Fault-recovery procedures and associated R&D Frédéric Bouly (IPNO/CNRS) - Isaías Martín (ADEX) MYRRHA accelerator 1 st International Design review WP3.

Slides:



Advertisements
Similar presentations
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 1 Embedded Computing.
Advertisements

Curtis Johnson Process Control Instrumentation Technology, 8e]
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Institut für Angewandte Physik LINAC AG H. Podlech 1 MYRRHA Injector Design and Related R&D 2 nd Open Collaboration Meeting on Superconducting Linacs for.
- 1 -Niš, Serbia, November 11 th - 14 th, 2010 Projekt ISSNBS DAAD Deutscher Akademischer Austausch Dienst German Academic Exchange Service NEW HYBRID.
Filters and Enveloping - A Practical Discussion -
Control and Feedback Introduction Open-loop and Closed-loop Systems
Introduction to Electronic Circuit Design
Pole Placement.
Review 0、introduction 1、what is feedback?
ECE 495: Integrated System Design I
1 Challenge the future Subtitless On Lightweight Design of Submarine Pressure Hulls.
Charge Pump PLL.
Introduction to Electronic Circuit Design
DAM-Île de France Département Analyse, Surveillance, Environnement 06/06/2014 DIF/DASE/B.ALCOVERRO 1 INFRASOUND SENSOR CALIBRATION DEVICE 13/11/2001 Infrasound.
Status and Future of BESSY RF BESSY II operating since 1999 Willy Wien Laboratory groundbreaking 9/2004 HoBiCaT Testfacility for sc cavities Commissioning.
ABC Technology Project
Build to kick kick to win. Shooting skills 2 Outline Shooting mechanism System description Actuator design Lob shots Identification Calibration Towards.
0 - 1 © 2007 Texas Instruments Inc, Content developed in partnership with Tel-Aviv University From MATLAB ® and Simulink ® to Real Time with TI DSPs Vehicle.
High Frequency Distortion in Power Grids due to Electronic Equipment Anders Larsson Luleå University of Technology.
1 Titel van de presentatie Rein Boshuisen, PME Analysis and Performance of a lightweight over-actuated 450mm wafer chuck R. Boshuisen, PME
9.1 Chapter 9 Using Telephone and Cable Networks for Data Transmission Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction.
Communication Systems (EC-326)
© 2012 National Heart Foundation of Australia. Slide 2.
The op-amp Differentiator
25 seconds left…...
SUPRESSION OF LORAN-C NAVIGATION SIGNAL IN DIGITAL CAVE RADIOS (AN EXPERIMENTAL APPROACH) Mr. Antonio Muñoz Group of Technologies in hostile Environments.
We will resume in: 25 Minutes.
Thomas L. Floyd Digital Fundamentals, 9e
Math Review with Matlab:
Tom Powers Practical Aspects of SRF Cavity Testing and Operations SRF Workshop 2011 Tutorial Session.
Lorentz force detuning measurements on the CEA cavity
1 Unité mixte de recherche CNRS-IN2P3 Université Paris-Sud Orsay cedex Tél. : Fax :
RF SYSTEM DESIGN FOR THE TOP-IMPLART ACCELERATOR V. Surrenti, G. Bazzano, P. Nenzi, L. Picardi,C. Ronsivalle, ENEA,Frascati, Italy ; F. Ambrosini, La Sapienza.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Review of LLRF system based on ATCA standard, Dec 3-4, 2007 Piezodriver and piezo control.
Beam tolerance to RF faults & consequences on RF specifications Frédéric Bouly MAX 1 st Design Review WP1 - Task 1.2 Bruxelles, Belgium Monday, 12 th November.
LLRF System for Pulsed Linacs (modeling, simulation, design and implementation) Hooman Hassanzadegan ESS, Beam Instrumentation Group 1.
Digital Signal Processing and Generation for a DC Current Transformer for Particle Accelerators Silvia Zorzetti.
J.L. BIARROTTE, S. BOUSSON, C.JOLY, T. JUNQUERA, J. LESREL, L.LUKOVAC Institut de Physique Nucléaire (CNRS/IN2P3) Orsay – France O. LE DORTZ, J-F.
LLRF Cavity Simulation for SPL
Grzegorz Jablonski, Technical University of Lodz, Department of Microelectronics and Computer Science XFEL-LLRF-ATCA Meeting, 3-4 December 2007 XFEL The.
LLRF ILC GDE Meeting Feb.6,2007 Shin Michizono LLRF - Stability requirements and proposed llrf system - Typical rf perturbations - Achieved stability at.
LLRF-05 Oct.10,20051 Digital LLRF feedback control system for the J-PARC linac Shin MICHIZONO KEK, High Energy Accelerator Research Organization (JAPAN)
1 FNAL SCRF meeting 31/10/2015 Comments from LLRF Shin Michizono (KEK) Brian Chase (FNAL) Stefan Simrock (DESY) LLRF performance under large dead time.
1Matthias LiepeAugust 2, 2007 LLRF for the ERL Matthias Liepe.
RF system issues due to pulsed beam in ILC DR October 20, Belomestnykh, RF for pulsed beam ILC DR, IWLC2010 S. Belomestnykh Cornell University.
1 SPL Collaboration Meeting dec 08 - WG1 Introduction First SPL Collaboration Meeting Working Group 1 High Power RF Distribution System Introduction.
Cavities Auto Recovery with Beam RF&Linac Section - ALBA Accelerators Division Francis Perez Angela Salom.
Wojciech CICHALEWSKI, DMCS_TUL, Seminarium KMiTI LLRF in FEL System sterowania parametrami fali stojącej z zakresu częstotliwości mikrofalowych.
Cornell digital LLRF system S. Belomestnykh LLRF05 workshopCERN, October 10, 2005.
Lecture 25: Implementation Complicating factors Control design without a model Implementation of control algorithms ME 431, Lecture 25.
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
Fault Tolerance in the MYRRHA superconducting linac
R.SREEDHARAN  SOLEIL main parameters  Booster and storage ring low level RF system  New digital Booster LLRF system under development  Digital LLRF.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Kirk Davis.
Superconducting Cavity Control & Fault-Compensation Strategy for MYRRHA F. Bouly (LPSC / CNRS), J.-L. Biarrotte (IPNO / CNRS) LLRF-Beam Dynamics Workshop.
Other Utilities of ALBA LLRF
Digital LLRF: ALBA and Max-IV cases RF&Linac Section - ALBA Accelerators Division Angela Salom.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Wojciech Jalmuzna, Technical University of Lodz, Department of Microelectronics and Computer.
Performance of the cERL LLRF System Takako Miura (KEK) LLRF'15, Shanghai, Nov 4, 2015 (T. Miura) 1 Compact ERL (Energy Recovery LINAC)
FLASH RF gun developments. Sven Pfeiffer for the LLRF team FEL Seminar Hamburg,
Operated by the Southeastern Universities Research Association for the U. S. Department of Energy Thomas Jefferson National Accelerator Facility 6 March.
Matthias Liepe. Matthias Liepe – High loaded Q cavity operation at CU – TTC Topical Meeting on CW-SRF
1 Tuner performance with LLRF control at KEK Shin MICHIZONO (KEK) Dec.07 TTC Beijing (Michizono) S1G (RDR configuration) - Detuning monitor - Tuner control.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Wojciech Jalmuzna, Technical University of Lodz, Department of Microelectronics and Computer.
Overview and System Design for ESS LLRF Systems
Challenges and Perspectives of Accelerator Driven Systems (ADS)
LLRF Functionality Stefan Simrock How to edit the title slide
Challenges, Progress and Plans of SRF CH-Structures
Presentation transcript:

Fault-recovery procedures and associated R&D Frédéric Bouly (IPNO/CNRS) - Isaías Martín (ADEX) MYRRHA accelerator 1 st International Design review WP3 - Task 3.2 WP1 - Task 1.2 Bruxelles, Belgium Tuesday, 13 th November 2012

Accuracy requirements 2 INTRODUCTION Bouly F. & Martín I. MYRRHA accelerator 1st International Design review, Bruxelles13 th November 2012 Requirement on Energy accuracy : 600 MeV ± 1 MeV at the linac ouput. Control systems to ensure stability of the accelerating field and the synchronous phase Superconducting cavities gets a Q 0 (10 10 at 2K) with a 10 6 < Q L < Hz High sensitivity to mechanical perturbations ( Lorentz force, microphonics ) Accuracy requirements

Complete board with analogue mezzanine Objectives 3 INTRODUCTION Bouly F. & Martín I. MYRRHA accelerator 1st International Design review, Bruxelles LLRF Digital system for the control of E acc & ϕ s Signal processing : In phase / Out of phase (I/Q) formalism Cavity frequency tuned to maintain RF power margins (CW) Fast cold tuning system + controller & feedback loop PXI V2 board: 5 ADC (14 80 MHz ), 3 DAC ( MHz ) FPGA handles: IQ demodulation, FIR and PID filtering, online monitoring via SDRAM, embedded NIOS II softcore processor for slow control operations ( collaboration LPNE/IPNO – IN2P3/CNRS Labs) Down converter system (19rack) Study the feasibility of retuning procedures (< 3 sec.) for the individually controlled cavities with a limited margin of CW RF power. Worked based on the β 0.47 linac section Model : cavity + tuning system + feedback/control loops Use of Matlab Simulink TM for time simulation Define the best control strategy for the tuning system - R&D on an adaptive & predictive controller (ADEX). 13 th November 2012

