Commissioning Procedure for bKAGRA Phase 1 ( )

Slides:



Advertisements
Similar presentations
KAGRA ISC Electrical Components Layout Yuta Michimura Ando Group Department of Physics, University of Tokyo April 17, 2015.
Advertisements

KAGRA Vacuum System VAC (YS) 1 1. Layout (interferometer and survey map) **tilting the optical plane of interferometer for draining water. **horizontal.
LIGO- G05XXXX-00-R 40m meeting, May Experimental update from the 40m team 40m TAC meeting May 13, 2005 O. Miyakawa, Caltech and the 40m collaboration.
KAGRA Vacuum System Items of vacuum sub-group 1 1. Overview VAC (YS) Required Pressure “uhv (ultra-high-vacuum)” in the order of Pa, or lower.
SEO report _SAITO 1. Overall schedule of iKAGRA installation/commissioning change to Michelson Interferometer 2. Scheduling of daily works for installation.
Takanori Sekiguchi ALPS Report, Dec. 26th, 2013 Prototype Test of Type-B 1 Takanori Sekiguchi KAGRA F2F MEETING Feb
Amaldi conference, June Lock acquisition scheme for the Advanced LIGO optical configuration Amaldi conference June24, 2005 O. Miyakawa, Caltech.
Summary of Suspension Configurations Yuta Michimura Department of Physics, University of Tokyo March 18, 2015.
KAGRA Roadmap and Progress Evaluation Assessment S.Miyoki  M.Ando 2012/7/30.
Optical Levers Layout and Cabling Yuta Michimura, Yuya Kuwahara Ando Group Department of Physics, University of Tokyo November 19, 2015.
40m AOS DRD, G R1 40m Auxiliary Optics Support Design Requirements Document & Conceptual Design Michael Smith 10/18/01 Stray Light Control Initial.
New iKAGRA Configuration Yuta Michimura Department of Physics, University of Tokyo 11th KAGRA F2F (University of Tokyo) Feb 6, 2015.
KAGRA ISC Electrical Components Layout Yuta Michimura Ando Group Department of Physics, University of Tokyo December 8, 2015.
Monica VarvellaIEEE - GW Workshop Roma, October 21, M.Varvella Virgo LAL Orsay / LIGO CalTech Time-domain model for AdvLIGO Interferometer Gravitational.
Summary of iKAGRA Test Run Mar 25-31, 2016 Yuta Michimura Department of Physics, University of Tokyo April 12, 2016JGW-T
IKAGRA 初期アラインメント手順 Initial Alignment Procedure for iKAGRA Yuta Michimura Department of Physics, University of Tokyo July 5, 2016JGW-T
Current Status of Main Interferometer Design Yoichi Aso 2011/2/4, LCGT f2f Meeting.
Main Interferometer Subsystem
Summary of iKAGRA Test Run Apr 11-25, 2016 Yuta Michimura Department of Physics, University of Tokyo May 9, 2016JGW-T
Input Mode Matching of LCGT 2012/1/5, Yoichi Aso.
Arm Length Stabilization Conceptual Configuration Yuta Michimura Department of Physics, University of Tokyo JGW-T November 14, 2016.
Cryogenic development in KAGRA
Main Interferometer Subsystem
Main Interferometer Subsystem
Main Interferometer Meeting
Summary of iKAGRA Test Run Mar 25-31, 2016
Summary of iKAGRA Test Run Apr 11-25, 2016
Kazuhiro Yamamoto on behalf of KAGRA collaboration
Yuta Michimura Department of Physics, University of Tokyo
KAGRA Control Room Appearance (tentative)
Yoichi Aso on behalf of the LCGT ISC Group
Vibration Isolation Systems
Summary of the iKAGRA Run
Interferometer Design for bKAGRA Phase 1 and Beyond
iKAGRA初期アラインメント手順 Initial Alignment Procedure for iKAGRA
Arm Length Stabilization Conceptual Configuration
Arm Length Stabilization Conceptual Configuration
Cartoon of the optical layout around IMC, IFI and IMM
40m Laboratory Upgrade Progress Report
Interferometer Design for bKAGRA Phase 1 and Beyond
Summary of iKAGRA Test Run Mar 25-31, 2016
Summary of iKAGRA Test Run Mar 25-31, 2016
Interferometer Design for bKAGRA Phase 1 and Beyond
Interferometer Design for bKAGRA Phase 1 and Beyond
Advanced LIGO optical configuration investigated in 40meter prototype
Interferometer Design for bKAGRA Phase 1 and Beyond
iKAGRA初期アラインメント手順 Initial Alignment Procedure for iKAGRA
Commissioning Procedure for bKAGRA Phase 1 ( )
Summary of the iKAGRA Run
Commissioning Procedure for bKAGRA Phase 1
Commissioning Procedure for bKAGRA Phase 1
Commissioning Procedure for bKAGRA Phase 1 ( )
Progress report from 40m team for the Advanced LIGO
40m TAC Update October 2006 The 40m Team 11 April 2019 G I.
iKAGRA初期アラインメント手順 Initial Alignment Procedure for iKAGRA
Yuta Michimura Department of Physics, University of Tokyo
Status of KAGRA Yuta Michimura on behalf of the KAGRA Collaboration
Commissioning Procedure for bKAGRA Phase 1
Status of KAGRA Yuta Michimura on behalf of the KAGRA Collaboration
Commissioning Procedure for bKAGRA Phase 1
Interferometer Design for bKAGRA Phase 1 and Beyond
Beam Propagation for bKAGRA Phase 1 with flat ETMs
iKAGRA初期アラインメント手順 Initial Alignment Procedure for iKAGRA
Summary of iKAGRA Test Run Mar 25-31, 2016
Interferometer Design for bKAGRA Phase 1
Arm Length Stabilization Conceptual Configuration
KAGRA ISC Electrical Components Layout
Yuta Michimura Department of Physics, University of Tokyo
KAGRA ISC Electrical Components Layout
Presentation transcript:

