The Geodesign Process designing in geographic space Assessment Models

Slides:



Advertisements
Similar presentations
M1-07: INTEGRATED RISK ASSESSMENT TECHNIQUES Key Objectives: –Familiarization with the tools and techniques available to complete an integrated hazard.
Advertisements

EXERCISE IN MITIGATION DECISIONS MODULE 2 THE MULTI-HAZARD ENVIRONMENT.
Integrating the NASP Practice Model Into Presentations: Resource Slides Referencing the NASP Practice Model in professional development presentations helps.
Using Spatial Information Technology To Fuse Traditional Native and Modern Resource Management Strategies.
Process – Resource Evaluation Design and perform a set of geographically based resource assessments Develop a methodology for prioritizing land according.
Geodesign Changing Geography by Design Rajesh C Mathur Vice Chairman NIIT GIS Ltd.
Note: Lists provided by the Conference Board of Canada
A2 Unit 4A Geography fieldwork investigation Candidates taking Unit 4A have, in section A, the opportunity to extend an area of the subject content into.
Copyright, © Qiming Zhou GEOG3600. Geographical Information Systems GIS as Decision Support Tool.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 5S Decision Theory.
Decision Process Identify the Problem
By Joseph K. Berry W. M. Keck Scholar, University of Denver – August, An Overview of GIS-based Corridor.
Action Logic Modelling Logic Models communicate a vision for an intervention as a solution to a public health nutrition (PHN) problem to:  funding agencies,
Grid-based GIS Modeling Nigel Trodd Modified from Berry JK, GIS Modeling, presented at Grid-based Map Analysis Techniques and Modeling Workshop,
EEP wants to do a better job creating natural ecosystems. CVS provides improved reference data, target design, monitoring, and data management and analysis.
Higher Physical Education
Culebra, Puerto Rico: Multi-Hazard Risk Assessment and Vulnerability Risk Assessment GEOL 4093.
Foster and sustain the environmental and economic well being of the coast by linking people, information, and technology. Center Mission Coastal Hazards.
Care Options for NHS Continuing Health Care (CHC) Wirral PCT Board – 12 February 2008 Tina Long - Director of Strategic Partnerships Sheila Hillhouse -
R-1 Project Risk Management. R-2  Qualitative Risk Analysis  Quantitative Risk Analysis  Risk Response Planning  Sticky note technique  Risk matrix.
Overview of the MAP Assessment Implementation Appoquinimink School District Board Meeting 10/13/09.
THE OFFSHORE SITUATION IN GREECE Municipality of Corfu.
Don Von Dollen Senior Program Manager, Data Integration & Communications Grid Interop December 4, 2012 A Utility Standards and Technology Adoption Framework.
Investment Portfolio Methodologies Pertemuan Matakuliah: A Strategi Investasi IT Tahun: 2009.
BSBPMG508A Manage Project Risk 11.4 Perform Quantitative Risk Analysis Adapted from PMBOK 4 th Edition InitiationPlanning ExecutionClose Monitor Control.
Wetlands and Poverty Reduction Project Anglophone regional practitioners training course MODULE 3 POLICY SETTING AND ADVOCACY By Teddy Tindamanyire, Isah.
Starting the Planning Process & Assessing Needs HSC 489.
© Mahindra Satyam 2009 Decision Analysis and Resolution QMS Training.
Hazards Profile Understand your relevant hazards.
