Thomas Roser Muon collaboration meeting February 8-10, 2002 AGS beam intensity upgrades What has been achieved Sextupole power supply upgrades Bunch manipulation.
Preliminary results and ideas for the SPS upgrade MDs on LHC beams in 2011 G. Rumolo on behalf of all the MD team (Elena, Thomas, Karel, Christina, Holger,
Lot’s of time lost due to cryo problem in IR8. Major impact, therefore review of MD program… Start discussion here, please let us know your input. Will.
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Final results of the E-Cloud Instability MDs at the SPS (26 and 55 GeV/c) G.
LHC beams in the SPS in 2014 H. Bartosik, G. Rumolo, G. Iadarola With the help from K. Kornelis, V. Kain and SPS OP crew.
PS (electron cloud?!) instability at flat top Mauro Pivi Gianni Iadarola, Giovanni Rumolo, Simone Gilardoni, Hannes Bartosik, Sandra Aumon 27/06/2012 ICE.
Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
PS (electron cloud?!) instability at flat top Mauro Pivi Gianni Iadarola, Giovanni Rumolo, Simone Gilardoni 05/06/2012 LIU-PS meeting, CERN.
Elias Métral, LHC Beam Commissioning Working Group meeting, 08/06/2010 /191 SINGLE-BUNCH INSTABILITY STUDIES IN THE LHC AT 3.5 TeV/c Elias Métral, N. Mounet.
Nominal intensity bunches ● First ramp with nominal intensity bunches suffered from an instability appearing around 1.8 TeV. ● Nominal intensity bunches.
Some ideas for/from the SPS LIU-SPS team. Scrubbing (only) for ecloud in SPS? aC coating remains baseline..... –but scrubbing has many potential advantages.
Content  The LHC beams produced  LINAC2 & PSB  The PS  The SPS  Super Cycles and N0n-LHC physics  Conclusions IEFC Workshop, 8 March 2012 Rende.
Elias Métral, SPSU Study Group and Task Force on SPS Upgrade meeting, 25/03/2010 /311 TMCI Intensity Threshold for LHC Bunch(es) in the SPS u Executive.
News on TMCI in the SPS: Injecting high intensity bunches Benoit for the MD team: T. Bohl, K. Cornelis, H. Damerau, W. Hofle, E. Metral, G. Rumolo, B.
SPS proton beam for AWAKE E. Shaposhnikova 13 th AWAKE PEB Meeting With contributions from T. Argyropoulos, T. Bohl, H. Bartosik, S. Cettour.
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
A preliminary overview on the 2014 Scrubbing Run II The scrubbing team, i.e. H. Bartosik, G. Iadarola, K. Li, L. Mether, A. Romano, G. Rumolo, B. Salvant,
LIU-PS Beam Dynamics Working Group Introduction and objectives
Floating MD week 28 summary
Wednesday 3rd October - morning
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Brief introduction to the Injector MD days
Summary of the dedicated MD on July 4th 50ns in SPS with nominal and low γt optics – transverse aspects T. Argyropoulos, H. Bartosik, T. Bohl, A. Burov,
Longitudinal beam parameters and stability
Proposals for 2015 impedance-related MD requests for PSB and SPS
Saturday 21st April 00:33 Interlock during ramp on BLM HV
LHC injection W. Bartmann, M.J. Barnes, C. Bracco, F. Burkart, E. Carlier, B. Goddard, V. Kain, R. Steerenberg, L. Stoel, F. Velotti, C. Wiesner, C. Xu.
Update on the HiLumi/LIU parameters and performance ramp up after LS2
PS operational beams 15 September 2017
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Tuesday 11th September LHCb dipole presently fault off
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
Thursday morning – optics correction
Monday 6th August & night
Beam requirements and operational scenarios in 2010
G. Arduini, R. Calaga, E. Metral, G. Papotti, G. Rumolo, B. Salvant, R
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Lost at 12:05 to power converter (RTQX2.R1) problem
The LHC25ns cycle in the PS Triple splitting after 2nd injection
Friday 31st August & night
LHC Morning Meeting - G. Arduini
Introduction to LHC beam production in PSB and PS
Sunday
LHC Morning Meeting - G. Arduini
Tuesday morning 09:30 Beam dump, SIS dump due to lost connections with FCG FECs. Coincides with starting a development SIS server to test new interlocks.
Monday 24 October hours of 25ns MD
News on TMCI in the SPS: Injecting high intensity bunches
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Beam dynamics requirements after LS2
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Saturday 3rd November - morning
IP8 aperture measurements (07:30-10:30)
Collective effects in the SPS and LHC (longitudinal plane)
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
CERN-SPS horizontal instability
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Wednesday h18: 228b fill lost just before start of ramp.
Another Immortal Fill….
Monday 27th August & night
Thu :00 Dumped beams, refill for Pb-Pb physics. No more protons in 2011… Some changes: Increase of flat top total voltage to 14 MV. Feed-forward.
Monday 14th May 00:03UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS # e11 ppb, 4.11e33 cm-2s-1 13:36.
Tuesday 6th April 8:00 Injection studies 16:00 RF studies
Wednesday 8th (I) 09:22 Fill #1855. Beams dumped by Alice dipole trip Stable beams for 10.5 hours; int. lumi 31 pb-1 After investigation EPC could not.
Daniel, Gianluca and Belen (for the Collimator team)
HI2011 Commissioning Status
Monday 152 bunch operation summary
Presentation transcript:

MSWG Report – SPS OP Crew Week 28 MSWG Report – SPS OP Crew 2/17/2019

Status of beams LHC beams: Fixed target beams: Ions: HiRadMat: Awake: Successful deployment of 100 ns and 50 ns beams in the LHC – operational LHC1 used for BCMS physics beam – operational (sometimes needs injection steering in TI2) LHCINDIV with special INDIVs used for BSRT calibration – operational Fixed target beams: SFTPRO2 – operational (20/37/1120/20; sometimes at slightly lower DC for ZS) Problems with intensity fluctuations in T2 – under observation Ions: Some tests on the ion cycle early this week HiRadMat: Prepared after dedicated MD; 3 injections with FT okay; 4 injections with ZS @ -30kV okay – operational (dedicated run foreseen Wednesday from 8:00 – 22:00) Awake: Took beam regularly during week – operational 2/17/2019

MDs – week 27 4 dedicated MDs in parallel! 2/17/2019

MDs SFTPRO1: Coast test: High intensity MD: Q’’: Chroma measured with and without extraction sextupoles (for simulations and to compute momentum spread). Chroma appears much more positive than measured 2 years ago for same knob value. Coast test: Coast cycle entered into the supercycle Coast sequence could finally not be launched due to block of access to the CBCM main folder. High intensity MD: Longitudinal measurements limited to 3 batches at 1.3e11 ppb Transverse instability measurements taken wit multi- acquisition of headtail monitor Q’’: Checks on horizontal instability and on the effects of stabilization using Q’’ ongoing during night 2/17/2019

MDs Wideband feedback: Longer term plan to measure TMCI mitigation at higher intensities. 2/17/2019

MDs Wideband feedback: Longer term plan to measure TMCI mitigation at higher intensities. Slotline kicker hooked up to power amplifiers. Slotline kicker times up. Relative phases of stripline and slotline needed to be corrected (access this morning) 2/17/2019

Incoming LHC MDs in 2 weeks – special beams: HiRadMat: MD3284: Pb81+ (in principle already taken up to the SPS) MD3300: BCMS with LHC bunch intensity of 0.3E11 and 0.8E11 (in principle already prepared for LHC MD1 except for the lowest intensity) MD2901: LHCINDIV with 0.8E11 and 1.8E11 MD3583: 8b4e – taken in the past but saw some blow-up in the vertical plane along the ramp ( 1.6um) HiRadMat: Starting on Monday – bunches up to 216 with FT cycle 288 bunch beams foreseen for Wednesday after the dedicated MD from 18:00 – 22:00 – no FT beams 2/17/2019