Commissioning Procedure for bKAGRA Phase 1 (2017.9-2018.3) JGW-T1605692 February 18, 2019 Commissioning Procedure for bKAGRA Phase 1 (2017.9-2018.3) Yuta Michimura Department of Physics, University of Tokyo see, also, JGW-T1605595 for interferometer design and commissioning schedule

Vacuum Layout Legend chamber duct bellows gate valve optical table TRY Vacuum Layout EYT GVbrty φ100 Legend chamber duct bellows gate valve optical table EYC IFI EYA GVetmy φ100 GVitmy φ100 IYA POP IYC GVbsy φ150 IFI IMM PRM PR3 PR2 BS IXC IXA EXA EXC EXT TRX REFL POP GVbsx φ150 GVitmx φ100 GVetmx φ100 GVbrtx φ100 SR2 POS SR3 AS SRM

8.31 Expected Situation PSL & IMC ready, beam reached PRM (by 8.31) TRY Expected Situation EYT PSL & IMC ready, beam reached PRM (by 8.31) BS (by 4.13) and PRs (by 7.6) ready SR2 also ready (by 7.31) EYT BRT installation (7.11-10.2) EYC EYA Yarm evacuated IYA PR3-2 not connected GV closed IYC IFI IMM PRM PR3 PR2 BS IXC IXA EXA EXC EXT TRX REFL POP SR2 POS Xarm evacuated bellows around BS not connected SR3 bellows between SR2 and SR3 not connected AS SRM SR3 installation (7.14-12.19)

9.1-9.8 TRY Connect PR3-2 Duct EYT connect PR3-2 duct to start initial alignment connect it after the start of ETMY CRYp installation EYT BRT installation (7.11-10.2) EYC ETMY CRYp installation starts (9.1-10.31) EYA IYA connect PR3-2 duct IYC IFI IMM PRM PR3 PR2 BS IXC IXA EXA EXC EXT TRX REFL POP SR2 POS SR3 AS SRM SR3 installation (7.14-12.19)

Alignment from IMMT to PR3 9.11-9.15 TRY Alignment from IMMT to PR3 EYT beam spot on PR3 has to be off the center by -5 mm in Y, since there’s no ITM wedge EYT BRT installation (7.11-10.2) EYC ETMY CRYp installation (9.1-10.31) EYA IYA steer IMMT2 to center the beam on PRM and PR2 IYC IFI IMM PRM PR3 PR2 BS IXC IXA EXA EXC EXT TRX REFL POP SR2 POS steer PR2 to -5 mm off in Y from the center of PR3 SR3 AS SRM SR3 installation (7.14-12.19)

Alignment from PR3 to Xend 9.18-9.22 TRY Alignment from PR3 to Xend EYT need to calculate the beam position on GV windows EYT BRT installation (7.11-10.2) EYC ETMY CRYp installation (9.1-10.31) EYA Thorlabs PDA100A (DC PD) IYA ?? mm of the center of GVitmx window IYC IFI IMM PRM PR3 PR2 BS IXC IXA EXA EXC EXT TRX REFL POP SR2 POS steer PR3 to center the beam on BS and reach EXA Thorlabs PDA100A (DC PD) SR3 AS SRM SR3 installation (7.14-12.19)