Collaborative Project with the Multipurpose Marine Cadastre Marine Boundary Working Group Arlington, VA December 15, 2009 Zach Ferdaña Chris Bruce Dan.
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
SEA - National plan Electricity Supply Arend Kolhoff Netherlands Commission for EIA Jordan - September 2003.
Lesson 4 ODOT Best Practices. Best Practices Our Challenge: Best Practices for Action-Focused and Resource-Focused analyses are distinct Distinct best.
Decision Theory McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Presentation to NSS Workshop on Identifying Indicators for Monitoring Development Plans 3 – 6 April 2002 M Babita Statistics SA Presentation to NSS Workshop.
Working Technologically Early Stage 1 – Stage 3. Students evaluate by: recounting the steps taken to reach a final solution discussing their likes and.
SUPPLEMENT TO CHAPTER TWO Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1999 DECISION MAKING 2S-1 Chapter 2 Supplement Decision Making.
ENGINEERING DESIGN PROCESS. OBJECTIVES IDENTIFY THE STEPS OF THE ENGINEERING DESIGN PROCESS. DETERMINE CRITERIA FOR THE DEVELOPMENT OF A NEW TECHNOLOGY.
Eureca – European Ecosystem Assessment Proposal 3 March 2008.
Towards a responsible biofuels* development process * And eventually agriculture?
Integrated Health Assessments Jacksonville, Florida – Fairfax St. Wood Treaters Presented by Vernice Miller-Travis and Sarah Malpass.
UNIT 7 MONITORING AND EVALUATION  Monitoring and evaluation is the process of examining progress against institution’s goals or plan.  The term SM &
Lesson 5 ODOT Merging Best Practices. Merging Best Practices Our Task: As the best practices are written, they are not complimentary Can we merge the.
IADB REGIONAL POLICY DIALOGUE June 25-26, Presented by : Ronald Jackson, Director General, ODPEM, Jamaica.
Program Planning for Evidence-based Health Programs.
1 1 The Project Description: Framing the CEQA Analysis Terry Rivasplata.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall Copyright © 2014 Pearson Education, Inc. 8-1 Making Decisions 8.
Resource allocation Practice. A (S=0) 2 B (S=3) 3 C (S=0) 6 D (S=0) 5 F (S=0) 2 E (S=2) Assigning Resource.
Meryem TAHRI Ph.D Student Laboratory of Applied Geology, Geomatic and Environnement Faculty of Science Ben M’sik, University Hassan II – Casablanca, Morocco.
“THE CHILEAN ENERGY SECTOR”
Spatial decision making
Research and analytical work to underpin policy development and analysis LWMEA – Decision Support Tools (DST) Gerrit J. Carsjens Wageningen University,
Chapter 5 Supplement Decision Theory.
cbss. st/documents/cbsspresidencies/10russian/dbaFile263
What does Success mean to you?
THE SUPERFUND PROCESS Assessment and Listing
Introduction of TBO within OptiFrame
Surveillance. Public Health Approach Surveillance What is the Problem ? Problem Risk Factor Identification : What Is the Cause ? Intervention Evaluation.
Masters Module PLANNING AND MANAGING THE USE OF SPACE FOR AQUACULTURE
بعض النقاط التي تؤخذ في الحسبان عند تقييم الاستثمارات الزراعية
Relevant Costs Definition of relevant costs Sunk cost
Future of the ESF ESF Committee Amsterdam, 15/06/2016.
Monitoring & Reporting 2019
Chapter 5: Water management and adaptation
8 Steps to Effective Decision Making
And now the Framework WP4.
Poverty measurement in Mauritius
Common strategy development process I
Friday, October 11, Submitted by:- MUHAMMAD SAYAM Submitted to:- MISS AMEENA.
Presentation transcript:

The Geodesign Process designing in geographic space Assessment Models Intervention Models Rep Models Evaluation Models D M Process Models Change Models Impact Models Adaptive Management Issues of Concern Delphi Process Planning & Design Impact Assessment Decisions Implementation Project Data Spatial Analysis Assessment Maps Suitability Maps Alternative Plans Impact Maps

The Geodesign Process designing in geographic space Step 1 Assessment Models Intervention Models Rep Models Evaluation Models D M Process Models Change Models Impact Models Adaptive Management Step 1 Identify the issues of concern, including such things as: safety, employment, energy, etc. Delphi Process Planning & Design Impact Assessment Issues of Concern Decisions Implementation Project Data Spatial Analysis Assessment Maps Suitability Maps Alternative Plans Impact Maps

Assemble relevant data and construct project database The Geodesign Process designing in geographic space Assessment Models Intervention Models Rep Models Evaluation Models D M Process Models Change Models Impact Models Adaptive Management Planning & Design Impact Assessment Issues of Concern Delphi Process Decisions Implementation Step 2 Assemble relevant data and construct project database Project Data Spatial Analysis Assessment Maps Suitability Maps Alternative Plans Impact Maps

Develop assessment models for each issue The Geodesign Process designing in geographic space Assessment Models Intervention Models Rep Models Evaluation Models D M Process Models Change Models Impact Models Adaptive Management Step 3 Develop assessment models for each issue Delphi Process Planning & Design Impact Assessment Issues of Concern Decisions Implementation Project Data Spatial Analysis Assessment Maps Suitability Maps Alternative Plans Impact Maps

Produce condition assessment maps for each issue The Geodesign Process designing in geographic space Assessment Models Intervention Models Rep Models Evaluation Models D M Process Models Change Models Impact Models Adaptive Management Planning & Design Impact Assessment Issues of Concern Delphi Process Decisions Implementation Step 4 Produce condition assessment maps for each issue Project Data Spatial Analysis Assessment Maps Suitability Maps Alternative Plans Impact Maps

Use group-based decision techniques to determine priorities The Geodesign Process designing in geographic space Assessment Models Intervention Models Rep Models Evaluation Models D M Process Models Change Models Impact Models Adaptive Management Step 5 Use group-based decision techniques to determine priorities Delphi Process Planning & Design Impact Assessment Issues of Concern Decisions Implementation Project Data Spatial Analysis Assessment Maps Suitability Maps Alternative Plans Impact Maps

The Geodesign Process designing in geographic space Step 6 Assessment Models Intervention Models Rep Models Evaluation Models D M Process Models Change Models Impact Models Adaptive Management Planning & Design Impact Assessment Issues of Concern Delphi Process Decisions Implementation Step 6 Produce composite maps showing suitability, capacity, sensitivity, risk, etc. for each land use Project Data Spatial Analysis Assessment Maps Suitability Maps Alternative Plans Impact Maps

The Geodesign Process designing in geographic space Step 7 Assessment Models Intervention Models Rep Models Evaluation Models D M Process Models Change Models Step 7 Create alternate land use plans, exploring various means to achieve optimum results Impact Models Adaptive Management Delphi Process Planning & Design Impact Assessment Issues of Concern Decisions Implementation Project Data Spatial Analysis Assessment Maps Suitability Maps Alternative Plans Impact Maps

The Geodesign Process designing in geographic space Step 8 Assessment Models Intervention Models Rep Models Evaluation Models D M Process Models Change Models Impact Models Adaptive Management Planning & Design Impact Assessment Issues of Concern Delphi Process Decisions Implementation Step 8 Delineate each of the alternative plans – maps, 3D scenes, movies, and performance dashboards Project Data Spatial Analysis Assessment Maps Suitability Maps Alternative Plans Impact Maps

Evaluate the impacts for each of the alternative plans The Geodesign Process designing in geographic space Assessment Models Intervention Models Rep Models Evaluation Models D M Process Models Change Models Impact Models Adaptive Management Planning & Design Impact Assessment Issues of Concern Delphi Process Decisions Implementation Step 9 Evaluate the impacts for each of the alternative plans Project Data Spatial Analysis Assessment Maps Suitability Maps Alternative Plans Impact Maps

The Geodesign Process designing in geographic space Step 10 Assessment Models Intervention Models Rep Models Evaluation Models D M Process Models Change Models Impact Models Adaptive Management Planning & Design Impact Assessment Issues of Concern Delphi Process Decisions Implementation Step 10 Produce impact maps and reports for each plan, compare the alternatives Project Data Spatial Analysis Assessment Maps Suitability Maps Alternative Plans Impact Maps

Select the preferred plan “back to the drawing board” The Geodesign Process designing in geographic space Assessment Models Intervention Models Rep Models Evaluation Models D M Process Models Change Models Impact Models Step 11 Select the preferred plan or go “back to the drawing board” Adaptive Management Delphi Process Planning & Design Impact Assessment Issues of Concern Decisions Implementation Project Data Spatial Analysis Assessment Maps Suitability Maps Alternative Plans Impact Maps

Implement the preferred land use plan (adaptive management) The Geodesign Process designing in geographic space Assessment Models Intervention Models Rep Models Evaluation Models D M Process Models Change Models Impact Models Adaptive Management Planning & Design Impact Assessment Issues of Concern Delphi Process Decisions Implementation Step 12 Implement the preferred land use plan (adaptive management) Project Data Spatial Analysis Assessment Maps Suitability Maps Alternative Plans Impact Maps