Booster Synchrotron Cavities: An Overview in the Context of PIP Mohamed Hassan, Timergali Khabiboulline, Vyacheslav Yakovlev 07/03/2013.

Slides:



Advertisements
Similar presentations
Decimals 10ths and 100ths.
Advertisements

11 th RAL Masterclass Introduction Glenn Patrick Rutherford Appleton Laboratory 12 – 14 March 2008.
ESLS 04 Daresbury Laboratory
TERA (Italy) – IFIC (Spain)
Overview of Fermilab Accelerator Complex and Beam Lines T. Kobilarcik FNAL.
WG 4: High Power Proton Accelerators S. Holmes, J. Thomason PASI Collaboration Meeting April 3-5, 2013.
Comparison of X-ray diffraction patterns of La 2 CuO 4+   from different crystals at room temperature Pia Jensen.
2013 Apr.30-May.03 Shuei EPICS Collaboration Meeting 2013 Spring 1 Acquisition of Long Waveform using Yokogawa SL1000 Shuei YAMADA KEK / J-PARC.
Performance Limitations of the Booster Cavity Mohamed Hassan, Vyacheslav Yakovlev, John Reid.
ISIS Accelerator Division
Proton / Muon Bunch Numbers, Repetition Rate, RF and Kicker Systems and Inductive Wall Fields for the Rings of a Neutrino Factory G H Rees, RAL.
1 Methods of Experimental Particle Physics Alexei Safonov Lecture #8.
Chris Smith Booster RF Cavity Upgrade Contents: The Booster Existing RF Cavities Why Upgrade? New Cavities Prototype Plans University Involvement Prototype.
Ion Accelerator Complex for MEIC January 28, 2010.
Accelerators 2006 Roger Barlow 1: Wakefields 2: The NS-FFAG.
Catalina Island Meeting May, Proton Drivers for Neutrino Factories: The CERN Approach Presented by B. Autin, CERN.
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
PSB magnetic cycle 160 MeV to 2 GeV with 2.5E13 protons per ring A. Blas 2 GeV magnetic cycle 29/04/ Requirements 1.Present performance: 1E13p from.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Paul Derwent 30 Nov 00 1 The Fermilab Accelerator Complex o Series of presentations  Overview of FNAL Accelerator Complex  Antiprotons: Stochastic Cooling.
Experimental Study of the Inductance of a Toroidal Ferrite Core at High frequencies Michelle Walker North Carolina A&T State University Supervisor: Dave.
Status of the PSB 2 GeV Upgrade and the RCS Study SGUI Meeting B. Mikulec, 07 July 2011.
The LHC: an Accelerated Overview Jonathan Walsh May 2, 2006.
22/03/1999A.Blas1 Hollow bunches A. Blas, S. Hancock, S. Koscielniak, M. Lindroos, F. Pedersen, H. Schonauer  Why: to improve space charge related problems.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
Preliminary design of SPPC RF system Jianping DAI 2015/09/11 The CEPC-SppC Study Group Meeting, Sept. 11~12, IHEP.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Limits of MA cavity C. Ohmori KEK. What kind of limit? Voltage Field Gradient Temperature (cooling) –below 200 deg. C for long term (Hitachi Metal Co.).
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
Proton Improvement Plan William Pellico FRA Visiting Committee Meeting March 14-15, 2011.
January 5, 2004S. A. Pande - CAT-KEK School on SNS MeV Injector Linac for Indian Spallation Neutron Source S. A. PANDE.
Contents Overview of 150 MeV FFAG Accelerator
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
Proton Improvement Plan: View from the Directorate (and the DOE) Stuart Henderson PIP Meeting Jan 3, 2012.
Booster Losses Keith Gollwitzer PIP and MI 700 kW review January 2015.
Doug Michael Sep. 16, GeV protons 1.9 second cycle time 4x10 13 protons/pulse 0.4 MW! Single turn extraction (10  s) 4x10 20 protons/year 700.
Proton Improvement Plan William Pellico 44th Fermilab Users' Meeting June 1-2, 2011.
Objectives of the Proton Improvement Plan Stuart Henderson Fermilab Proton Source Retreat Dec. 7-8, 2010.
THE DESIGN OF THE AGS-BASED PROTON DRIVER FOR NEUTRINO FACTORY W.T. WENG, BNL FFAG WORKSHOP JULY 7-11, 2003 KEK, JAPAN.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
High Intensity Booster Operations William Pellico PIP II collaboration Nov. 9 th 2015.
SNuMI: WBS 1.1 Booster Upgrades Eric Prebys $642K FY06$ (no contingency, no G&A) xx% contingency Main Injector & Recycler BNB NuMI Tunnel Booster Ring.
F A Fermilab Roadmap Dave McGinnis May 28, f Fermilab Roadmap - McGinnis Timelines  Divide the road map into three parallel paths  ILC - Energy.
Early Beam Injection Scheme for the Fermilab Booster: A Path for Intensity Upgrade Chandra Bhat Fermi National Accelerator Laboratory DPF2015, ANN ARBOR,
NuFACT06 Muon Source at Fermilab David Neuffer Fermilab.
F D F November 8, 2006Alessandro G. Ruggiero1 of GeV 10-MWatt Proton Driver Target 200-MeV DTL 1.0-GeV FFAG H – Stripping Foil Injection Energy,
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
Overview of Project X ICD and RD&D Plans David Neuffer material from Paul Derwent & Sergei Nagaitsev (AAC Meeting, February 3, 2009)
Longitudinal aspects on injection and acceleration for HP-PS Antoine LACHAIZE On behalf of the HP-PS design team.
Update on RF parameters A.Lachaize11 th HPPS design meeting04/09/13.
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
Booster High Power RF at PIP-II Era John Reid February 18, 2014.
Presenter : Yang Wu McMaster University Work conducted at IHEP.
FFAG Studies at BNL Alessandro G. Ruggiero Brookhaven National Laboratory FFAG’06 - KURRI, Osaka, Japan - November 6-10, 2006.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Summary Vyacheslav Yakovlev Fermilab, USA.
High Power RF Systems for 2-8 GeV Fast Cycling Synchrotron PROJECT X (ICD-2) John Reid September 11, 2009.
Welcome! Robert Zwaska 23 November 2015 Workshop on Booster Performance and Enhancements.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Introduction Vyacheslav Yakovlev Fermilab,
STATUS OF THE ALBA SYNCHROTRON LIGHT SOURCE: FROM COMMISSIONING TO OPERATION M.Pont, CELLS-ALBA
Jeffrey Eldred, Sasha Valishev AAC Workshop 2016
Considerations on RF systems of SPPC collider and its injector chain
Injector Chain General and more about p-RCS
Injector Chain General and more about p-RCS/i-RCS
FFAG Accelerator Proton Driver for Neutrino Factory
DESIGN OF THE HWR CAVITIES FOR SARAF
PSB magnetic cycle 160 MeV to 2 GeV with 2.5E13 protons per ring
Presentation transcript:

