NPP Calibration and Validation Rehearsals Janna H. Feeley NASA JPSS Ground Project Greenbelt, MD The Aerospace Corporation El Segundo, CA AMS 2012 Overview.

Slides:



Advertisements
Similar presentations
Testing Relational Database
Advertisements

Module N° 4 – ICAO SSP framework
Figure 2 – ADL Concept of Usage Kerry Grant, JPSS CGS Chief Scientist Raytheon Intelligence and Information Systems, Aurora CO Gary Metz, IDPS ING/PRO.
During spacecraft-level environmental testing, after all instruments were integrated, the government assembled a data clerk team to support test data collection.
JPSS and GOES-R SST Sasha Ignatov
ESTO Advanced Component Technology 11/17/03 Laser Sounder for Remotely Measuring Atmospheric CO 2 Concentrations GSFC CO 2 Science and Sounder.
DCS Architecture Bob Krzaczek. Key Design Requirement Distilled from the DCS Mission statement and the results of the Conceptual Design Review (June 1999):
SQM - 1DCS - ANULECTURE Software Quality Management Software Quality Management Processes V & V of Critical Software & Systems Ian Hirst.
Integrating Changes to JPSS Cross-Track Infrared Sounder (CrIS) SDR Algorithm using the Algorithm Development Library (ADL) Vipuli Dharmawardane 1, Bigyani.
Suomi National Polar-orbiting Partnership (SNPP) Data Access NOAA Satellite Conference April 8-12, 2013 Kevin Berberich NESDIS/OSD NDE Project Photographs.
Release & Deployment ITIL Version 3
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
Effective Methods for Software and Systems Integration
1 Validated Stage 1 Science Maturity Review for {JPSS Algorithm} Presented by Date.
Kerry Grant, Wael Ibrahim, Paula Smit, JPSS CGS Raytheon Intelligence, Information, and Services, Aurora, CO Kurt Brueske, JPSS CGS Raytheon Intelligence,
The Pursuit for Efficient S/C Design The Stanford Small Sat Challenge: –Learn system engineering processes –Design, build, test, and fly a CubeSat project.
JPSS CGS IDPS Product Generation
Chapter 2 The process Process, Methods, and Tools
Unit 5:Elements of A Viable COOP Capability (cont.)  Define and explain the terms tests, training, and exercises (TT&E)  Explain the importance of a.
-Nikhil Bhatia 28 th October What is RUP? Central Elements of RUP Project Lifecycle Phases Six Engineering Disciplines Three Supporting Disciplines.
Page 19/18/2015 Movex User Association Conference – 22 October 2008 Implementing Lawson’s Strategic Human Capital Management A Customer Case Study Kristin.
Common PDR Problems ACES Presentation T. Gregory Guzik March 6, 2003.
T. Dawson, TASC 9/11/13 Use of a Technical Reference in NASA IV&V.
MASSACHUSETTS INSTITUTE OF TECHNOLOGY NASA GODDARD SPACE FLIGHT CENTER ORBITAL SCIENCES CORPORATION NASA AMES RESEARCH CENTER SPACE TELESCOPE SCIENCE INSTITUTE.
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 4 Project Integration Management.
2Object-Oriented Analysis and Design with the Unified Process The Requirements Discipline in More Detail  Focus shifts from defining to realizing objectives.
1. 2 Business Process Reengineering (BPR) “the fundamental rethinking and redesign of processes to achieve dramatic improvements in critical, contemporary.
6.4 N2/N6E Project Review 06 Oct 2011 Project: Preparing Tactical Ocean Optical Products for Future Polar- Orbiting Sensors
.1 RESEARCH & TECHNOLOGY DEVELOPMENT CENTER SYSTEM AND INFORMATION SCIENCES JHU/MIT Proprietary Titan MESSENGER Autonomy Experiment.
Quality Activity Matrix Presented by Sandra Toalston President, SanSeek 1.
GOES Users’ Conference IV May 1-3, 2006 Broomfield, CO Prepared by Integrated Work Strategies, LLC 1 GOES USERS’ CONFERENCE IV: Discussion Highlights Algorithm.
JPSS Common Ground System IDPS NPP Algorithm Operability Verification – Launch Build Characterization Tentative Agenda IDPS OAA 5/10/11.