4 Introduction Cavity model & global control strategy - Dynamic study of a fast fault-recovery procedure - Tuning system controller R&D - Conclusion & Prospects Bouly F. & Martín I. MYRRHA accelerator 1st International Design review, Bruxelles13 th November 2012

5 Introduction Cavity model & global control strategy - Dynamic study of a fast fault-recovery procedure - Tuning system controller R&D - Conclusion & Prospects Bouly F. & Martín I. MYRRHA accelerator 1st International Design review, Bruxelles13 th November 2012

RF cavity model 6 Band pass resonator RLC parallel circuit. RF amplifier & beam seen as current generator for the cavity. One can link the cavity parameters ((r/Q), Q 0,Q L ) to R L (or R), L et C. Cavity model & global control strategy Bouly F. & Martín I. MYRRHA accelerator 1st International Design review, Bruxelles StationaryTransient 13 th November 2012

7 Cavity model & global control strategy Bouly F. & Martín I. MYRRHA accelerator 1st International Design review, Bruxelles Control strategy (1/3) Complex plane representation : Cavity not frequency tuned Re Im IbIb O VbVb ψ ψ IgIg VgVg VbVb ϕsϕs V g (at ω 0 = ω) V inc V ref φgφg V cav Accelerating Field :V acc = V cav cos( ϕ s ) = V cI ψ depends on the cavity frequency tuning : V b (at ω 0 = ω) φgφg 13 th November 2012

8 Cavity model & global control strategy Bouly F. & Martín I. MYRRHA accelerator 1st International Design review, Bruxelles Control strategy (2/3) Optimal tuning is achieved to minimise the reflected power at the cavity input. Re Im IbIb O IgIg ϕsϕs V inc V ref V cav V b (at ω 0 = ω) IgIg V inc V ref Optimal frequency (de)tuning : We want to reach the optimal cavity frequency 13 th November 2012

9 Cavity model & global control strategy Bouly F. & Martín I. MYRRHA accelerator 1st International Design review, Bruxelles Control strategy (3/3) Re Im IbIb O ϕsϕs V cav V b (at ω 0 = ω) IgIg V g (at ω 0 = ω) φgφg VgVg VbVb VbVb ψ ψ φgφg V inc V ref Optimal frequency detuning : When the optimal detuning is achieved : φ g = ϕ s 13 th November 2012

10 Cavity model & global control strategy Bouly F. & Martín I. MYRRHA accelerator 1st International Design review, Bruxelles Control scheme for superconducting Cavity Amp. CAVITY Cold Tuning System Amp. Perturbations : Lorentz detuning Microphonics He bath pressure … V cI set-p, V cQ set-p V cI V cQ _ Δf SAF Δf L, Δf mic LLRF Loop CTS Loop Beam Low Level RF Controller Δf He ϕ S set-p φgφg φgφg =0 13 th November 2012

11 Introduction Cavity model & global control strategy - Dynamic study of a fast fault-recovery procedure - Tuning system controller R&D - Conclusion & Prospects Bouly F. & Martín I. MYRRHA accelerator 1st International Design review, Bruxelles13 th November 2012

12 Study of a fault-recovery procedure Bouly F. & Martín I. MYRRHA accelerator 1st International Design review, Bruxelles Fault tolerance for the MYRRHA linac Fault tolerant : less than 10 unintended beam trips longer than 3 seconds - per 3 mounts operation cycle. Main beam trips origins in a linac : Injectors (source, RFQ, re-buncher) 2 injection lines for MYRRHA (1 spare line) RF amplifier Main problem for the individually controlled cavities Local compensation with limited RF CW power: Cavities are independantly powered 1 failed cavity (or 1 Cryomodule) is compensated by 2 cavities (or 2 Cryomodules) placed upstream & 2 cavities (or 2 Cryomodules) placed downstream. One has to be able to detect the failed element and to retune the cavities in less than 3 seconds. 13 th November 2012

13 Study of a fault-recovery procedure Bouly F. & Martín I. MYRRHA accelerator 1st International Design review, Bruxelles LLRF feedback loop model Modelled in I/Q formalism - Transfer function in Laplace domain: Maximum RF power available 30 kW. Numerical system effects : Delay + ZOH + modulator. PI correctors adjusted to minimise beam loading effect. 13 th November 2012

14 Study of a fault-recovery procedure Bouly F. & Martín I. MYRRHA accelerator 1st International Design review, Bruxelles CTS control loop Transfer function of the cold tuning system modelled from measurements 13 th November 2012

