CHINA GO TEAM VISIT 2014 Opening Civil/Military Session

Slides:



Advertisements
Similar presentations
SIP/2012/ASBU/Nairobi-WP/19
Advertisements

Jeffrey T. Williams Manager, RNAV & RNP Group Air Traffic Organization
Presented by United Arab Emirates MID ATM ENHANCEMENT PROGRAM (MAEP) TECHNICAL PROPOSAL.
Erwin Lassooij PBN Programme Manager 30 January 2014
Overview of the PBN Airspace Implementation Processes
PBN ICAO HQ Activities Overview
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
CHINA GO TEAM VISIT 2014 Opening Civil/Military Session Erwin Lassooij ICAO PBN Programme Manager.
Continuous Climb Operations (CCO) Saulo Da Silva
PBN Plan Development Aviation Industry Forum 18 November 2009.
PBN Airspace Concept Workshop ReviewReview. Review of Workshop 2 ✈ 10 day PBN Airspace Design Workshop ✈ ICAO Doc 9992: PBN in Airspace Design ✈ Plan,
International Civil Aviation Organization Block Upgrades Next Steps & AN-Conf/12 Alexander Korsakov Air Navigation Commissioner International Civil Aviation.
PBN Airspace Concept Process
Area Nav: RNP Evolution
ATM Implementation Support by ICAO APAC RSO
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
. Center TRACON Automation System (CTAS) Traffic Management Advisor (TMA) Transportation authorities around the globe are working to keep air traffic moving.
Introduction to PBN Seminar ICAO PBN Implementation 1.
PBN Airspace Concept Workshop ReviewReview INTERNET: pin:
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-105/PIA2 Meteorological information supporting enhanced operational.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-10/PIA 3 Improved Operations through Enhanced En-Route Trajectories.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
1 EUROCONTROL S TRATEGIES FOR The ATM Strategy for the Years As from MATSE/6 decision (Jan. 2000): To cater for forecast increase in demand.
Federal Aviation Administration Integrated Arrival/Departure Flow Service “ Big Airspace” Presented to: TFM Research Board Presented by: Cynthia Morris.
Performance Framework for Efficiency H. Sudarshan
Overview of the PBN Airspace Implementation Processes
Aviation System Block Upgrades and NAV CANADA Planning
SYMPOSIUM OUTCOMES AND THE WAY FORWARD
Workshop on preparations for ANConf/12 − ASBU methodology
ATM Implementation Support by ICAO APAC RSO
Performance Based Navigation The Future
Collaborative Decision Making Module 5 “The Collaborative Environment”
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
Erwin Lassooij PBN Programme Manager 30 January 2014
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
AIRSPACE CONCEPT WORKSHOP CASE STUDY
Workshop on preparations for ANConf/12 − ASBU methodology
SIP/2012/ASBU/Nairobi-WP/19
Presented by United Arab Emirates
Workshop on preparations for ANConf/12 − ASBU methodology
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
PBN Performance Based Navigation
Continuous Climb Operations (CCO) Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
Dynamic wake turbulence separation Saulo da Silva
Hands-on Exercises Performance Based Planning and use of IFSET
Workshop on preparations for ANConf/12 − ASBU methodology
ANConf/12 – Agenda H. Sudarshan
PBN Airspace Concept Workshop
Mr. Kevin Lam Director of Airport Infrastructure & Air Navigation
Basics of RNP.
Workshop on preparations for ANConf/12 − ASBU methodology
Continuous Climb Operations (CCO) Saulo Da Silva
Erwin Lassooij/Joel Morin 30 June 2014
Global Air Navigation Plan (GANP) Aviation System Block Upgrade (ASBU)
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Objective NAV03 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Hands-on Exercises Performance Based Planning and use of IFSET
AIXM and AIRM Analysis Results Summary.
RNAV and RNP Strategy in Japan
Workshop on preparations for ANConf/12 − ASBU methodology
Traffic Management and FUA integration
Good Design Practices Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
AIRSPACE CONCEPT WORKSHOP CASE STUDY
Workshop on preparations for ANConf/12 − ASBU methodology
PBN ICAO HQ Activities Overview
Presentation transcript:

CHINA GO TEAM VISIT 2014 Opening Civil/Military Session Erwin Lassooij ICAO PBN Programme Manager

ICAO/IATA PBN GO Teams Concept for China Go Team visit: Provide best practices and most recent provisions on ICAO PBN airspace/route design from world-class experts with the expectation that China will make best use of the information and accelerate implementation.

