Carbon Dioxide Demonstration Project Supporting Research at KU Jyun-Syung Tsau presented for Tertiary Oil Recovery Project Advisory Board Meeting October.

Slides:



Advertisements
Similar presentations
100 years of living science Date Location of Event Development of Gas/Oil Miscibility in Water and Gas Injection Tara LaForce, and Franklin M. Orr, Jr.
Advertisements

MDT JOB PLANNING AND INTERPRETATION
Solution of Benchmark Problems for CO 2 Storage Min Jin, Gillian Pickup and Eric Mackay Heriot-Watt University Institute of Petroleum Engineering.
DESIGNING A WATERFLOOD Designing a water flood involves both technical and economic consideration. Economic analysis are based on estimates of water.
PVT Short Course for Cairo University SPE Student Chapter Ahmed Muaz Khalda Petroleum Company April 23, 2011.
The influence of wettability and carbon dioxide injection on hydrocarbon recovery Saif Al Sayari Martin J. Blunt.
Outline of Presentation
Carbon Dioxide Flooding in Central Kansas Reservoirs G. Paul Willhite Tertiary Oil Recovery Project Tertiary Oil Recovery Advisory Board October 19-20,2001.
DOE HORIZONTAL PROJECT
Field Demonstration of CO 2 Miscible Flooding in the Lansing-Kansas City Formation, Central Kansas Alan P. Byrnes (KGS, PM-BP1) Class II Revisited DE-AC26-00BC15124.
Geological and Petrophysical Analysis Of Reservoir Cores
LABORATORY DETERMINATION OF POROSITY
“RESERVOIR ENGINEERING”
Phase Behavior Solid Organic Precipitation and Mobility Characterization Studies in Support of Enhanced Viscous Oil Recovery On Alaska North Slope
Introduction to Petroleum Production Engineering
DESIGN AND IMPLEMENTATION OF A CO2 FLOOD UTILIZING ADVANCED RESERVOIR CHARACTERIZATION AND HORIZONTAL INJECTION WELLS IN A SHALLOW SHELF CARBONATE APPROACHING.
Petroleum & Natural Gas Eng. Dept.
Dr. Mohammed M. Amro Petroleum Engineering Dept. King Saud University Effect of Scale and Corrosion Inhibitors on Well Productivity in Reservoirs Containing.
Pioneer Natural Resources
E. Putra, Y. Fidra and D.S. Schechter
Overburden Pressure Affects Fracture Aperture and Permeability in a Stress- Sensitive Reservoir Vivek Muralidharan.
Predictive Pore-Scale Modelling
OIL RECOVERY MECHANISMS AND THE MATERIAL BALANCE EQUATION
Group PresentationOctober 2002 Fluid Flow Through The Fracture under Different Stress-state Condition Vivek Muralidharan Dicman Alfred Dr. Erwin Putra.
Monitoring the Movement of CO 2 at the Upper Spraberry Reservoir Using Well Logs Gokul Lakshman Texas A&M University Pioneer Natural Resources.
Texas A&M UniversityFeb, 2004 Application of X-Ray CT to Investigate Effect of Rock Heterogeneity and Injection Rates During CO 2 Flood Process Deepak.
Introduction to Capillary Pressure Some slides in this section are modified from NExT PERF Short Course Notes, However, many of the slides appears.
Upscaling of Foam Mobility Control to Three Dimensions Busheng Li George Hirasaki Clarence Miller Rice University, Houston, TX.
Chapter 1 RESERVOIR.
Ron Cherry, Maged Fam and Emiliano López
Principal Investigators: Ding Zhu and A. D. Hill