User Input from past GOES Users’ Conferences Jim Gurka Steve Goodman NOAA/NESDIS GOES-R Program Office Tim Schmit NOAA/NESDIS/ STAR 7 th GOES Users’ Conference.
1 Center for S a t ellite A pplications and R esearch (STAR) Applicability of GOES-R AWG Cloud Algorithms for JPSS/VIIRS AMS Annual Meeting Future Operational.
EUM/SAF/VWG/02/0010, Rev. 3, May 2003 Page 1 The SAF Network Concept and Status Juha-Pekka Luntama, EUMETSAT GRAS Mission Scientist
Diane E. Wickland NPP Program Scientist NPP Science: HQ Perspective on VIIRS May 18, 2011.
Near-Real-Time Simulated ABI Imagery for User Readiness, Retrieval Algorithm Evaluation and Model Verification Tom Greenwald, Brad Pierce*, Jason Otkin,
The Joint Polar Satellite System (JPSS) is the next generation polar-orbiting operational environmental satellite system. The first satellite in the JPSS.
Calibration/Validation of the NPOESS NPP Instruments: Plan Overview National Polar-Orbiting Operational Environmental Satellite System Karen St.Germain,
GOES-R Recommendations from past GOES Users’ Conference: Jim Gurka Tim Schmit Tom Renkevens NOAA/ NESDIS Tony Mostek NOAA/ NWS Dick Reynolds Short and.
March 2004 At A Glance autoProducts is an automated flight dynamics product generation system. It provides a mission flight operations team with the capability.
NOAA Science Week – Kansas City, MO. 30 April 2012 Non Export-Controlled Information GOES-R – System Validation and User Readiness Planning Stephen D.
Strategies for Knowledge Management Success SCP Best Practices Showcase March 18, 2004.
NPP High Rate Data (HRD) Broadcast: Preparing for the Future Timothy Trenkle Patrick Coronado October 6, 2005.
VIIRS Product Evaluation at the Ocean PEATE Frederick S. Patt Gene C. Feldman IGARSS 2010 July 27, 2010.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Aquarius Mission Simulation A realistic simulation is essential for mission readiness preparations This requires the ability to produce realistic data,
Stephen Ambrose GOES-R Data Operations Manager (DOM) OSPO/SPSD March 12, 2013 GOES-R Ground Segment Project Data Operations Support Team System Validation.
Page 1 Land PEATE support for CERES processing Ed Masuoka Gang Ye August 26, 2008 CERES Delta Design Review.
Joint Polar Satellite System (JPSS) Common Ground System (CGS) Rapid Algorithm Updates Kerry Grant, JPSS CGS Chief Engineer Raytheon Intelligence and Information.
State of Georgia Release Management Training
Evolution of the JPSS Ground Project Calibration and Validation System Patrick Purcell, Gyanesh Chander and Peyush Jain JPSS Ground Project NASA, GSFC.
Suomi National Polar-orbiting Partnership (NPP) Martha Maiden Suomi NPP Workshop Sponsored by NASA Applied Sciences Program June 21, 2012.
Review of the 2012 Suomi NPP Applications Workshop: Outcomes, Results, Progress Forrest Melton November 18, 2014 Suomi NPP Applications.
VIIRS Cloud Mask (VCM) CCR Dr. Thomas Kopp – VCM Validation Lead Dr. William Thomas – VCM JAM 1.
N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N NPP DATA ACCESS Mitch Goldberg JPSS Program Scientist June 21, 2012.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
Data Coordinating Center University of Washington Department of Biostatistics Elizabeth Brown, ScD Siiri Bennett, MD.
Info-Tech Research Group1 Info-Tech Research Group, Inc. Is a global leader in providing IT research and advice. Info-Tech’s products and services combine.
JPSS Common Ground System Operational Algorithm Status – Launch Build Characterization Tentative Agenda IDPS OAA 4/5/11.
Page 1 June 26, 2016 NPOESS Preparatory Project (NPP) Science Data Segment (SDS) Ocean PEATE Status and Plans January 27, 2010 Ocean PEATE Team.
