Objectives Provide an overview of the triad approach and its application Describe the elements of the triad approach for practical application Describe.

Slides:



Advertisements
Similar presentations
Overview of the Board’s Quality Management Plan. Topics in this Session  Quality System Overview  Overview of the contents of the Board’s Quality Management.
Advertisements

Vapor Intrusion. What is Vapor Intrusion? The migration of volatile chemical vapors from the subsurface to overlying buildings.
The Voluntary Remediation Program Progress In An Evolving Program September 2012 Keith Bentley Chief, Land Protection Branch Georgia EPD.
1 What is Remediation Process Optimization? How Can It Help Me Identify Opportunities for Enhanced and More Efficient Site Remediation? Mark A. Gilbertson.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Office of Science U.S. Department of Energy Streamlined.
Reuse / Revitalization. What is Reuse / Revitalization? Restoring contaminated and potentially contaminated sites to productive use.
Overview of New EPA Superfund Groundwater Guidance and Tools
EVALUATION OF METHODS AND MODELS USED TO PREDICT WATER QUALITY AT HARDROCK MINE SITES: SOURCES OF UNCERTAINTY AND RECOMMENDATIONS FOR IMPROVEMENT Ann Maest,
Managing Uncertainty through Better Upfront Planning and Flexible Workplans Albert Robbat, PhD Tufts University, Chemistry department Center for Field.
1 MANUFACTURING AND PRODUCTION OF BIOLOGICAL PRODUCTS (ERT 455) HAZARD ANALYSIS AND CRITICAL CONTROL POINT (HACCP) SYSTEM Munira Mohamed Nazari School.
Green Remediation An Overview of the State of the Practice
Importance of Quality Assurance Documentation and Coordination with Your Certified Laboratory Amy Yersavich and Susan Netzly-Watkins.
EnviroSense, Inc. An Overview of Environmental Factors in Developing Brownfields Sites in Massachusetts Presented By: Eric S. Wood, P.Hg., PG, LSP President.
Purpose of the Standards
2010 CEOS Field Reflectance Intercomparisons Lessons Learned K. Thome 1, N. Fox 2 1 NASA/GSFC, 2 National Physical Laboratory.
IMPROVING SITE CHARACTERIZATION Rhode Island’s Perspective IMPROVING SITE CHARACTERIZATION Rhode Island’s Perspective Overview by Leo Hellested, P.E. Chief.
1 Facilitating Reuse at RCRA Sites: Innovative Technologies for Groundwater Characterization and Cleanup Introduction Walter W. Kovalick Jr., Ph.D. Associate.
STANDARDS FOR THE PRACTICE RECREATIONAL THERAPY (ATRA, REVISED 2013) HPR 453.
1 of 23 EPA Inspector General Audit Reports 15 minutes DQO Training Course Day 1 Module 2 Presenter: Sebastian Tindall.
DOEEPADoDDOEEPADoDDOE EPADoDDOEEPADoDDOEEPA DoDDOEEPADoDDOEEPADoD 1 The Intergovernmental Data Quality Task Force (IDQTF) April 2004 Presented By: James.
A Modern Strategy for Hazardous Waste Site Clean-Up: The "Triad" Approach Sept. 27, 2001 ENRY Belgrade, Yugoslavia Daniel M. Powell Technology Innovation.
Triad Approach / Best Management Practices. Triad Approach and BMPs Systematic Planning – Conceptual Site Model (CSM) Dynamic Work Strategies Real-Time.
Activities of the National Water Quality Monitoring Council Gail Mallard, USGS NWQMC Meeting Phoenix, AZ, December 10, 2002.
1 Effective Characterization Technologies Deana M. Crumbling, M.S. Technology Innovation Office U.S. Environmental Protection Agency Washington, D.C. (703)
