Inmarsat C – I3 > I4 migration

Slides:



Advertisements
Similar presentations
ICAO Seminar on the Implementation of Datalink and SATCOM Communications Bangkok, November 2003 Satellite AIRCOM Infrastructure Reinforcement.
Advertisements

Yokogawa Network Solutions Presents:
INTERNATIONAL SATELLITE COMMUNICATIONS SUCCESSOR SYSTEM (ISCS)
Report of the WWNWS-SC to IRCC 6 May 2014 Inter-Regional Coordination Committee.
Copyright Autoliv Inc., All Rights Reserved AEU Ariba Direct Material Suppliers training Offline version May 2011.
Safety Radio GMDSS.
Series DATA MANAGEMENT. 1 Why ? Alarm/Status Notification –Remote unattended sites »Pumping stations –Pharmaceutical/Plant maintenance.
What is Influx InfoTech ?. About Influx InfoTech IT products & services company Delivering technology driven business solutions Hi-end infrastructure,
The OSI Model A layered framework for the design of network systems that allows communication across all types of computer systems regardless of their.
Adding New Services making a difference! Lars Ahlgren Sales Lead Dynamics Services Microsoft Dynamics.
Customer Forum OTech’s New Web Publishing Service Web Services Section – April 29, 2015.
NBTC/ITU Workshop on Cross-Border Frequency Coordination June , 2015 Bangkok, Thailand.
1 © 2003, Cisco Systems, Inc. All rights reserved. CCNA 1 v3.0 Module 9 TCP/IP Protocol Suite and IP Addressing.
XA R7.8 Upgrade Process and Technical Overview Ruth Anne Pharr Sr. IT Consultant, CISTECH Inc.
Managed Communications With global communications connectivity… State-of-the-art design… Professional engineering services… On the ground, at sea and in.
CCNA 1 v3.0 Module 9 TCP/IP Protocol Suite and IP Addressing
C-MAP Norway AS One Stop Shop for Nautical Information FARGIS Seminar Oslo 16/17 March,2004.
INMARSAT-FLEET 77. In response to the ever increasing need for computer-based, cost effective and secure communications system at sea, Inmarsat has developed.
Computer Emergency Notification System (CENS)
Enhanced Group Call (EGC)
Maritime Safety Information Under the GMDSS

STASIS Technical Innovations - Simplifying e-Business Collaboration by providing a Semantic Mapping Platform - Dr. Sven Abels - TIE -
SONIC-3: Creating Large Scale Installations & Deployments Andrew S. Neumann Principal Engineer, Progress Sonic.
Great Start Collaborative-Wayne Collaborative Meeting November 16, 2015.
Innovation Software Corporation's Cultural Awareness Training Program Presentation by:
© 2004 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice HP OpenView Premier Service HP Restricted.
Satellite communication facilities are provided by the International Maritime Satellite Organization, INMARSAT. The organization was founded in September.
Web Werks Data Center Connects To All Regional ISPs in India to Improve Network Latency.
1 Multimedia Development Team. 2 To discuss phases of MM production team members Multimedia I.
Network and Server Basics. Learning Objectives After viewing this presentation, you will be able to: Understand the benefits of a client/server network.
WWNWS Report to the IRCC Abu Dahbi, May, Membership and Meeting Members: Argentina, Australia, Brazil, Canada, Chile, France, Greece, India, Japan,
Troikaa Translation Services. Troikaa - Introduction ≈ One-stop solution for handling your entire language related service requirements. We have always.
MOBILE NUMBER PORTABILITY. NUMBER PORTABILITY TYPES BENEFITS ECONOMIC ISSUES.
Geospatial Analytics Market to Global Analysis and Forecasts by Type, Technology and Application No of Pages: 150 Publishing Date: Jan 2017 Single.
Small Cell Networks Market to Global Analysis and Forecasts by Small Cell Type, Operating Environment and by Service No of Pages: 150 Publishing.
Geospatial Analytics Market to Global Analysis and Forecasts by Type, Technology and Application No of Pages: 150 Publishing Date: Feb 2017 Single.
Small Cell Networks Market to Global Analysis and Forecasts by Small Cell Type, Operating Environment and by Service No of Pages: 150 Publishing.
Marine Communications
CLOUDENTIFY.
FIXED ETHERNET SWITCH COMPARISON TOOL (v6- presentation mode will activate tool) The information in this document is confidential to Juniper Networks.
Céline Pasty London, 14 April 2016
Satellite Phones Satellite TV Satellite Internet.
Next Generation SATCOM
Multiple Indicator Cluster Surveys Survey Design Workshop
Plan and Safeguard Service Package for SAP S/4HANA
Information Technology Deanship
SmartHOTEL Planner Add-In for Outlook: Office 365 Integration Enhances Room Planning, Booking, and Guest Management for Small Hotels and B&Bs OFFICE 365.
Computer Networking Devices
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
Switching Techniques In large networks there might be multiple paths linking sender and receiver. Information may be switched as it travels through various.
Inmarsat C – I3 > I4 migration
Global Maritime Distress and Safety System (GMDSS)
Address: 223/224 Global Business Park, Chandigarh, Mob: Phone:
DSC.
Routing and Switching Essentials v6.0
Report of the S-124 Correspondence Group of the WWNWS Sub-committee
Social Media and Networking for a University
Trust and Culture on the Web
Media365 Portal by Ctrl365 is Powered by Azure and Enables Easy and Seamless Dissemination of Video for Enhanced B2C and B2B Communication MICROSOFT AZURE.
Switching Techniques.
Satellite AIS Reaches Maturity
5/24/ :22 AM © 2009 Microsoft Corporation. All rights reserved. Microsoft, Windows, Windows Vista and other product names are or may be registered.
Welcome to the New Smart City by TrafficCast…
Spectrum Management System for Developing Countries (SMS4DC) Training on SMS4DC 12 – 14 Feb 2019 Vientiane, Lao P.D.R Aamir Riaz International Telecommunication.
Topic 12: Virtual Private Networks
Cellular Telephone Networks
System Specification in Automotive SPICE®
Presentation transcript:

Inmarsat C – I3 > I4 migration Jean-Marc Duc | Senior Product Manager | Jan-18

Connect smarter. Anywhere. Warning! This presentation is subject to modifications and updates along the migration process in 2018. Please, be sure that you are always consulting the last, updated version! Only the date of the first phase of the migration is known. The migration dates for the other phases will be communicated by Inmarsat later on. Please note that the first migration maybe subject to change as well. For a better readability and a good understanding of the migration please, use the “slide show” mode of PowerPoint Thank you! 17-Feb-19 Connect smarter. Anywhere.

Connect smarter. Anywhere. Our commitment to You! We would like to assure our customers and partners that a vast and long-term planning process has taken place with regards to the planned I4 Migration process by Inmarsat. A number of considerations, potential issues and technical aspects have been reported in advance to Inmarsat by our Engineers and Inmarsat C experts whilst we work in very close coordination, ultimately the migration process is under the control of Inmarsat. Therefore, despite Marlink’s efforts and specialist support to ensure a smooth a migration a 100% predictable outcome cannot be guaranteed. However, as always, Marlink’s dedicated support team will be available throughout the migration phases to support and help partners and end users and will continue to put professionalism and exceptional customer support at the forefront for our customers and partners! 17-Feb-19 Connect smarter. Anywhere.

Connect smarter. Anywhere. Glossary Abbreviation Translation EGC Enhanced Group Call (Fleet Net or Safety Net)  Message broadcasting DNID Data Network Identifier  Polling & Data Reporting services ENID EGC Network Identifier  Fleet Net service LES Land Earth Station (Teleport)  for Marlink: EIK (Norway) & Aussaguel (France) MES Mobile Earth Station (Maritime, Land or Aero) IOR Indian Ocean Region POR Pacific Ocean Region AORE Atlantic Ocean Region East AORW Atlantic Ocean Region West NCS Network Coordination Station  Inmarsat property NOC Network Operational Center  Inmarsat property 17-Feb-19 Connect smarter. Anywhere.

Connect smarter. Anywhere. Migration sequence The migration will take place in 4 steps Step 1: Change of coverage for AORW (54W, 3F5) moving to AMER (98W, 4F3). Step 2: Change of coverage for POR (178E, 3F3) moving to APAC (143.5E, 4F1). Step 3: Relocation of AORE from 15.5W, 3F2 to 54W, 3F5. Step 4: Change of coverage for IOR (64E, 3F1) moving to EMEA (25E, AF1). Coverage moves 40° westward Original satellite’s identifiers (AORW/AORE/IOR/POR) will remain The resulting network configuration will consist of: Three I-4 satellites (4F1-APAC / 4F3-AMER and AF1 (EMEA) One I-3 satellite (3F5-AORE) Timetable Step1: 04 April 2018 17-Feb-19 Connect smarter. Anywhere.