1 A Time-Lapse Seismic Modeling Study for CO2 Sequestration at the Dickman Oilfield Ness County, Kansas Jintan Li April 28 th, 2010.
OIL RECOVERY MECHANISMS AND THE MATERIAL BALANCE EQUATION
EGEE 520: Spring 2008 Instructor: Dr. Derek Elsworth By: Sylvain-Didier Kouame A Study of Fluid displacement in Porous Medium using Nitrogen/CO2 injection.
Carbon Dioxide Flooding in Kansas Reservoirs G. Paul Willhite Tertiary Oil Recovery Project 14 th Oil Recovery Conference, March 14-15,2001.
CPGE Surfactant-Based Enhanced Oil recovery Processes and Foam Mobility Control Task 4: Simulation of Field-Scale Processes Center for Petroleum and Geosystems.
Field Demonstration of CO 2 Miscible Flooding in the Lansing-Kansas City Formation, Central Kansas Alan P. Byrnes Kansas Geological Survey Alan P. Byrnes.
 Completed slim-tube tests for MMP measurement.  Completed swelling tests.  Completed phase behavior model.  Completed preliminary geological model.
Laboratory Measurement of Capillary Pressure
Fluid Saturation Introduction
Res A Performed By Gemini Solutions, Inc. May 2001.
CE 3354 Engineering Hydrology Lecture 21: Groundwater Hydrology Concepts – Part 1 1.
Schlumberger / Client Confidential
Case Study : History Matching of Well by Predictive Material Balance Term Project : Advanced Reservoir Engineering Presented By, Namit J Jaiswal B.E (Chemical)
Research Institute of Petroleum Industry
“Perspectives on Montana’s Petroleum Industry” MREA-MPA-MONTAX “Bridges to the Future” Conference October 15, 2009 Dave Ballard President Ballard Petroleum.
0 International Joint Study on CO2-EOR - Study on Applicability of CO2-EOR to Rang Dong Field, offshore Vietnam - Sunao Takagi, Komei Okatsu IEA Collaborative.
Larry Shultz Presents TexasEOR ENHANCED OIL RECOVERY using proprietary solvents to precipitate out the asphaltenes and segregate out and liquify the paraffin waxes while restoring flow to the reservoir with a low boiling point liquid - see
Day1 – Part2 PVT measurements Fluid sampling methods
RESERVOIR ENGINEERING
Two-Stage Upscaling of Two-Phase Flow: From Core to Simulation Scale
Curtis H. Whitson, SPE, NTNU and Pera
Gas Condensate PVT – What’s Really Important and Why?
Saudi Aramco – Course in Advanced Fluid PVT Behavior
Date of download: 10/22/2017 Copyright © ASME. All rights reserved.
Amit Suman and Tapan Mukerji
on Petroleum and Refinery
QC checks on composition
Gas Condensate Reservoirs
Use Quality-Controlled PVT data to set up an EoS model of the reservoir. Ensure that gas Z-factors and C7+ content of the gas are matched accurately.
Gas Condensate Blockage
Gas Condensate Blockage
Gas Condensate Reservoirs
Curtis H. Whitson, SPE, NTNU and Pera
Use Quality-Controlled PVT data to set up an EoS model of the reservoir. Ensure that gas Z-factors and C7+ content of the gas are matched accurately.
QC checks on composition
Fluid samples from gas condensate wells are needed for two main reasons: To provide PVT data for developing a fluid model such as an EOS and/or black-oil.
Gas Condensate Reservoirs
QC checks on composition
Presentation transcript:

Carbon Dioxide Demonstration Project Supporting Research at KU Jyun-Syung Tsau presented for Tertiary Oil Recovery Project Advisory Board Meeting October 19-20, 2001

Supporting Research Activities Simulation –Hall-Gurney field (LKC formation) –Bemis-Shutts field (Arbuckle formation) Laboratory experiments –Slim-tube displacement –Residual oil measurement

Simulation Reservoir simulator –VIP black oil simulator Primary production, waterflooding –VIP compositional simulator CO 2 flooding

Compositional Simulator Equation of state (EOS) for CO 2 -oil phase behavior characterization and properties calculation Peng-Robinson 3-parameter EOS model

Typical Data Preparation for Compositional Simulation C7+ characterization (sub-grouping heavy end) Pseudoization (grouping) Phase behavior calculation (swelling test) Slim-tube displacement

Laboratory Displacement Data to Fine Tune Reservoir Simulator Slim-tube displacement experiment –Ideal porous media –Oil recovery attributed to phase behavior –MMP (minimum miscibility pressure) indicates the pressure required to develop multiple-contact miscibility –Fine tune EOS parameters in reservoir simulator

Schematic of Slim-tube Experiment Apparatus CO 2 source Milton Roy pump Effluent N 2 source CO 2 Oil T TT ISCO pump BPR T

Oil Recovery Performance in Slim-tube Experiment (Letsch #7 oil) Temp: 105 °F

MMP Measurements of Letsch #7 Oil

Oil Recovery Performance Match

Determination of Residual Oil Saturation to Carbon Dioxide Why it is important? Miscibility developed by multiple contact results in variable amount of oil left behind in CO 2 -swept zone Uncertainty in projection of oil recovery by the simulator

Critical Issues to the Measurements Measurement needs to account for –Well defined development of miscibility –Representative fluid and rock properties

Schematic of Residual Oil Saturation Measurement Apparatus

Characteristics of Slim-tube and Core Sample Slim-tubeCore sample Length (inch) I.D. (inch) Bulk volume (cc) Pore volume (cc) Porosity (%) Permeability (md) Porous media Glass beadBerea sandstone

Future Tasks Investigate the effect of displacement rate, core length and structure on residual oil saturation determination Investigate the effect of water saturation on the residual oil saturation to CO 2

Evaluation of Arbuckle Crude Oil for Oil Recovery by CO 2 Displacement Conduct experiment to measure MMP of crude oil obtained from Arbuckle formation Perform simulation to match current field condition and test the reservoir response to pressurization process

MMP Measurements of Peavey #B1 Oil (Bemis-Shutts field) Temp: 108 °F

Current Reservoir Condition Average reservoir pressure is around 500 psia, which is not high enough for CO 2 miscible displacement Reservoir must be pressurized

Approaches Construct a generic model to simulate the process of –Primary production –Pressurization Model contains –126 active production wells in a 2 by 2 square miles area (2560 acres)

Grid Cell System Used in the Model

Cross Section of the Reservoir Formation 11 layers with permeability ranging between 0.2 ~5 md in aquitard and 50 ~1500 md in production zones 86 ft 2 miles aquifer aquitard 3486' 3400'

Satisfactory Match Simulation results were to match –Reservoir average pressure –Cumulative oil and water production –Current oil and water production rate

Observations Reservoir is a layered reservoir with high permeability contrast between layers Bottom water drive Edge water drive does not provide enough energy to support the average reservoir pressure and production performance

Pressure Distribution at the End of Primary Production (Beginning of Pressurization)

Simulation Tests to Pressurize a Project Area 5 spot pattern (10 acres) with 6 confining injectors (within 120 acres)

Well Condition Parameters During the Pressurization Injector –5-spot: BHP: 2000 psia, Qmax: 3000 bbl/day –Confining area: BHP: 2000 psia, Qmax: 3000 bbl/day Producer –5-spot: shut-in –Around confining area: BHP: 1100 psia, Qmax: 300 bbl/day –Other active producers : BHP: 300 psia, Qmax: 300 bbl/day

Pressure Distribution After 3-years Pressurization

Summary of Pressurization Process The magnitude of pressure increase within a pattern depends on the size of the pattern, confining area, and bottom hole pressure control of injectors and producers. The ultimate pressures within the pattern varied from 1200 psia to 1500 psia.

Preliminary Results Attainable reservoir pressure might slightly below the MMP as required for a miscible CO 2 displacement Oil recovery remains relatively high (70 ~85%) for a few hundred psi below MMP

Current Status Oil and gas samples collected from the wellhead and separator were analyzed by Core-Lab High nitrogen content was found on some of the separator samples through the quality check, which suggests the needs to measure MMP and oil recovery using a live oil sample Detailed PVT test and swelling test would be conducted by Core-Lab, and data would be used for compositional simulation