Site Completion Preliminary Assessment Site Inspection Remedial Investigation Feasibility Study Remedial Design Remedial Action LTRA O&M Site Identified.
Linking Planning & NEPA Overview Mitch Batuzich FHWA Texas Division FHWA Texas Division April 17, 2007.
1 of 39 The EPA 7-Step DQO Process Step 3 - Identify Inputs (45 minutes) Presenter: Sebastian Tindall Day 2 DQO Training Course Module 3.
SERDP- ESTCP- ITRC A PARTNERSHIP Dr. Jeffrey Marqusee ESTCP, Director SERDP, Technical Director.
Area I Burn Pit Santa Susana Field Laboratory RCRA Facility Investigation Work Plan February 19, 2008 Laura Rainey, P.G. Senior Engineering Geologist California.
Waste Program Monitoring Technology Needs and the 21M 2 Effort ETC Brownbag Thursday, May 19, 2005 Daniel Powell, U.S. EPA Office of Superfund Remediation.
1 EPA’s Ground Water Task Force: Presentation of Two Option Papers Available for Public Input : EPA’s Ground Water Task Force: Presentation of Two Option.
Argonne National Laboratory Experience and Perspectives on Environmental Remediation Karen P. Smith Environmental Science Division Argonne National Laboratory.
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
Think safe. Act safe. Be safe. LEHR Site Annual Soil Management Plan Training Sue Fields, Environmental Health & Safety Sept,
Onsite Quarterly Meeting SIPP PIPs June 13, 2012 Presenter: Christy Hormann, LMSW, CPHQ Project Leader-PIP Team.
Date Planning for Compliance with the Final 316(b) Phase II Regulations For APPA – March 8, 2004 David E. Bailey EPRIsolutions.
1 FORMER COS COB POWER PLANT From Characterization to Redevelopment Brownfields2006 November 14, 2006.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
1 Staff Public Workshops Fall 2011 Policy for Siting, Design, Operation and Management of Onsite Wastewater Treatment Systems San Luis Obispo: October.
1 Overview of The Triad Approach Presented to: Society of American Military Engineers Orange County Post Presented by: Bill Girolamo and Bill Musser Environmental.
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
Jeffrey Lively Chief Scientist Radiological Services & Engineering Amec Foster Wheeler.
Stages of Research and Development
Principal Investigator ESTCP Selection Meeting
BLM Decision Making Process
Proposed Plan for No Further Action
Environmental Acquisition Strategy Performance-Based Contracting
Software Quality Control and Quality Assurance: Introduction
EIA approval process, Management plan and Monitoring
Mark L. Brusseau University of Arizona
Multi-year Trends and Event Response
Principal Investigator ESTCP Selection Meeting
Considerations for Optimal Monitoring Program Design
Data Review Team Time Spring 2014.
Corporate Overview.
Sean Anderson, P.Eng., QPESA Steve Russell, B.Sc., QPRA
Linden County Water District
Maintaining quality data throughout the life of a project
EPA Region 10 Alternate Test Procedures and Method Update Rule
ME551/GEO551 Introduction to Geology of Industrial Minerals Spring 2007 SAMPLING.
Project Management Process Groups
Emulsion Task Force Meeting
NACDEP Annual Conference, June 11, 2018
Controlling Project Cost and Schedule
Straight to the Point – Watershed-based Plans Should:
Principal Investigator ESTCP Selection Meeting
Goal-Driven Continuous Risk Management
Goal-Driven Software Measurement
Principal Investigator ESTCP Selection Meeting
Presentation transcript:

Objectives Provide an overview of the triad approach and its application Describe the elements of the triad approach for practical application Describe recent experiences (including successes/ challenges) where the triad approach was used at a military facility

Before there was Triad… DOE’s “Expedited Site Characterization” (ESC) and “Streamlined Approach for Environmental Restoration” (SAFER) USACE’s “Technical Project Planning (TPP) Process” Argonne National Laboratory’s Adaptive Sampling and Analysis Programs (ASAP)

What is TRIAD? USEPA initiative to improve decision quality Reported cost savings from 15 to 50 percent Reported time savings from 30 to 60 percent Case studies indicate generation of more useful data

Triad’s Application Managing uncertainty Focus on overall decision quality as the overarching goal Developing an accurate conceptual site model (CSM)

Systematic Project Planning Most important and applicable of the triad elements Requires greater time and energy on up-front planning Basis for creating a defensible approach and scientifically sound data set Framework to ensure that the data collected are sufficient for site needs

Systematic Project Planning (continued) Requires asking the right questions and strategizing how best to answer them Uses multi-disciplinary, experienced technical staff to develop technical objectives (DQOs) Development of project planning documents to articulate approach to meet DQOs Work Plan Quality Assurance Project Plan Sampling and Analysis Plan

Dynamic Field Activities Can have the greatest impact on cost and time savings Flexible Approach with application to: Any type of field work Site Screening Characterization Remediation Monitoring Any type of regulatory framework CERCLA (removal or remedial) RCRA corrective action State Superfund Leaking USTs Brownfields

Dynamic Field Activities (continued) Work plan includes: Logic for decisions Responsibilities Lines of communication Real-time field decision-making to limit mobilizations Sampling locations are adjusted as data are generated Key element is development of decision logic diagrams to guide field teams Decision logic diagrams are reviewed and approved by stakeholders for appropriateness

Real-Time Measurement Key component of maximizing information value while minimizing cost Often requires a variety of sampling and analytical techniques Field test kits Field instrumentation Rapid sampling platforms In-situ detection technologies Rapid turn around from fixed-base laboratory (using definitive or screening analytical methods) Includes software programs to manage, interpret, display, and map data in real-time

Real-Time Measurement (continued) Often requires collection of collaborative data Demonstration of technologies to understand variability of contamination prior to full-scale field work commencement Comparison of fixed-base lab data to field screening methods Determination of confirmatory sampling program

Triad Summary Systematic project planning… …ensures that the end goal is clearly defined Dynamic work plan strategies… …guides project team in making decisions in the field about how activities will progress Real-time measurement… …makes dynamic work plans possible

Project Example Site: Defense Supply Center Richmond listed on the NPL in 1987 Incomplete CSM Complex geochemical and hydrogeological conditions Chlorinated solvent contamination in ground- water, including suspected residual DNAPL Unique site geochemistry Uncharacterized groundwater/surface water interactions Potential for vapor intrusion into occupied buildings Off-installation groundwater contamination Unclear exit strategy Inadequate remedy performance Lack of public confidence

Project Example (continued) Systematic Project Planning: Development of a technical team with engineering, geology, hydrogeology, chemistry, and biology disciplines Development of appropriate planning documents: dynamic work plan, QAPP, SAP Dynamic Field Activities: Field program used formal decision logic to guide decision-making Real-time measurement: Geophysics Chemical screening Lithologic screening Results to be presented at 9th Annual Joint Services Environmental Management Conference & Exhibition, San Antonio, TX, August 2004

Successes Core technical team cohesiveness Stakeholder concurrence prior to field activities rather than after Delineation real-time Reduction of mobilization costs Use of decision trees Planned potential field deviations (with corrective action) before mobilization Ability to modify program during process without lengthy regulatory review process

Challenges Significant planning effort required Required senior personnel to participate in initial field activities Dynamic schedule and activities limit long-term planning Cost prediction and control Subcontractor procurement Screening technologies still evolving Instrument response variability Significant calibration requirements Data management and real time interpretation/update of CSM Consistent application of decision logic Required regulatory agencies to think “outside of the box”

Sources USEPA OSWER 542-F-01-030a, April 2001 USEPA OSWER 542-R-01-016, October 2001 USEPA OSWER Memorandum No. 9200.1-40-A, May 7, 2003 USEPA OSWER “Using the Triad Approach to Streamline Brownfields Site Assessment and Cleanup”, June 2003 MACTEC Engineering and Consulting, Inc., “Final Supplemental Feasibility Study Work Plan”, January 2004