AMER AORW AORE AORE EMEA IOR APAC POR AORE – AORW – IOR – POR I3 – Footprints – 2017  I4 – Footprints - 2018 AMER AORW AORE AORE EMEA IOR APAC POR Inm-C coverage moving ~40° westward AORE – AORW – IOR – POR

Connect smarter. Anywhere. New architecture Initiated since January 2016 in close cooperation with Inmarsat and Cobham The principle is to use NCS satellite interface as a virtual Remote Channel Unit Terrestrial interface and host-computers remain at Marlink. transparent for customers Easy Roll back in case of implementation issue Offer physical backup thanks to back-up NCS antenna / network issue Weather condition Ease satellite transition 17-Feb-19 Connect smarter. Anywhere.

Connect smarter. Anywhere. Inmarsat C Network 17-Feb-19 Connect smarter. Anywhere.

Connect smarter. Anywhere. Current Architecture 17-Feb-19 Connect smarter. Anywhere.

Connect smarter. Anywhere. Target Architecture 17-Feb-19 Connect smarter. Anywhere.

Devices - Impacts Cobham/Sailor JRC - Mr Murata, from Japan Radio Co, LTD confirms that JRC Inmarsat-C will be able to use the Inmarsat-4 - JUE-80 series are for Land Mobile – Automatic Satellite search is inhibited Waiting for Inmarsat & manufacturers report Furuno According to Furuno mother company, the migration should be transparent for all types of Furuno devices. Trimble This manufacturer stopped providing Inmarsat C devices for years. Expertise has been lost. No guarantee about the continuation of the service Others 17-Feb-19 Connect smarter. Anywhere.

MES impacts - Messaging MES to Shore – Messaging: The migration should be transparent for the MES The MES selects the satellite it receives the best The MES will always be under a satellite coverage After the switch, the MES will scan and it will select the satellite it can view It might face a short outage during the switch, nothing more expected Shore to MES – Messaging: The migration should be transparent for the user The message will be received by the LES The LES will be in charge of delivering it to the MES, whatever its location The user might face delays, depending of the pending queue 17-Feb-19 Connect smarter. Anywhere.

Mobile Earth Station (MES) impacts - EGC Enhanced Group Calling (EGC) Safety Net – Fleet Net and System EGC No change for: The principle of EGC distribution The logical denomination of the ocean regions Commands used for the submission of EGC messages by customers Change for: The geographical coverage areas of the logical ocean regions Approximate shift of 40 degrees westward of the coverage of a logical ocean region Customers need to take care of these changes in satellite footprints throughout the migration steps 17-Feb-19 Connect smarter. Anywhere.

Connect smarter. Anywhere. Safety Net Definition: Implementation of the EGC Broadcast service providing maritime safety-related information to the entire Inm-C mobile community Metarea & Navarea zones – definition: Geographical sea regions for coordinating the transmission of meteorological information to mariners. They are part of GMDSS. Each region is identical to NAVAREAs Geographical boundaries of NAVAREAs will not change Change for: The geographical coverage areas of the logical ocean regions Approximate shift of 40 degrees westward of the coverage of a logical ocean region No change for the end users 17-Feb-19 Connect smarter. Anywhere.

Connect smarter. Anywhere. Distress calls - GMDSS The migration has no impact on GMDSS operation The Distress messages will be forwarded to the same and correct authorities The Safety Net plan will be provided at a later stage 17-Feb-19 Connect smarter. Anywhere.

Migration – Effect on Data Report AORW AORE IOR LES 21 Vessel settings: AORW- AORE DNID-01234 LES 021 - 121 Vessel settings: AORE DNID-01234 LES 121 DNID-01234 17-Feb-19 Connect smarter. Anywhere.

General possible impacts Services Criticity Impacts Mobile login Mobiles scan the sky  other/new coverage  automatic log-in (possible delay due to congestion) Messaging No concrete impacts on mobiles or shore-based users Fleet Net (EGC) No impact on an end-user perspective Safety Net (EGC) Polling - Possible long pending queue at NCS level  delays - Massive number of poll commands due to continuous transmissions generated by automatisms/robots creating long pending queue  delays Data Reporting - No DNID in the new coverage or no scheduling program  Mobiles stop reporting - Delays in data transmission due to difficulties to send poll commands to the mobiles 17-Feb-19 Connect smarter. Anywhere.