15 Study of a fault-recovery procedure Bouly F. & Martín I. MYRRHA accelerator 1st International Design review, Bruxelles Choice for the CTS controller Different option for the Tuning system controller have been studied : A PI corrector - An adaptive and predictive system (from ADEX) Example: Simple frequency controlExample: strong microphonics perturbations The Control is lost with PI controller 13 th November 2012

16 Study of a fault-recovery procedure Bouly F. & Martín I. MYRRHA accelerator 1st International Design review, Bruxelles A fault-recovery scenario Recovery from the failure of a β 0.47 cryomodule Cavity n°76 One of the compensation cavities Cavity n°77 One cavity of the failed module 13 th November 2012

17 Study of a fault-recovery procedure Bouly F. & Martín I. MYRRHA accelerator 1st International Design review, Bruxelles Scenario description compensation cavity Cavity n°76 Failed cavity Cavity n°77 13 th November 2012

18 Study of a fault-recovery procedure Bouly F. & Martín I. MYRRHA accelerator 1st International Design review, Bruxelles Compensation cavity (n°76) 13 th November

19 Study of a fault-recovery procedure Bouly F. & Martín I. MYRRHA accelerator 1st International Design review, Bruxelles Failed cavity (n°77) Motor detuning action at 1 kHz/sec Beam deceleration 150 keV >> keV (higher than acceptable limit from the 0.5 % error tolerance) Motor must detune the cavity at a speed higher than 5 kHz/sec. 13 th November 2012

20 Introduction Cavity model & global control strategy - Dynamic study of a fast fault-recovery procedure - Tuning system controller R&D - Conclusion & Prospects Bouly F. & Martín I. MYRRHA accelerator 1st International Design review, Bruxelles13 th November 2012

21 Tuning system controller R&D Bouly F. & Martín I. MYRRHA accelerator 1st International Design review, Bruxelles The ADEX system The ADEX system use an adaptive and predictive control methodology Predictive : instead of reacting to the error already produced, like PIDs, it predicts the process variable's evolution and thus anticipating to the predicted drifts from their set points. Adaptive : it learns in real time from the changing process dynamics in order to have a permanent precise prediction. The adaptive mechanism informs the driver block about the current process status and of the process output deviation from the desired trajectory. 13 th November 2012

22 Tuning system controller R&D Hardware definition In view of carry out real scale fault-recovery experiment a control prototype board is developed. It may support the execution of both conventional PID and ADEX control Board development collaboration ADEX (A. Nevado) & IPNO (N. Gandolfo). The control period of the ADEX algorithm is 2 milliseconds. PROCESS B3 Delfino Board B2 FPGA Board Cyclone III Main MCU Board dsPIC33F MAIN BUS MAIN BUS ADEXs objective: Executing the controller in less than 2 ms DAC ADC PIEZO Bouly F. & Martín I. MYRRHA accelerator 1st International Design review, Bruxelles13 th November 2012

23 Tuning system controller R&D Bouly F. & Martín I. MYRRHA accelerator 1st International Design review, Bruxelles ADEX controllers execution & communication C bit 28x Delfino Floating-point Series. ADEX controllers algorithm executed in μs. Communication trials have been performed with two Delfinos facing each other. The times spent for reading, writing and handling the necessary data are the following: Reading: μs Writing: μs Handling: μs Overall: μs. 13 th November 2012

24 Introduction Cavity model & global control strategy - Dynamic study of a fault-recovery procedure - Tuning system controller R&D - Conclusion & Prospects Bouly F. & Martín I. MYRRHA accelerator 1st International Design review, BruxellesNovember 13 th 2012

25 Bouly F. & Martín I. MYRRHA accelerator 1st International Design review, BruxellesNovember 13 th 2012 Conclusion Based on existing systems a model of the cavity and its feedback loops have been developed : cavity + cold tuning systems + LLRF system + tuning system control loop. Results from simulations showed that it is possible to retune the cavities in less than 3 seconds. Still, procedure feasibility depends on the failure detection speed : here 30 ms are assumed. It is therefore highly recommended to dispose of a fast tuning system (response time : ~ 1 ms) : Otherwise, in certain cases, the spare RF power margin may not be sufficient The unused cavity can disturb the beam-conditions to fulfil : Beam deceleration must be lower than 0,5% Δw nominal ( ~ 20 keV ) In worst case, the minimum required detuning Δf 12 kHz (> 140 * bandpass) has to be achieved in less than 3 seconds. So we need a tuning system which : Acts on a broad frequency band a minimum of 20/30 kHz around f 0, is quite fast to detune the failed cavity V mini 5 kHz/sec, is very fast and precise for Lorentz detuning and microphionics compensation. On this basis a modular electronic board (prototype) is developed to implement an adaptive & predictive controller of the CTS. To be tested with experimental 700 MHz cryomodule.

26 THANK YOU ! Frédéric Bouly MAX 3rd General meeting, Madrid13 th November 2012