area Lighting.
Tips: * Just delete the page you don’t like. * Save the page you want only before submit to us.
Click on Login after filling User Id. Click on Select Certificate.
Activities CTC-415. Activity Consumes Time Usually consumes resources (cure time for concrete) Definable start and finish Assignable – V. important –
The HA will reinforce the commitment of stakeholders to delivering quality housing at two levels - (a) At the strategic level, we will draw up a Quality.
Supplier ESH Management Process Jose Valdez, CHST Benchmark Consulting Group, LLC.
JSC Action # 2621 Hurricane Allowability/Charging Policy Jose Garcia /5/06.
Accessing BidCentral Online Bidding for Subcontractors (BOBS) presented in partnership with.
Project Management. Managing Capital Projects  What is a Project?  Something that: has a beginning and an end, and is carried out to meet established.
Bridge Engineering Section Bridge Rehabilitation.
Ron Hallmark 20 April 2010 Keys to a Successful Contractor Safety Program STEPS.
Specification & Quantities Estimating
1 Chapter 8++ The Final Design Report. 2 Motivation The main purpose of the design report is to provide all the information necessary to: The main purpose.
Lesson 19: Site Development with FrontPage 2003 – Advanced Features.
Construction Safety at the UW Ron Fouty, Safety Director Capital Projects Office University of Washington.
Managing contractors Tender Appraisal Contract Contact Meetings Delivery End of contract.
Tender Portal Home Page Entry to secure area Adverts viewed in three areas of the site.
Productivity. PLANNING  The key concept behind Internal Traffic Control is PLANNING for worker safety.  ITCPs integrate other aspects of planning to.
PROPOSALS.
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
AT&T Privacy Bird Screen Shots For more information see
MP-RFP Status Report Buzz Rigsbee. MP-RFP Status 8 = 2 no bid + 3 Hi bids + 3 finalists Ran pricing exercise to compare values Eval Team doing individual.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4134/EN/LHC Supply and Commissioning of HVAC Systems for Five LHC Surface Buildings B.
Source Page US:official&tbm=isch&tbnid=Mli6kxZ3HfiCRM:&imgrefurl=
Dept user Logs in from Home Page for Bid Opening Login with user name and password.
What is Contracts? When two or more persons have common intention communicated to each other to create same topic & done the agreement that is called.
Subcontractors and Suppliers Procedures for Receipt of Payment.
Graham Lancaster & d’Arcy Lancaster Bidding to Win Workshop.
UNIVERSITY OF PALESTINE FACULTY OF APPLIED ENGINEERING & URBAN PLANNING CIVIL ENGINEERING DEPARTMENT ENGINEERING PROJECT MANAGEMENT CHAPTER 3 INTRODUCTION.
FINAL PROJECT 7TH SEMESTER ARCHITECTURAL TECHNOLOGY AND CONSTRUCTION MANAGEMENT M ARTA G AGO P ENALBA PROJECT : 32 DWELLINGS IN VEJLEVEJ.
Environmental Requirements for North West Grid Floodlight Project Compiled by: Silindile Mbhele.
Путешествуй со мной и узнаешь, где я сегодня побывал.
Cooperation between CERN and Ukrainian Industries 2017
6 Oct 2016 Johan Tønsberg (Manager: Contracting, Procurement & Supply Chain) Maersk Oil (Norway)
Developing a Business Plan for your Agricultural Operation
The project's conception: A feasibility study is done
BUS 505 Innovative Education-- snaptutorial.com
Page 1. Page 2 Page 3 Page 4 Page 5 Page 6 Page 7.
PHI 445 MART Perfect Education/ phi445mart.com.
Awarding Criterion for late tender: the lowest bid- why?
Awarding Criterion for late tender: the lowest bid- why?
E-Commerce: Mechanisms, Platforms, and Tools
[insert category name] [insert date]
Planning for success is critical
Planning is a critical success factor
CIVL 493 CONSTRUCTION MANAGEMENT
Veterans Federal Procurement Opportunities
The Documents Necessary for Tendering a Project for Bids:
The Documents Necessary for Tendering a Project for Bids:
التسعير الفصل الرابع عشر.
Procurement Plan and Procedures Code of Standards of Conduct
Meeting of the LCLS Facilities Advisory Committee
Time schedule for implementation as main contractor
Trade 1 Following is an example of where to get the information for the first trades The pages needed are the Settlements page; the Contract Specs.; and.
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
TCU-PROJECT: 7TH Semester Course
Lecture 10 PROCUREMENT Ferdinand FASSA.
Data Flows Supporting The 2008 Annual Tender Process
Recap QUANTITIES Taking out quantities
6th. Semester Schedule: 1st. Week
The Form of Procurement for the EcoHome Project
QUANTITIES Taking out quantities
Apply Bid Bond– Bid Bond Guarantee Process
Presentation transcript:

The project´s specifications, and the connection between the contract´s different specifications

Used for orientation about contract (Adm. Level) WORK SPECIFICATIONS: CASE SPECIFICATIONS: Used for orientation about contract (Adm. Level) WORK SPECIFICATIONS: Used for pricing the contract (Executive Level –site, etc.) BUILDING COMPONENT SPECIFICATIONS: Used for execution of works on site (Operative Level) FOR THE WORKS CONTRACTOR´S OPERATTIVES (WORKERS) ON SITE FOR ORIENTATION OF ALL THE CONTRACTORS ON SITE FOR EACH SPECIFIC TRADE /WORKS CONTRACTOR ON SITE

WORK SPECIFICATIONS: Used for pricing the contract BUILDING COMPONENT SPECIFICATIONS: Used for implementation of works on site

The Tender Forms (Bidding Forms) – on which the bid is to be submitted LEVEL 1: FRONT PAGE LEVEL 2: SUMMARY OF WORKS LEVEL 3: BREAKDOWN