Alignment from BS to Yend 9.25-9.29 TRY Alignment from BS to Yend EYT need to calculate the beam position on GV windows EYT BRT installation (7.11-10.2) EYC ETMY CRYp installation (9.1-10.31) EYA Thorlabs PDA100A (DC PD) IYA ?? mm of the center of GVitmy window IYC IFI IMM PRM PR3 PR2 BS IXC IXA EXA EXC EXT TRX REFL POP SR2 POS +5.6 mm off the center in Y of EXT BRT (although the beam reach EXT, BRT is not ready yet at this point) SR3 steer BS to reach EYA AS SRM SR3 installation (7.14-12.19)

10.2-10.27 TRY Beam Collimation EYT measure the beam profile at PR3, PR2 and IXA (or IYA) adjust PR2-PR3 lengths if beam looks bad (we won’t try PRMI at first, so we don’t have to move PR2/3 if the beam is not terrible) EYT BRT installation done EYC ETMY CRYp installation (9.1-10.31) EYA EYA NAB installation starts (10.3-11.27) IYA block so that beam don’t reach Yend IYC IFI IMM PRM PR3 PR2 BS IXC IXA EXA EXC EXT TRX REFL POP SR2 POS beam profiling beam profiling (adjust PR2-3 length) SR3 AS SRM SR3 installation (7.14-12.19)

11.1-11.7 TRY Align ETMY EYT align ETMY right after ETMY CRYp installation completion also align TMSY ETMY CRYp installation done align ETMY so that the beam reach REFL EYC EYA EYA NAB installation (10.3-11.27) align TMSY BRT in-vac (ETMY transmission 5-10ppm; maybe too dim to align BRT; use green??) slit at EYA for ETMY alignment IYA IYC IFI IMM PRM PR3 PR2 BS IXC IXA EXA EXC EXT TRX REFL POP SR2 POS block so that beam don’t reach Xend Thorlabs PDA100A (DC PD) SR3 AS block so that beam don’t reach SR3 SRM installation starts (10.31-3.2) SRM SR3 installation (7.14-12.19)

11.8-11.14 Align Aux Optics align REFL, POP, TRY EYT align REFL, POP, TRY EYC align TRY table optics (maybe too dim) EYA EYA NAB installation (10.3-11.27) IYA align POP in-vac optics IYC IFI IMM PRM PR3 PR2 BS IXC IXA EXA EXC EXT TRX REFL POP SR2 POS align REFL table optics block so that beam don’t reach Xend SR3 AS block so that beam don’t reach SR3 SRM installation (10.31-3.2) SRM SR3 installation (7.14-12.19)

Prepare for EY Evacuation 11.15-11.21 TRY Prepare for EY Evacuation EYT preparation works before evacuation EYA NAB won’t be suspended if no time; EY evacuation is first priority EYC prepare for EY evacuation EYA EYA NAB installation (10.3-11.27) EY evacuation is priority IYA IYC IFI IMM PRM PR3 PR2 BS IXC IXA EXA EXC EXT TRX REFL POP SR2 POS align POP table optics block so that beam don’t reach Xend SR3 AS block so that beam don’t reach SR3 SRM installation (10.31-3.2) SRM SR3 installation (7.14-12.19)

11.22-12.8 TRY EY Evacuation EYT monitor beam at REFL, POP, TRY during evacuation (EXT BRT alignment without ETMX; +5.6 mm off the center in Y at EXT) EYC evacuate EYA+EYC EYA EYA NAB installation done (10.3-11.27) IYA IYC EXT BRT installation starts (11.28-2.19) IFI IMM PRM PR3 PR2 BS IXC IXA EXA EXC EXT TRX REFL POP SR2 POS block so that beam don’t reach Xend SR3 AS block so that beam don’t reach SR3 SRM installation (10.31-3.2) SRM SR3 installation (7.14-12.19)

12.8 TRY EY Cooling Starts EYT monitor beam at REFL, POP, TRY, TRX during cool down EYC cool down ETMY EYA keep GVetmy closed (we can open this if we have spare time) IYA IYC EXT BRT installation (11.28-2.19) IFI IMM PRM PR3 PR2 BS IXC IXA EXA EXC EXT TRX REFL POP SR2 POS block so that beam don’t reach Xend SR3 AS block so that beam don’t reach SR3 SRM installation (10.31-3.2) SRM SR3 installation (7.14-12.19)

12.20-26 Alignment from BS to AS TRY Alignment from BS to AS EYT align SR3 to center the beam on SR3 (CHECK: how much offset?) steer SR3 to center the beam on SR2 measure beam profile at SR2 and SR3 AS for Phase 1 is a reflected beam from SR2, extracted at SR3 chamber EYC cool down ETMY EYA IYA IYC EXT BRT installation (11.28-2.19) IFI IMM PRM PR3 PR2 BS IXC IXA EXA EXC EXT TRX REFL POP SR2 POS block so that beam don’t reach Xend SR3, SR2 alignment beam profiling SR3 AS SRM installation (10.31-3.2) SRM SR3 installation done

