66th ISOLDE Collaboration Committee meeting

Slides:



Advertisements
Similar presentations
HIE-ISOLDE HEBT: characteristics Beamline diameter: 40 mm (REX: 100 mm) Beamline height: 1.75 m Beamline vacuum: low 1e-7- high 1e-8 mbar Connection of.
Advertisements

Spin Filtering Studies at COSY and AD Alexander Nass for the collaboration University of Erlangen-Nürnberg SPIN 2008, Charlottesville,VA,USA, October 8,
1 FNPB “Common Magnet” Design Introduction Geoff Greene UT/ORNL.
ISOL-SRS project.
MICE RF and Coupling Coil Module Integration Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
October, 2003 P. Fabbricatore and S. Farinon Spectrometer magnets – Possible layout of cryostat in the end region In order to define the cryostat layout.
E166 Collaboration J.C. Sheppard SLAC, October, 2003 E166 Background Test Simulations: Overview-what do we need J. C. Sheppard.
1 On MICE Coordinate System Yury Ivanyushenkov RAL MICE Collaboration CERN, 29 March - 2 April 2004.
TEST BEAMS Stanford Linear Accelerator Center Ted Fieguth DoE/SLAC Program Review April & May 1, 1997.
Status report for Helium bag and Gauss meter installation for D Hiroshi Kou.
27 Feb 2012 Erwin Siesling 1 TSR Max Planck Institute Heidelberg Hie-Isolde LOI endored Jan 2011 TDR submitted Jan.
Space for Nicole Maria J. G. Borge & Magdalena Kowalska.
PAIR SPECTROMETER DEVELOPMENT IN HALL D PAWEL AMBROZEWICZ NC A&T OUTLINE : PS Goals PS Goals PrimEx Experience PrimEx Experience Design Details Design.
Summary of the AWAKE Technical Board Meeting September 2014 – March 2015.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
PH Dept News Long shutdown 1: Baseline Project Project Leader Freddy Bordry Injector shutdown Dec 2012-Mar 2014 means 1 year stop for ISOLDE Physics LS2.
Integration, Installation & Infrastructure Ans Pardons, with input from the WP4 members September 2014.
Forum March 2003H.Taureg1 Magnetic Fields in ALICE Mapping and Monitoring.
HPS Beamline: Background Rates, Sensitivity to Field Uncertainties M. Ungaro1HPS Collaboration Meeting, JLAB, May Concrete Wall thickness Study.
Overview of the GlueX Tagger and Photon Beamline..
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Perspectives for polarized antiprotons Paolo Lenisa Università di Ferrara and INFN - Italy Perspectives for Polarized Antiprotons MENU 2013 – Rome, September.
1 Collaboration Meeting 33 - Glasgow 26 th June 2012 Design Layout Andrew Moss for Alan Grant, STFC.
Report from HIE-ISOLDE HEBT WG J.Bauche‎, P.Farantatos‎, M.Fraser‎, B.Goddard, Y.Kadi‎, D.Lanaia‎, D.Nisbet‎, E.Siesling‎, G.Vandoni‎, D.Voulot‎, E.Zografos.
Maria J. G. Borge Beam Lines for HIE-ISOLDE. Status of HIE-ISOLDE 2 May 2010: 34 LoI submitted 1 Nov 2012: INTC endorsed the increase of 2 GeV-proton.
Floor plans, Infrastructure & Logistics Hie-Isolde Spectrometer Workshop Physics Department, Lund University 10 March, 2011 Hie-Isolde Erwin Siesling.
Plans and schedule for the Long Shutdown LS1 SGUI CERN, 2 February 2012 Hie-Isolde Erwin Siesling.
HIE-ISOLDE Project: Planning & Resources Y. Kadi (EN-HDO) and the HIE-ISOLDE Project team.
Low Momentum dE/dx Testbeam H.P. 7/24/98. Goals for Spectrometer are based on tracking and PID –Multiparticle correlation –production of particle species.
Septum Magnets in Hall A Hall A Collaboration Meeting 6/10-11/2010 John J. LeRose.
HIE-ISOLDE Project Status Report: Planning of Phase II 74th ISOLDE Collaboration Committee meeting November 10th 2015 Y. Kadi.
Physics coordinator report 2015 overview 2016 schedule Safety & access B. 508 & 275 Karl Johnston.
Status of the Solenoid Status of procurement Plans for transport Storage and tests on arrival at CERN Installation in the ISOLDE Hall Location Footprint.
1/28 VISITS TO COMPASS / NA58 Seminar for guides 9 March 2005 Susanne Koblitz Gerhard Mallot.
Proposal for the End Station Test Beam (ESTB) at SLAC John Jaros ALCPG09 Albuquerque September 30, 2009.
HIE-ISOLDE Project 3 rd beam line + HELIOS June 16th 2015 (updated on June 18th) Y. Kadi, S. Maridor.
Plans and schedule for the Long Shutdown LS1 Hie Isolde Physics Coordination Group CERN, 1 March 2012 Hie-Isolde Erwin Siesling.
Installation at Isolde (and costs) TSR at Isolde workshop CERN, 29/30 October 2012 Isolde Erwin Siesling.
SPSC recommendations [Installation at PS-T9] Baby MIND weekly meeting 28 th October 2015.
PH Department News Discussion with management
PANAGIOTIS FARANTATOS(TE/MSC-MNC)* WP3, ESR 4: New Magnet
STRAW TRACKER SYSTEM CAD STATUS :
MECHANICS OF THE FORWARD STRAW TUBE TRACKER (preliminary) Federico Evangelisti INFN - Ferrara GSI - 7/11 dicember 2009.
The LHCb Installation Story
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
IHEP group Shashlyk activity towards TDR
Electron Beamlines Safety Workshop at ELI Beamlines April 2016
Spectrometer Layout (Isometric View)
The ISOLDE Solenoidal Spectrometer project
Status of Solenoidal Spectrometer
Pierre-Alexandre Thonet
Polarized WACS Experiment (E ) Using Compact Photon Source (CPS)
J.A.Crittenden, Y.Li, X.Liu, M.A.Palmer, J.P.Sikora (Cornell)
HIE-ISOLDE Project: Planning & Resources
Magdalena Kowalska, CERN PH-SME-IS
SHMS Q2 with Beam Line Shield Pipe
PH Dept News Long shutdown 1: Baseline Project
Fixed Decay Station at ISOLDE
Present and Future test facilities for High-intensity Targetry CERN
GEANT Simulations and Track Reconstruction
Thomas Nilsson, CERN EP/IS
Cooler e-source Magnetized Beam LDRD Progress Report
INTC matters . Magdalena Kowalska.
Beam Transfer Line Stage 1:
Two-beam Test-stand Design and Construction Status
Polarized 3He target installation
Cooler e-source Magnetized Beam LDRD Progress Report
GEn-RP engineering & design Status
Presentation transcript:

66th ISOLDE Collaboration Committee meeting Experiments and beam lines 66th ISOLDE Collaboration Committee meeting CERN, 29 February, 2013 Marek Pfützner

Experiments Planned or discussed set-ups  Small, removable b-NMR () SAND () CORSET () MAYA/ACTAR Scattering chamber  Large, fixed MINIBALL (15) HELIOS-like spectrometer TSR Spectrometer For the begining two experimental stations are needed. If HELIOS comes, third will be necessary.  - accepted proposal

HIE-Isolde Physics Coordination Group Meeting, September 3, 2012 Previous HEBT design HIE-Isolde Physics Coordination Group Meeting, September 3, 2012

Proposed stage 1 HEBT layout Proposed and accepted at the previous ISCC meeting, October 30, 2012

Stage 1: two stations WALL Passage space 5.2m Electronics? 1.7m left for other setups (1.3m, if passage counted from the open frame) Electronics? 2.7m – open frame Small removable 2.3m -rails 1m – common passage/dewars 1m – common passage/dewars MINIBALL Passage space

Helios magnet (no shielding) WALL Passage space Stray field when 3T in the magnet 3Gs, more than cavities allow 5Gs, public (pacemaker) limit 10Gs, more than beamline allows Stage 2: three stations variant A 5.2m 5m 1m 3.3m Electronics? Small removable 2.7m – open frame 2.3m -rails 0.8m Helios magnet (no shielding) Electronics? 1m – common passage/dewars 1m – common passage/dewars MINIBALL Passage space

Helios magnet (no shielding) WALL Passage space Stage 2: three stations variant A 5.2m 5m 1m 3.3m Electronics? Magnetic shield for 3T in the magnet: 200 mm of steel, 123 tons Small removable 2.7m – open frame 2.3m -rails 0.8m Helios magnet (no shielding) Electronics? 1m – common passage/dewars 1m – common passage/dewars MINIBALL Passage space

Helios magnet (no shielding) WALL 5.2m Passage space Stage 2: three stations variant B 1m 3.3m Electronics? Small removable 2.7m – open frame 2.3m -rails Helios magnet (no shielding) 1m – common passage/dewars 1m – common passage/dewars MINIBALL Passage space Electronics?

Helios magnet (no shielding) WALL Passage space Stage 2: three stations variant C 5.2m 5m Helios magnet (no shielding) 1m – common passage/dewars 1m 3.3m Electronics? MINIBALL Electronics? Small removable 2.3m -rails 0.8m Passage space