China Statement of Work Provide Assessments and Recommendations on: participants' knowledge of PBN and updates based on upcoming changes. design best practices for terminal and en route airspace collaborative design skills in the application of those best practice elements civil-military collaboration in airspace management next steps to put the Airspace design best practices into application to reduce delays, increase safety and improve efficiency of ATM within China. Slide 3

Visit Format (overview) Lectures on best practices Case study exercises Generic TMA Xi’An Enroute Beijing/Shanghai/Guangzhou Civil/military aspects Conclusions/Next steps

Success Story: PBN for Conditional Route

Success Story: PBN for Conditional Route Establishment of PBN Conditional Routes Y8 – Bangkok - Phuket Y9, Y10 – Bangkok-Hat Yai – Kuala Lumpur Y11, Y12 – Bangkok-Singapore Operate since 26 June 2014 Day 1 Usage Data Y8 = 43 flight Y9 = 53 flights Y10 = 46 flights Y11 = 1 flight Y12 = 2 flight

Success Story: PBN for Conditional Route

Success Story: PBN for Conditional Route

Benefits of PBN Safety and Access - Improve airport and airspace access and safety of approach operations in all weather conditions and the ability to meet limiting obstacle constraints caused by challenging terrains or restricted area 9

Pietermaritzburg - Oribi Airport

Challenges NDBs obsolete (50+ years old) – un-reliable Step down NDB procedures – dive and drive Airport in a bowl – high ground on extended center-line of Rwy 16) Obstacle rich environment (transmission mast on extended center-line of Rwy 16) Bad Weather runway – Rwy 16 Bad Weather cloud base < existing NDB minima Many flight cancellations and/or diversions Un-reliable air service for the flying public Airport not financially viable

A Success Story Consequences: A positive business case Implemented 2 X RNP APCH procedures (straight-in) Less diversions due to WX Increased airport accessibility Consequences: Improved, more reliable air service Increased passenger/cargo traffic Increased aircraft movements Use of larger aircraft An emerging local aviation industry An economic turnaround for the airport A positive business case Oribi Airport

Procedures for Phuket 09 Yellow – Current VOR Track Green - PBN Track 13 13

Benefits of PBN Reduction of Delays - Reduce delays at airports and in busy airspace through the application of newly enabled arrival and departure corridors around busy terminal areas, along with improving flight re-routing capabilities, and making the better use of optimally spaced procedures and airspace Courtesy FAA 14

Expectations: Apply new knowledge and skills to: Update PBN implementation plan within 6 months Implement a minimum of two city pairs with PBN routes within twelve months Plan optimized major TMAs including PRD based on PBN within twelve months and dates for implementations to achieve many operational improvements, but can we agree to at least have a significant reduction on delays through increased airspace capacity?

2014 ICAO/IATA PBN Go-Team; PBN Airspace Design Workshop JUNE 30 - JULY 4, 2014   BEIJING, CHINA 09:00- BREAK 12:00-13:00 -16:30 DAY 1 Welcome & Opening Remarks Overview of Course and PBN Processes Lunch Airspace Handbook Designing Routes Procedure Design Considerations 1 2 3 4 5 DAY 2 CDO Design Methods CCO Design Methods Good Design Practice Advanced PBN Changes Introduction to Workshop Exercises TMA – Generic Airspace - Routes / Holds 6 7 8 8a 9 Exercise 1 DAY 3 Designing Volumes and Sectors Group Presentations 10 DAY 4 Safety Criteria and Assumptions TMA – Generic Airspace - Sectors Validation and Implementation 11 12 DAY 5 TMA Case Study Operational Requirements and Scope Assumptions Enablers and Constraints Routes and Holds Summary Week 1 Exercise 2

09:00- BREAK 12:00-13:00 -16:30 Routes and Holds TMA Draft Airspace   BREAK 12:00-13:00 -16:30 DAY 6 Routes and Holds TMA Draft Airspace Lunch TMA Timelines Exercise 2 DAY 7 TMA Presentation / Discussion Identify Support Needed for Implementation Enroute Structure and NavSpecs Enroute Design Exercise Group Presentations (Output 1) 14 Exercise 3 DAY 8 Summary DAY 9 Objective of ICAO PBN Go Team - Success Stories and explanation of schedule and expectations at the end of the workshop - erwin Mil - PBN what it is and first part 1 - erwin 10:30-11:00 Civil/Military Cooperation in Air Traffic Management - Joel Traffic Management, and FUA Integration - Joel Civil Military Cooperation in Enhancing Operations - Joel Civ - lessons learned and discussion walter 16 (1) 17 18 19 20 21 DAY 10 CMAC Process for PBN CDR SUMMARY (Output 2) Review, NEXT STEPS, Closing Remarks - erwin and Noppadol Performance Evaluation - Key Performance Indicators - Discussion with MIL 22 23