Booster Synchrotron Cavities: An Overview in the Context of PIP Mohamed Hassan, Timergali Khabiboulline, Vyacheslav Yakovlev 07/03/2013

Fermilabs Booster Parameters The Fermilab Booster is a synchrotron that accelerates protons from 400 MeV to 8 GeV The Booster circumference is meters, the magnetic cycle is a biased 15 Hz and the RF operates at harmonic 84 of the revolution frequency

Proton Improvement Plan Objectives: Increase the Proton Source throughput while maintain good availability and acceptable residual activation through S. Hederson, Dec 2010 Goals: – PIP should enable Linac/Booster to deliver: 1.80E17 protons per hour (12 Hz) by May 1, 2013 deliver 2.25E17 protons per hour (15 Hz) by January 1, 2016 – while maintaining Linac/Booster availabilty > 85% and residual activation at acceptable levels and ensuring a useful operation life of the proton source through S. Hederson, Dec 2010 S. Henderson, Accelerator Advisory Committee, Nov. 7-9, 2011

Specifications for Design of New Accelerating Cavities for the Fermilab Booster CurrentModified Frequency Range MHzSame V acc 55 KV60 KV (possibly more) R/Q~50 Duty CycleEffectively 25%50% Repetition RateEffectively 7 Hz15 Hz Cavity TuningHorizontal BiasSame Beam Pipe Diameter 2.25>3 Higher Order Mode Impedance <1000 Ohm CoolingLCW at 95 F, Water flow up to 21 gpm Same

Brainstorming Frequency Tuning Variable Volume Variable Permeability Variable Permittivity Tuning Mechanism Piezoelectric Magnetostrictive FerromagneticFerroelectric Tuning Range <0.05%~40%~10%