1.8-2.2 TRY ETMX Installation EYT during ETMX CRYp installation, initial alignment team have spare time we can open GVetmy if we have time we can also connect bellows in central area (but we might have to remove again for PR2-3 length adjustment for PRMI mode stabilization, after March) note that central area cannot be evacuated before SRM completion (3.2) since no GV between BS and SRM EYC cool down ETMY EYA open GVetmy? IYA connect bellows? IYC EXT BRT installation (11.28-2.19) IFI IMM PRM PR3 PR2 BS IXC IXA EXA EXC EXT TRX REFL POP SR2 POS block so that beam don’t reach Xend ETMX CRYp installation starts (1.8-2.2) align AS table optics (1.15-1.19) SR3 AS align AS in-vac optics (1.8-1.12) SRM installation (10.31-3.2) SRM

2.5-2.9 TRY Align ETMX EYT align ETMX right after ETMX CRYp installation completion also, fine align TMSX and TRX EYC cool down ETMY EYA IYA IYC EXT BRT installation (11.28-2.19) IFI IMM PRM PR3 PR2 BS IXC IXA EXA EXC EXT TRX REFL POP SR2 POS slit at EXA for ETMX alignment ETMX CRYp installation done align ETMX so that the beam reach REFL SR3 AS SRM installation (10.31-3.2) SRM

2.12-2.16 Michelson LSC lock Michelson with AS_Q cool down ETMY TRY Michelson LSC EYT lock Michelson with AS_Q EYC cool down ETMY EYA IYA IYC EXT BRT installation (11.28-2.19) PRM misaligned IFI IMM PRM PR3 PR2 BS IXC IXA EXA EXC EXT TRX REFL POP SR2 POS lock Michelson SR3 AS SRM installation (10.31-3.2) SRM

Prepare for EX Evacuation 2.19-2.23 TRY Prepare for EX Evacuation EYT preparation works before vacuation EXA NAB won’t be suspended if no time; EX evacuation is first priority EYC cool down ETMY EYA IYA EXA NAB installation starts (2.20-2.22) EX evacuation is priority IYC EXT BRT installation done IFI IMM PRM PR3 PR2 BS IXC IXA EXA EXC EXT TRX REFL POP SR2 POS prepare for EX evacuation SR3 AS align TMSX BRT in-vac (2.20-2.26) SRM installation (10.31-3.2) SRM

2.23-3.2 TRY EX Evacuation EYT monitor beam at REFL, POP, TRY, AS during evacuation TRX will be available afterwards EYC cool down ETMY EYA IYA alignment of TMSX BRT and TRX table optics (maybe too dim) IYC IFI IMM PRM PR3 PR2 BS IXC IXA EXA EXC EXT TRX REFL POP SR2 POS evacuate EXA+EXC SR3 AS keep GVetmx closed (we can open this if we have spare time) align TRX table optics (2.27-3.5) SRM installation done (3.2) SRM

3.2-3.31 TRY EX Cooling, Test Run EYT monitor beam at REFL, POP, TRY, TRX, AS during cool down keep Michelson locked during cool down until 3.31 → Cryogenic Michelson Test Run (bKAGRA Phase 1 complete) EYC cool down ETMY EYA IYA IYC IFI IMM PRM PR3 PR2 BS IXC IXA EXA EXC EXT TRX REFL POP SR2 POS cool down ETMX SR3 AS align TRX table optics (2.27-3.5) keep Michelson locked SRM

Apr-Jun PRMI PR2-PR3 length adjust PRMI alignment, locking TRY PRMI EYT PR2-PR3 length adjust PRMI alignment, locking connect remaining bellows/ducts evacuate central area open GVs (GVsrm should be closed) EYC cool down ETMY EYA PR2-PR3 length adjust (Michelson re-alignment needed) IYA PRM alignment to make PRC central area evacuation IYC IFI IMM PRM PR3 PR2 BS IXC IXA EXA EXC EXT TRX REFL POP SR2 POS cool down ETMX SR3 lock PRMI with ASC AS GVsrm: closed SRM

To Be Discussed TMS BRT installation schedule and other AOS related issues [Akutsu, Uchiyama, Michimura] - considering wedge, ETMs should be installed before BRT alignment, but transmitted beam from ETM is too dim (~ 0.1 uW); use green? - when to install narrow-angle baffles? Wide-angle baffles (for Pcal and main beam) compatible with ETM HR camera? [Akutsu, Kokeyama, Inoue] Confirm beam spot positions at GVs [Michimura, Aso]