1 DEPLOYMENT AND OPERATIONS MODULE 23 ECM SPECIALIST COURSE 1 Copyright AIIM.
Participating SDR Team Members Cross-track Infrared Sounder
GOES-R AIT: Updating the Data Processing System with data from the Himawari-8 Geostationary Satellite Jonathan Wrotny1, A. Li1, A. Ken1, H. Xie1, M. Fan1,
Enterprise Algorithm Change Process
Engineering Processes
By Jeff Burklo, Director
Advanced Product Quality Planning 2nd Edition
Advanced Product Quality Planning 2nd Edition
Presentation transcript:

NPP Calibration and Validation Rehearsals Janna H. Feeley NASA JPSS Ground Project Greenbelt, MD The Aerospace Corporation El Segundo, CA AMS 2012 Overview The National Polar-orbiting Operational Environmental Satellite System Preparatory Project (NPP) Calibration and Validation (Cal/Val) Rehearsals were held in the summer prior to the NPP launch on October 28, Incorporating participation by all those involved in the Cal/Val process - the fourteen discipline teams responsible for Calibration and Validation activities, sensor vendor teams, Joint Polar Satellite System (JPSS) Ground and Flight Project personnel, Raytheon Common Ground System (CGS), and Northrop Grumman Aerospace Systems, Algorithm and Data Products support - the Rehearsals provided the Cal/Val program the opportunity to exercise tools, interfaces, and processes an end-to-end prior to the launch of NPP. The Cal/Val Rehearsals exercised key aspects of the Cal/Val Operations Concepts (OPSCONs) in a manner realistic to the post-launch Cal/Val plans. The Cal/Val Rehearsals were divided into two phases to allow for dedicated and in depth focus on specific areas of the Cal/Val OPSCONs. In addition, simultaneous scheduling with the fourth mission-level NPP Compatibility Test (NCT4) allowed for extended interactions with NPP mission operations and flight project personnel. Objectives The broad objectives of the Cal/Val Rehearsals are as follows, and the figure on the right demonstrates the interfaces tested in support of these objectives. The objectives were fine-tuned within each of the discipline teams according to each teams specific tasks, concerns, and levels of readiness: Objective #1: Demonstrate communication and product flow (data, results, findings) among Cal/Val team members and with the JPSS Project. Objective #2: Demonstrate readiness to access necessary data to support Cal/Val analyses. Objective #3: Demonstrate Cal/Val tool and task readiness for NPP Cal/Val. Objective #4: Exercise the process for requesting and implementing algorithm changes into the operational software. Objective #5: Identify areas requiring rework prior to post-launch readiness. Objective #1: Demonstrate Team Communication & Product Flow With fourteen, geographically dispersed NPP Cal/Val Teams, establishing regular, centralized means for communication of issues and findings is essential to the success of the Cal/Val Program. The Rehearsals required that each team establish regular team tag-ups and team websites in order to efficiently conduct these communications. These communication processes were rehearsed both within the individual Cal/Val teams, as well as across discipline teams, particularly to demonstrate SDR-EDR interactions. These cross- team interactions are essential to providing downstream product teams with awareness of potential impacts to their product, as well as for providing a means to feedback findings to the upstream product teams. In addition to communication within the product teams, communication amongst JPSS project personnel and the Cal/Val community was emphasized during the Rehearsals. A set of point-of-contacts, still in use post-launch, was established for resolution of reported Cal/Val issues and discrepancies. A primary component of this set of POCs is the JPSS Ground Data Product Engineering (DPE) Algorithm Integration Team (AIT), responsible for one-on-one interaction with Cal/Val team members for support of algorithm change verification and general provision of knowledge about specific algorithms. These interactions were established during the Cal/Val Rehearsals and have become a key component of the Algorithm Change Process. Below is a screen shot of the VIIRS SDR-EDR team weblog, through which findings are to be communicated post-launch. Objective #2: Demonstrate Access to Necessary Data The Cal/Val teams will access a multitude of data types to support their analyses. In preparation for this, the Rehearsals required that all Cal/Val team members have appropriate accounts set up for access to these data and that realistic data pulls be exercised. The Cal/Val Rehearsals demonstrated successful access of the following types: NPP Proxy Data