Slow versus Fast Frequency Tuning Slow Using motor driven mechanism Response time ~60 s Fast Using piezoelectric/ magneto- strictive element Response time ~10 ms Faster Using a ferromagnetic material Response time ~ ms Fastest Using Ferroelectric material Response time ~ ns

Ferromagnetic Tuning Classical way of tuning microwave components using bias current that will change the permittivity of the material

Parallel Biased Cavities Bias Field is Parallel to the RF Field Ferrites with High Saturation Magnetization (Ni-Zn) Larger values of Mu (Larger Losses, Lower Q) Relatively limited by the heating in the ferrites Gradient is limited also by voltage breakdown in air H h

Perpendicular Biased Cavities Bias Field is Perpendicular to the RF Field Ferrites with Relatively Low Saturation Magnetization (Mn- Zn) Smaller values of Mu (Smaller Losses, Larger Q) Cooling is difficult Some environmental hazards because of Beryllium Oxide Only prototypes (up to our knowledge) H h

Comparison Between Booster Cavities FNAL BoosterTRIUMFSSCL LEBEHF-Booster Energy Range [GeV] BiasParallelPerpendicular Frequency [MHz] Peak Gap Voltage [kV] 2* *36 Cavity Length [m]~2.4~1.23~1.25~3.25 Accelerating Time [ms] Repetition Rate Ferrite MaterialNi-ZnYttrium Garnet Ferrite MaterialToshiba, Stackpole TT-G810 Cavity Q Cavity R/Q StatusOperatingPrototype

Tunable Booster Cavities Parallel BiasedPerpendicular Biased Bias Field is Parallel to the RF FieldBias Field is Perpendicular to the RF Field Ferrites with High Saturation Magnetization (Ni-Zn) Ferrites with Relatively Low Saturation Magnetization (Mn-Zn) Larger values of Mu (Larger Losses, Lower Q) Smaller values of Mu (Smaller Losses, Larger Q) H h H h

Voltage Breakdown In Air ~ 3 MV/m (30 KV/cm) In Vacuum (according to Kilpatrick) is ~ 10 MV/m (theoretical) 18 MV/m (measured) Theoretical Kilpatrick Theoretical Peter et. Al. Measured W. Peter, R. J. Fael, A. Kadish, and L. E. Thode, Criteria for Vacuum Breakdown in RF Cavities, IEEE Transactions on Nuclear Science, Vol. Ns-30, No. 4, Aug 1983

Max Field in Air Electric Field for 55KV 1.7 MV/m Assumed 0.25 Blend Radius upon John Reids recommendation

Max Electric Field Electric Field for 55kV 1.7 MV/m Electric Field for 60 kV 1.85 MV/m 3.3 MV/m 3.6 MV/m

Why Perpendicular Biased Cavity Could Achieve Higher Voltage Gradient? Vacuum fills most of the cavity volume (breakdown ~ 100 kV/cm) Vacuum windows are right away on the tuner connection Tuner is filled with dielectric Air fills most of the cavity volume (breakdown ~30 kV/cm) Vacuum windows are nearby the gap Tuner is filled with air

Possible Changes to the Current Design How about rounding the stem corners with large radius >0.25? How about enlarging the stem connection between the tuner and the cavity? How about moving the vacuum window position? How about filling the tuner with dielectric medium (though it might be a problem for cooling)? How about designing a perpendicular biased tuner to be used with the current cavity? How about using TRIUMF cavity (we have one somewhere here in FNAL)?

Conclusion Possible design changes have been identified Major changes in the current tuner have been suggested Perhaps TRIUMF cavity could be used as a test prototype for perpendicular-biased option

Ferroelectric Booster Cavity? High Q across the band ~1000 Fast Response ~ ns But 10% tunability Need high voltage to be applied 50 kV/cm Bias Circuit will be completely different Conceptual, No Prototype Very early developement Would require quite involved development Newsham, D., N. Barov, and J. S. Kim. "RAPIDLY TUNABLE RF CAVITY FOR FFAG ACCELERATORS."

Uranium Compounds under Low Temperature& High Pressure It might be a day that we see ferromagnetic superconducting cavities Aoki, Dai, and Jacques Flouquet. "Ferromagnetism and superconductivity in uranium compounds." arXiv preprint arXiv: (2011). Ferromagnetic Superconducting?