AORE – AORW – IOR – POR I3 – Footprints - 2017 ,, ,,0 I3 – Global Coverage AORE – AORW – IOR – POR

Connect smarter. Anywhere. Phase 1 – AORW to AMER – Q2-2018 Network configuration Primary NCS – Laurentides Backup NCS – Paumalu Satellite footprint I3  132W to 24E I4  176W to 20W Notable changes 20W to 14W covered by AORE only Mediterranean Sea not covered by AMER No triple coverage anymore Gulf of Guinea not covered by AMER Operating device Mobiles to be program again to operate within AORE Our strong recommandation: Switch devices sailing between 24° E and the 20° W to AORE before the phase 1 of the migration. 17-Feb-19 Connect smarter. Anywhere.

From: I3 at 132W to 24E  I4 at 176W to 20W NCS Burum NCS Laurentides NCS Fucino NCS Paumalu NCS Perth Phase 1 – AORW – end Q1-18 AORE – AORW > AMER – IOR – POR

From: I3 at 132W to 24E  I4 at 176W to 20W NCS Burum NCS Laurentides NCS Fucino NCS Paumalu NCS Perth Phase 1 – AORW – 4-Apr-18 AORE – AORW > AMER – IOR – POR

Connect smarter. Anywhere. Phase 2 – POR to APAC – Q2/3-2018 Network configuration Primary NCS – Perth Backup NCS – Paumalu Satellite footprint I3  100E to 104W I4  66,5E to 138,5W Notable changes 105W to 140W covered by AORW only French Polynesia just on POR limit now covered by AMER Gulf of Bengali covered by POR Operating devices Mobiles to be program again to operate within AORW Our strong recommandation: Switch devices sailing between 104° W and 138,5° W to AMER/AORW before the phase 2 of the migration. 17-Feb-19 Connect smarter. Anywhere.

From: I3 at 100E to 104W  I4 at 66,5E to 138,5W ,, ,,0 NCS Burum NCS Laurentides NCS Fucino NCS Paumalu NCS Perth NCS Auckland Phase 2 – POR – End Q2-18 AORE – AMER – IOR – POR > APAC

From: I3 at 100E to 104W  I4 at 66,5E to 138,5W ,, NCS Burum NCS Laurentides NCS Fucino NCS Paumalu NCS Perth NCS Auckland Phase 2 – POR – End Q2-18 AORE – AMER – IOR – POR > APAC

Connect smarter. Anywhere. Phase 3 – AORE to 54W – Q3/4-2018 Network configuration Primary NCS – Burum Backup NCS – Fucino Satellite footprint I3  93,5W to 62,5E I4  132W to 24E Notable change 25E to 65E covered by IOR only East Africa, Seychelles, Mauritius covered by IOR/EMEA only Operating devices Mobiles to be program again to operate within IOR Our strong recommandation: Switch devices sailing between 62,5° E and 24° E to IOR before the phase 3 of the migration. 17-Feb-19 Connect smarter. Anywhere.

From: I3 at 93,5W to 62,5E  I4 at 132W to 24E NCS Burum NCS Laurentides NCS Fucino NCS Paumalu NCS Perth Phase 3 – AORE – End Q3-18 AORE – AMER – IOR – APAC

From: I3 at 93,5W to 62,5E  I4 at 132W to 24E NCS Burum NCS Laurentides NCS Fucino NCS Paumalu NCS Perth Phase 3 – AORE – End Q3-18 AORE – AMER – IOR – APAC

Connect smarter. Anywhere. Phase 4 – IOR to EMEA – Q4-2018 Network configuration Primary NCS – Fucino Backup NCS – Burum Satellite footprint I3  14W to 142E I4  32W to 70E Notable change Very small overlap between APAC and EMEA From India to Kiribati covered by APAC only Operating devices Mobiles to be program again to operate within POR Our strong recommandation: Switch devices sailing between 142° E and the 70°E to APAC/POR before the phase 4 of the migration. 17-Feb-19 Connect smarter. Anywhere.

From: I3 at 14W to 142E  I4 at 32W to 70E ,,0 NCS Burum NCS Laurentides NCS Fucino NCS Paumalu NCS Perth Phase 4 – IOR – end Q4-18 AORE – AMER – IOR > EMEA – APAC

Marketing material & contact Dedicated Marlink Web-Page = https://marlink.com/inmarsatc-i4-migration/ dynamic digital map C Migration Plan PPT user guide Dedicated Mailbox = Inm-c.migration@marlink.com Contact concerning this particular presentation: Jean-Marc Duc Senior Inm-C Product Manager Aussaguel Teleport +33 6 88 05 16 02 jeanmarc.duc@marlink.com 17-Feb-19 Connect smarter. Anywhere.

Connect smarter. Anywhere. 17-Feb-19 Connect smarter. Anywhere.