Satellite Test Data Correlative and ground truth datasets Data were pulled from GRAVITE, CLASS, SDS and other sources as defined in the Cal/Val OPSCONs with the frequency and volume required post launch. The figure below shows the cumulative data volume pulled the from GRAVITE system during the GRAVITE Transfer Protocol Stress Test of Phase 1 of the Cal/Val Rehearsal. Objective #3: Exercise Cal/Val Tool and Process Readiness The NPP Cal/Val program leverages knowledge and experience from Cal/Val participants in heritage meteorological satellite programs. The individuals within these teams are leveraging heritage tools and processes for execution of the NPP Cal/Val. During the Rehearsals, the NPP Cal/Val teams successfully exercised these heritage tools, as well as newly developed Cal/Val tools with the HDF5 NPP data format using proxy data developed on the GRAVITE System, as well as the Platinum 72 (P72) dataset generated for purposes of NPP System Integration and Test activities. A full complement of sensor modes is represented in the dataset using proxy, synthetic, and spacecraft recorded data collected from thermo-vacuum (TVAC) testing. In addition, the dataset includes all the necessary time synchronized Mission Support Data (MSD) such as ancillary and auxiliary data needed to produce xDRs. The output of the P72 test runs is properly formatted NPP data available for use in exercising Cal/Val tools and applications. Sample tool outputs using NPP proxy data are provided below. In order to successfully validate the NPP products, Cal/Val teams will be making changes to ground processing software as well as sensor look-up tables on orbit. To support timely and efficient implementation of necessary changes, an Algorithm Change Process has been established by the JPSS program, starting with the identification of a discrepancy and ending with the implementation of a fix into the operational software. The individual steps of this process are handled by different responsible individuals, including the Cal/Val teams, JPSS Ground Data Products and Algorithms (DPA), DPE and Interface Data Processing Segment (IDPS) elements, and Raytheon CGS. This introduces a complex process that requires prelaunch rehearsal in order to be demonstrate post launch readiness. The Rehearsal required that specific Cal/Val teams step through the Algorithm Change Process from end-to-end. In addition it required that each team identify a POC to lead this process for post-launch Cal/Val. During the Rehearsals, the Cal/Val teams identified scenarios for modification of a LUT, processing coefficient, and algorithm and successfully stepped through the process for each of these scenarios. In addition, real fixes to ground and sensor processing coefficients were implemented into ops as part of the NCT4 system level test. Below are the outputs from the VCM tuning exercise demonstrated as part of this process. The images show outputs of the VCM Visualization Tool developed by The Aerospace Corporation for purposes of VCM threshold tuning. AMS Objective #4: Exercise Algorithm Change Process Objective #5: Identify Path Forward to Launch Participants in the Cal/Val Rehearsals reported issues in the Cal/Val Rehearsals Issues Log on CasaNOSA, the predecessor for the current Cal/Val Issues Log (see right). These issues were prioritized and worked off by members of the JPSS DPA/DPE prior to launch, establishing a successful process for response to Cal/Val team issues. The DPE AIT roll has remained prominent in the resolution of many of these issues, particularly as a key role in the Algorithm Change Process. Lessons Learned from The NPP Cal/Val were captured in Cal/Val Rehearsal Reports and incorporated into updated Cal/Val OPSCON planning. The Rehearsals ensured significant strides in post-launch planning and readiness, establishing a foundation for the NPP Cal/Val currently in progress. Interfaces tested during the NPP Cal/Val Rehearsals. Cumulative data volume pulled by specific users during the GRAVITE Transfer Protocol Stress Test of Phase 1 of the Cal/Val Rehearsal. Demonstration of the NOAA Center for Satellite Applications and Research (STAR) Integrated Calibration/Validation System using ATMS Proxy Data. Courtesy of Li Bi, NOAA STAR Global gridded VIIRS EDR of Cloud Top Height for orbit 12 of the P72 dataset pulled from GRAVITE (courtesy of Min Oo and Geoff Cureton, Atmosphere PEATE) Overview of tuning impacts to the VIIRS Cloud Mask. On the left is a display of the SDRs; in the middle is the untuned VIIRS Cloud mask; on the right are the results after tuning of relevant thresholds. Courtesy of James Drake and Thomas Kopp, The Aerospace Corporation